Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116H452 + (03:27:46, 13 December 2024)
- ML20116H454 + (03:27:46, 13 December 2024)
- ML20116H450 + (03:27:47, 13 December 2024)
- 05000387/LER-1984-011, :on 840301,two Initiations of Control Room Emergency Outside Air Supply Sys & Standby Gas Treatment Sys Occurred.Caused by Voltage Drop & Incorrect Removal of Test Jumper Cables + (03:27:48, 13 December 2024)
- ML20116H431 + (03:27:49, 13 December 2024)
- 05000339/LER-1985-005, :on 850323,reactor Manually Tripped Due to Shutdown & Control Banks Dropping Into Core Concurrent W/Partial Loss of Control Room Lighting.Caused by Power Loss Due to Switchyard Transformer 5 Fault + (03:27:51, 13 December 2024)
- ML20116H414 + (03:27:52, 13 December 2024)
- ML20116H382 + (03:27:53, 13 December 2024)
- ML20116H389 + (03:27:53, 13 December 2024)
- ML20116H377 + (03:27:54, 13 December 2024)
- 05000254/LER-1992-028-01, :on 921016,during Review of SBGT TS Rev, Discovered That on Loss of Instrument Air CR Dose Would Exceed GDC-19 Limit.Caused by Inadequate Design.Several Operating Procedures Temporarily Revised + (03:27:56, 13 December 2024)
- ML20116H360 + (03:27:57, 13 December 2024)
- ML20116H353 + (03:27:58, 13 December 2024)
- 05000254/LER-1992-027-01, :on 921009,insp of HPCI Room Cooler Determined That Room Cooler Fouled Beyond Design Margin Due to Accumulation of Sediment & Debris.Working Group Directed to Clean Room Cooler + (03:27:59, 13 December 2024)
- ML20116H336 + (03:28:01, 13 December 2024)
- ML20116H334 + (03:28:02, 13 December 2024)
- ML20116H320 + (03:28:04, 13 December 2024)
- ML20116H318 + (03:28:05, 13 December 2024)
- ML20116H306 + (03:28:07, 13 December 2024)
- ML20116H314 + (03:28:07, 13 December 2024)
- 3F1192-01, Forwards Markup of TS Administrative Controls Chapter Table of Contents,Noting Sections Util Proposes to Relocate,Per 870810 Exemption Request + (03:28:08, 13 December 2024)
- ML20116H292 + (03:28:09, 13 December 2024)
- ML20116H296 + (03:28:09, 13 December 2024)
- ML20116H263 + (03:28:10, 13 December 2024)
- ML20116H269 + (03:28:10, 13 December 2024)
- ML20116H262 + (03:28:11, 13 December 2024)
- ML20116H256 + (03:28:12, 13 December 2024)
- ML20116H258 + (03:28:12, 13 December 2024)
- ML20116H252 + (03:28:13, 13 December 2024)
- ML20116H250 + (03:28:14, 13 December 2024)
- ML20116H246 + (03:28:15, 13 December 2024)
- ML20116H248 + (03:28:15, 13 December 2024)
- ML20116H240 + (03:28:17, 13 December 2024)
- ML20116H238 + (03:28:18, 13 December 2024)
- ML20116H228 + (03:28:19, 13 December 2024)
- AECM-85-0131, Notifes of Intent to Eliminate Startup Testing Activities Previously Planned for Automatic Load Following Mode of Operation.Startup Test Involving Automatic Load Unnecessary, Based on GE Evaluation + (03:28:20, 13 December 2024)
- 05000364/LER-1985-008, :on 850328,reactor Trip Occurred Due to lo-lo Level in Steam Generator 2A.Caused by Personnel Error. Technician Counseled + (03:28:21, 13 December 2024)
- AECM-85-0126, Forwards Application Fee for NRC Review of Test Rept on flow-induced Vibration in HPCS Svc Pump Submitted on 850228 + (03:28:22, 13 December 2024)
- ML20116H215 + (03:28:24, 13 December 2024)
- 05000369/LER-1985-010-01, :on 850320,keyswitch for Door on Reactor Side of Containment Personnel Airlock in Bypass Position.Caused by Procedural Deficiency.Procedures Will Be Changed to Ensure Switches Returned to Active Position + (03:28:25, 13 December 2024)
- 05000237/LER-1985-015-02, :on 850325,three Main Steam Line Low Pressure Isolation Switches Tripped Below Tech Spec Min Trip Point. Caused by Instrument Setpoint Drift.Switches Recalibr to Meet Tech Spec Limit & Successfully Tested + (03:28:27, 13 December 2024)
- ML20116H203 + (03:28:28, 13 December 2024)
- 05000362/LER-1985-011-01, :on 850401,containment Purge Isolation Sys Train B Actuated.Caused by Failed Power Supply Bridge Diode. Diode Replaced + (03:28:33, 13 December 2024)
- ML20116H172 + (03:28:34, 13 December 2024)
- 05000352/LER-1985-033, :on 850321,discovered Required Hourly Fire Watch Not Performed within Allotted Times for RHR Room 102. Caused by Inadequate Communication Between Fire Watch Personnel.Training Session Conducted + (03:28:36, 13 December 2024)
- 05000373/LER-1985-028-01, :on 850327,reactor Scram Occurred While Unit in Hot Shutdown.Caused by Low Reactor Vessel Level Resulting from Opening of Safety Relief Valves During Leak Test.Rhr Sys Started + (03:28:38, 13 December 2024)
- ML20116H164 + (03:28:39, 13 December 2024)
- ML20116H156 + (03:28:40, 13 December 2024)
- 05000388/LER-1985-013, :on 850327,standby Liquid Control Pump a Failed 92-day Flow Verification Surveillance Test.Caused by Faulty Suction & Discharge Valves Internal to Positive Displacement Pump.Repairs Completed + (03:28:42, 13 December 2024)
- ML20116H147 + (03:28:43, 13 December 2024)
- ML20116H146 + (03:28:44, 13 December 2024)
- ML20116H145 + (03:28:45, 13 December 2024)