ML20116H145
| ML20116H145 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/29/1992 |
| From: | Shelton D CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20116H150 | List: |
| References | |
| 2098, NUDOCS 9211120319 | |
| Download: ML20116H145 (5) | |
Text
{{#Wiki_filter:.1 'Y .l 4 c; s* - -(.
- yenmuggn, t
Donald C. Shelton 300 Maison Avenue : .c Mce President Nuclear - Toledo, OH 43652FJ01-Davis Besse (419)249 2300 Docket Number 50-346 License Number NPF-3' Serial Number 2098 October 29, 1992 e United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ec t : Revision 17 to the Davis-Besse Unit 1 Updated Safety Analysis-Report (USAR) Gentlemen: The Toledo Edison Company is submitting, pursuant to 10-CFR 50.71, one (1) original plus ten (10) copies of Revision 17 to the USAR for-the-Davis-Besse Nuclear Pover Station, (DBNPS) Unit-1. Revision 17 to the USAR is an interim submittal, the purpose of which i is limited to the updating of-the DBNPS Fire' Hazards Analysis Report (FHAR) which is incorporated by reference _into USAR Section 9.5.1,' Fire-Protection Systems. As committed in Revision.16 to the.USAR,-Serial' 2069,-this update of the-fire protection program (USAR 9.5.1 and FHAR)- would be provided-by November 1, 1992. This interim update. transmits Revision'13 of-the FHAR to.the NRC. The update reflects facility changes implemented-between November 1, 1991-and May 1, 1992,- to USAR Section 9.5.1 and the FHAR. LA summary of the-i . major changes made-to the FHAR can be found in Attachment 1. Information contained in Revision 17 to the_USAR is-accurate to Hay 1, 1992. Please insert the revision material, dated November 1992, into the USAR and the FHAR per the-rttached instructions (Attachment!2). Very truly yours, / & k,]%{&r JHH d / attachments cc: A. B. Davis, Regional Administrator, NRC Region'III J. B. Hopkins, NRC Senior-Project Manager S. Stasek, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board-9211120339 923gg, ob -{DR-ADOCK 05000346 \\\\. . Operahng Companiest. ppg \\ Cleveland Electnc muminonng. Toledo Edison. . c
Docket Number 50-346 License Number NPF-3 Serial Number 2098 Page 1
SUMMARY
OF filar REVISION 13 MAJOR CilA?!GES Section 1 Added definitions as part of the relocation of the Fire Protection requirements in the Technical Specifications to the Safety Analysis Report. Section 2 Added references. Section 3 Deleted discussion of communications since this is nov discussed in Section 6. Section 4 Added a description and documented the fire hazard analysis of the Vet Vash Facility which was constru,ed prior to the seventh refueling outage. Updated fire areas to accurately reflect rooms with suppression and detection. Revised text to reflect the completion of Appendix R { modifications. Revised Section 4 to correct inconsistencies that existed between the filar and the Safe Shutdown Procedure. As a result of an Audit Finding, Section 4 was clarified for certain non-rated openings. Added a paragraph explaining the de-rating of FD-1101 and its associated penetration. Revised Tabtes to show modification v' ich provided for electrical isolation in certain Service Vater and Component Cooling Vater circuits in Fire Area R. Revised Section i to reflect the modification which installed source range flux monitoring in Room 402. Revised Tables to indicate cable routing changes that occurred as a result of the control room console panel changes in the Control Room. Revised the combustible loadings to reflect a more recent calculation. Section 6 Added a discussion of the communication systems and a summary of the radio system study. Section 8 Added Section 8, Operating Specifications. This was done in accordance with Generic Letter 86-10 with the relocation of the Fire Protection requirements in the Technical Specifications to the Safety Analysis Report.
Docket Number 50-346 License Number NPF-3 Serial Number 2098 Enclosure Page 1 SUBMITTAL OF REVISION 17 TO j Tile DAVIS-BESSE UPDATED SAFETY ANALYSIS REPORT (USAR) FOR DAVIS-BESSL NUCLEAR POWER STATION UNIT NO. 1 Enclosed are the original and 10 copies of Revision 17 to the Davis-Besse Nuclear Power Station, Unit No. 1, Updated Safety Analysis
- Report, i
Fort D. C. Shelton, Vice-President - Nuclear f f By: / l) "~ T. J. Mye s, Directo - Technical 9ervices Sworn and subscribed before me this 29th day of October, 1992 1 11/ $tl f ~~ Notary Public','St e of Ohio EVEl.YN L DRESS NOTARYPUBUC.STATEOF0H10 - MyCmeAnEpiiss#y28,19H
- j i
i
l~ -Docket Number 50-346'. -License Number NPF-3 Serial Number 2098 F Page 2-Section 9 Added Section 9 Fire Protection Safety Analysis, to incorporate the description of-USAR Section 9.5.1. Change in fire detectors from Alison type-.to Pyrotronics sype in-fire zone FDZ-317.- Appendix B Revised cables and raceways to reflect the modifications discussed in Section 4 above. Appendix C Revised Table to reflect modification which abandoned the chlorine detection system. Revised Table to-reflect modification that added a circuit to YBU. Added and deleted cables from the Tables to reflect as-built condition. Appendix E Deleted the fire area delineation drawings since they i duplicated other controlled drawings. Various Numerous editorial and clarifications vere made to various Sections. i_ll._____._.i___
.._______.._____.____._._.,..m Docket Number 50-346 License loumber 11PF ' Serial Number 2098 Page 1 i INSTRUCTIONS FOR REPLACEME!4T PAGES Replace the following pages of the Davis-liesse Nuclear Power Station j Unit Number 1 USAR and filar vith the attached pages. The revised pages are identified by Revision number. The corresponding overleaf pages are also provided to maltaain document co.apleteness. USAR l Remove 1::se r t a a i b b bo bo bp-bp 9.5 1 - 9.5, 9.5-1a 9.5-la l i filar t Remove Insert Heraove filar Revision 12 in its entirety and insert Revision 13 .i T k ) 3 .G, i
- ~.,,
.. - ~, ll.-_+,...,,,,,-,:---,;;n.---., i,_.,.;-.---.,nn,.,,, .-..,,....,....-,,;,}}