OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 07/03/96 Rev.1 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PL. ANT - UNIT 2

. NOTES

2. REPORTING PERIOD: May-1996
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
10. REASONS FOR RESTRICTIONS, (IF ANY):

Self-imposed restriction because of SG tube plugging, pending further evaluation.

THis MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 3,647.0 208,920.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 728.5 3,631.5 182,958.6
13. RFACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 724.9 3,627.9 180,482.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 981,678.0 4,947,712.0 259,479,865.0
17. GROSS ELECTRICAL ENERGY GENERATED 336,510.0 1,696,900.0 88,200,160.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 320,011.0 1,617,697.0 84,082,346.5

$e

19. UNIT SERVICE FACTOR 97.4 %

99.5 %

86.4 %

20. UNIT AVAILABILITY FACTOR 97.4 %

99.5%

86.5 %

Q@

21. UNIT CAPACITY FACTOR (USING MDC NET) 88.7%

91.5 %

82.4 %

g

22. UNIT CAPACITY FACTOR (USING DER NET) 86.5%

89.2 %

81.0 %

23. UNIT FORCED OUTAGE RATE 2.6%

0.5 %

0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling /SGRP, 10/05/96, 70 days M

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA go DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977

- - - - - - - -