Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1994-003, :on 941121,average Power Exceeded License Power Limit.Caused by Personnel Errors.Counseled Personnel & Placed Limitations on Reactor Power and Thermal Limits Until Feedwater Transmitters Calibr + (04:25:45, 13 December 2024)
- 05000388/LER-1985-011, :on 850310,damper in Standby Gas Treatment Sys Train a Malfunctioned.Caused by Damaged Damper Actuator. Actuator Replaced & Damper Operation Verified to Be Correct on 850312 + (04:25:47, 13 December 2024)
- ML20115E055 + (04:25:51, 13 December 2024)
- ST-HL-AE-1228, Forwards Responses to NRC Question 620.02N,Parts H,I & K & Resubmittal of Responses to Parts a & J Re Detailed Control Room Design Review.Rev 0 to Human Engineering Discrepancy Resolution Rept Also Encl + (04:25:52, 13 December 2024)
- ML20115E030 + (04:25:53, 13 December 2024)
- ML20115E036 + (04:25:53, 13 December 2024)
- ML20115E029 + (04:25:54, 13 December 2024)
- NG-96-1297, Application for Amend to License DPR-49,consisting of TS Change Request RTS-290,revising TS Table 3.6.B.2-1 to Raise Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition + (04:25:54, 13 December 2024)
- ML20115E023 + (04:25:55, 13 December 2024)
- ML20115E021 + (04:25:56, 13 December 2024)
- ML20115E016 + (04:25:56, 13 December 2024)
- ML20115E015 + (04:25:57, 13 December 2024)
- ML20115E012 + (04:25:58, 13 December 2024)
- ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities + (04:25:58, 13 December 2024)
- BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station + (04:25:59, 13 December 2024)
- 05000296/LER-1985-008-01, :on 850309,reactor Manually Scrammed Due to Problems W/Rod Worth Minimizer Program During Controlled Shutdown.Cause Not Stated + (04:26:01, 13 December 2024)
- HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 + (04:26:02, 13 December 2024)
- 3F0796-05, Provides Addl Info on Ventilation & Heat Detectors Associated W/Rcp Oil Collection Sys + (04:26:03, 13 December 2024)
- ML20115D979 + (04:26:03, 13 December 2024)
- JAFP-85-0324, Responds to NRC Re Violations Noted in Insp Rept 50-333/84-24.Corrective Actions:Section 4.8.26 of Procedure PSP-17 Will Be Revised by 851001 to Repeat Air Injection to Ensure Removal of Water from Coolant Dilution Sample Line + (04:26:04, 13 December 2024)
- ML20115D965 + (04:26:05, 13 December 2024)
- ML20115D935 + (04:26:06, 13 December 2024)
- ML20115D962 + (04:26:06, 13 December 2024)
- ELV-04056, Informs That Emergency Response Data Sys (ERDS) Implementation Has Been Completed,Per NUREG-1394.All Applicable Site Procedures Now in Place Along W/Appropriate Configuration Control for Physical Design Implemented + (04:26:07, 13 December 2024)
- ML20115D905 + (04:26:07, 13 December 2024)
- ML20115D898 + (04:26:08, 13 December 2024)
- ML20115D890 + (04:26:09, 13 December 2024)
- ML20115D878 + (04:26:09, 13 December 2024)
- RC-96-0150, Rev 1 to Special Rept Spr 960004,including Info Re Imperfection in SG B,For ISI Activity Completed on 960429 + (04:26:10, 13 December 2024)
- ML20115D867 + (04:26:11, 13 December 2024)
- ML20115D862 + (04:26:12, 13 December 2024)
- ML20115D857 + (04:26:13, 13 December 2024)
- 05000317/LER-1992-003, :on 920521,test Personnel Found MSIV Pipe Tunnel Fire Damper Inoperable Due to Surveillance Procedure Omission.Ts Equipment cross-reference Database Will Be Updated & Drawings Will Be Made More Specific + (04:26:14, 13 December 2024)
- ML20115D852 + (04:26:15, 13 December 2024)
- HL-5199, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-06 & 50-366/96-06.C/A:procedure 34GO-OPS-066-0S Revised & TS Issues Associated W/Event Will Be Discussed in Regularly Scheduled Training for Licensed Operators + (04:26:16, 13 December 2024)
- 0CAN058202, Forwards Recent INPO Review of Emergency Preparedness Program.W/O Encl + (04:26:17, 13 December 2024)
- ML20115D762 + (04:26:19, 13 December 2024)
- ML20115D767 + (04:26:19, 13 December 2024)
- ML20115D757 + (04:26:20, 13 December 2024)
- PY-CEI-NRR-1557, Monthly Operating Rept for Sept 1992 for Perry Nuclear Power Plant,Unit 1 + (04:26:20, 13 December 2024)
- ML20115D730 + (04:26:21, 13 December 2024)
- ML20115D729 + (04:26:22, 13 December 2024)
- ML20115D716 + (04:26:22, 13 December 2024)
- ML20115D711 + (04:26:23, 13 December 2024)
- ML20115D704 + (04:26:24, 13 December 2024)
- RBG-20635, Forwards Partial Response to IE Bulletin 84-03,Item 4 Re Time to Cladding Damage W/O Operator Action & Item 6 Re Emergency Operating Procedures.Addl Info on Item 4 & Refueling Cavity Water Seal Evaluation Expected by 850515 + (04:26:25, 13 December 2024)
- 05000373/LER-1992-009-07, :on 920923,CR Ventilation Train Received Spurious Trip Signal from B Process Radiation Monitor Due to High Radiation Spike.Detector B Adjusted & Limited Procedure LLP-92-159 Implemented + (04:26:26, 13 December 2024)
- ML20115D696 + (04:26:27, 13 December 2024)
- PY-CEI-NRR-2069, Forwards NP059-0005, ISI Summary Rept for PNPP Unt 1. Rept Documents ISI Exam Activities Conducted from Return to Commercial Operation from Fourth Refueling Outage Until Completion of Fifth Refueling Outage + (04:26:28, 13 December 2024)
- BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station + (04:26:31, 13 December 2024)
- ML20115D662 + (04:26:32, 13 December 2024)
- ML20115D682 + (04:26:32, 13 December 2024)