Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-96-0340, Provides Response to Request for Addl Info,Revising TS to Allow Update of Units to 105% of Rated Thermal Power + (02:26:53, 13 December 2024)
- ML20117P058 + (02:26:53, 13 December 2024)
- ST-HL-AE-1250, Submits Copy of Slides & Handouts Used by Bechtel During NRC Structural Analysis Audit on 850107 in Houston,Tx.Responses to Listed Open Action Items Encl + (02:26:54, 13 December 2024)
- TXX-9645, Responds to NRC Re Violations Noted in Insp Repts 50-445/96-08 & 50-446/96-08.Corrective Actions:Plant Operations Staff Reestablished Lcoar & Required Compensatory Measures + (02:26:55, 13 December 2024)
- ML20117N992 + (02:26:56, 13 December 2024)
- ML20117P001 + (02:26:56, 13 December 2024)
- ML20117N982 + (02:26:57, 13 December 2024)
- ML20117N991 + (02:26:57, 13 December 2024)
- ML20117N969 + (02:26:59, 13 December 2024)
- ML20117N964 + (02:27:01, 13 December 2024)
- ML20117N950 + (02:27:05, 13 December 2024)
- ML20117N941 + (02:27:06, 13 December 2024)
- ML20117N935 + (02:27:07, 13 December 2024)
- U-600001, Confirms GE Review of Emergency Operating Procedures,Per NUREG-0737,TMI Item I.C.7.Resolution of GE Comments Expected by Jul 1985.Implementation Processes Reviewed & Approved by NRC Per SER (NUREG-0853,Section 13.6.3) + (02:27:08, 13 December 2024)
- ML20117N915 + (02:27:08, 13 December 2024)
- ML20117N882 + (02:27:09, 13 December 2024)
- ML20117N881 + (02:27:10, 13 December 2024)
- ML20117N877 + (02:27:10, 13 December 2024)
- ML20117N869 + (02:27:11, 13 December 2024)
- ML20117N867 + (02:27:12, 13 December 2024)
- ML20117N866 + (02:27:13, 13 December 2024)
- ML20117N861 + (02:27:13, 13 December 2024)
- ML20117N857 + (02:27:14, 13 December 2024)
- ML20117N853 + (02:27:15, 13 December 2024)
- ML20117N854 + (02:27:15, 13 December 2024)
- ML20117N852 + (02:27:16, 13 December 2024)
- ML20117N847 + (02:27:17, 13 December 2024)
- ML20117N848 + (02:27:17, 13 December 2024)
- ML20117N840 + (02:27:18, 13 December 2024)
- ML20117N844 + (02:27:18, 13 December 2024)
- ML20117N837 + (02:27:19, 13 December 2024)
- ML20117N834 + (02:27:20, 13 December 2024)
- ML20117N833 + (02:27:21, 13 December 2024)
- ML20117N830 + (02:27:26, 13 December 2024)
- ML20117N827 + (02:27:26, 13 December 2024)
- ML20117N816 + (02:27:30, 13 December 2024)
- 05000266/LER-1996-004, :on 960731,operation of Svc Water Sys Was Outside Design Basis.Caused by Deficient Original SW Sys Analysis.Operating Restrictions Were Established to Ensure Adequate SW Pump Availability + (02:27:32, 13 December 2024)
- 3F0585-07, Monthly Operating Rept for Apr 1985 + (02:27:33, 13 December 2024)
- ML20117N806 + (02:27:33, 13 December 2024)
- ML20117N750 + (02:27:34, 13 December 2024)
- ML20117N735 + (02:27:35, 13 December 2024)
- ML20117N731 + (02:27:35, 13 December 2024)
- ML20117N711 + (02:27:36, 13 December 2024)
- ML20117N705 + (02:27:37, 13 December 2024)
- NSD-NRC-96-4748, Forwards Draft Copy of Chapter 57 of AP600 PRA Covering at- Power Internal Fire Analysis.Draft of AP600 PRA Submitted for NRC to Begin Review of Revised Internal Fire Analysis & Provide Feedback During 960624-26 Meeting W/Nrc + (02:27:38, 13 December 2024)
- ML20117N696 + (02:27:39, 13 December 2024)
- ML20117N692 + (02:27:39, 13 December 2024)
- ML20117N690 + (02:27:40, 13 December 2024)
- ML20117N684 + (02:27:40, 13 December 2024)
- L-85-142, Responds to NRC Re Violations Noted in Insp Repts 50-250/85-05 & 50-251/85-05.Corrective Actions:Program for Improved Operation Implemented,Including Ensurance That Adequate Testing & Acceptance Criteria Available + (02:27:41, 13 December 2024)
- 2CAN069602, Forwards Revised Spec 3/4.4.12,including New 24 H Action Statement for Single Inoperable LTOP Relief Valve in Modes 5 & 6,per Discussion W/Nrc Re 960411 Proposed TS Change on LTOP as Requested by GL 90-06 + (02:27:42, 13 December 2024)
- RBG-42988, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/96-01.C/A:sys Engineer Discussed Issue W/Ge Technician to Determine Which Steps Actually Performed & Review of PM Work Instruction Writers Guide Performed + (02:27:42, 13 December 2024)