Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116N926 + (03:07:13, 13 December 2024)
- ML20116N925 + (03:07:14, 13 December 2024)
- ML20116N924 + (03:07:15, 13 December 2024)
- ML20116N920 + (03:07:16, 13 December 2024)
- ML20116N918 + (03:07:16, 13 December 2024)
- ML20116N917 + (03:07:17, 13 December 2024)
- B11494, Forwards Addl Info Re SER Open Item 14.10, Cable Spreading Room Protection on Capability for Manual Fire Fighting,To Support Request for Deviation from Provisions of Branch Technical Position Cmeb 9.5-1,Section C.7.C + (03:07:18, 13 December 2024)
- ML20116N909 + (03:07:18, 13 December 2024)
- ML20116N906 + (03:07:19, 13 December 2024)
- ML20116N897 + (03:07:29, 13 December 2024)
- ML20116N889 + (03:07:29, 13 December 2024)
- ML20116N877 + (03:07:30, 13 December 2024)
- ML20116N875 + (03:07:31, 13 December 2024)
- ML20116N872 + (03:07:32, 13 December 2024)
- ML20116N858 + (03:07:33, 13 December 2024)
- ML20116N864 + (03:07:33, 13 December 2024)
- ML20116N853 + (03:07:41, 13 December 2024)
- 05000397/LER-1985-027, :on 850412,automatic Isolation of Div 1 balance-of-plant Relay Cabinet Occurred.Caused by Inadequate Procedure.Logic Reset.Surveillance Procedures Revised.W/ + (03:07:43, 13 December 2024)
- ML20116N841 + (03:07:44, 13 December 2024)
- ML20116N837 + (03:07:47, 13 December 2024)
- ML20116N833 + (03:07:48, 13 December 2024)
- ML20116N836 + (03:07:48, 13 December 2024)
- RBG-37762, Forwards Corrected Monthly Operating Rept for Sept 1992 for River Bend Station Unit 1 + (03:07:49, 13 December 2024)
- ML20116N820 + (03:07:50, 13 December 2024)
- ML20116N827 + (03:07:50, 13 December 2024)
- ML20116N814 + (03:07:51, 13 December 2024)
- ML20116N811 + (03:07:52, 13 December 2024)
- ML20116N807 + (03:07:53, 13 December 2024)
- ML20116N804 + (03:07:53, 13 December 2024)
- ML20116N798 + (03:07:54, 13 December 2024)
- ML20116N789 + (03:07:55, 13 December 2024)
- ML20116N787 + (03:07:55, 13 December 2024)
- ML20116N779 + (03:07:56, 13 December 2024)
- ML20116N777 + (03:07:56, 13 December 2024)
- ML20116N772 + (03:07:57, 13 December 2024)
- 05000361/LER-1985-023, :on 850331,containment Purge Isolation Sys Train a Spuriously Actuated.Caused by Electrical Noise Spike on Containment Area Radiation Monitor.Detailed Study of Plant Ground Sys Being Performed + (03:07:59, 13 December 2024)
- ML20116N753 + (03:08:00, 13 December 2024)
- ML20116N751 + (03:08:01, 13 December 2024)
- ML20116N747 + (03:08:02, 13 December 2024)
- 05000271/LER-1985-005, :on 850402,high Radiation Trip in One Logic Channel Occurred.Caused by Personnel Error.Personnel Involved Reinstructed in Equipment Configuration & Procedure Content + (03:08:04, 13 December 2024)
- ML20116N732 + (03:08:05, 13 December 2024)
- ML20116N728 + (03:08:06, 13 December 2024)
- ML20116N726 + (03:08:07, 13 December 2024)
- 05000397/LER-1985-025, :on 850404,operations Failed to Notify Chemistry Lab When Transferring Drywell Purge Operation from Standby Gas Treatment Sys to Reactor Bldg Ventilation Sys.Caused by Personnel Error + (03:08:09, 13 December 2024)
- ML20116N719 + (03:08:10, 13 December 2024)
- ML20116N712 + (03:08:10, 13 December 2024)
- ML20116N710 + (03:08:11, 13 December 2024)
- TXX-4469, Forwards Response to Omissions in SER Section Iii.B Re SPDS, Per NRC 841205 Request.Verification & Validation Program for Unit 1 Complete.Response Provides Input for Resolution of Sser 6 Outstanding Issue 35 + (03:08:12, 13 December 2024)
- ML20116N703 + (03:08:13, 13 December 2024)
- 05000413/LER-1985-023, :on 850329,reactor Power Exceeded 75% W/Only Two of Three Test Runs for Reactor Coolant Sys Performed. Caused by Software Problem.Thermal Output Calculations Program Modified,Reassembled & Reimplemented + (03:08:15, 13 December 2024)
- B11520, Requests Approval to Invoke Codes Cases N-401 & N-402 as Part of Steam Generator Eddy Current Tube Insp.Justification Provided.Prompt Attention Requested Since Exams Scheduled to Be Performed in May 1985 + (03:08:16, 13 December 2024)