Proposed TS 3/4.4.12,including New 24 H Action Statement for Single Inoperable LTOP Relief Valve in Modes 5 & 6,per GL 90-06
ML20117N684
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/18/1996
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20117N681 List:
References
GL-90-06, GL-90-6, NUDOCS 9606240070
Download: ML20117N684 (3)


Text

!

I i

j

.l l

ATTACHMENT ID 2CAN069602 PROPOSED TECHNICAL SPECIFICATION l

IN THE MATTER OF AMENDING LICENSE NO. NPF-6 i

ENTERGY OPERATIONS, INC.

ARKANSAS NUCLEAR ONE, UNIT TWO DOCKET NO. 50-368 9606240070 960618 PDR ADOCK 05000368 p

PDR

REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION LIMITING CONDITION FOR OPERATION 3.4.12 Low temperature overpressure protection (LTOP) shall be OPERABLE with each SIT isolated *, ands a.

Two LTOP relief valves with a lift setting of $430 psig, or b.

The Reactor Coolant System depressurized with an RCS vent path 26.38 square inches, SIT isolation is only required when SIT pressure is greater than or equal to RCS pressure.

i APPLICABILITY: MODE 4 with TC 522 0'F, MODE 5, MODE 6 with reactor vessel head in place.

ACTION:

I a.

With one LTOP relief valve inoperable in MODE 4, restore the inoperable valve to OPERABLE status within 7 days or depressurize and vent the RCS through a 26.38 square inch vent path within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

b.

With one LTOP relief valve inoperable in MODE 5 or 6, either (1) restore the inoperable relief valve to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or (2) complete depressurization and venting of the RCS through a 26.38 square inch vent path within a total of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />.

c.

With both LTOP relief valves inoperable, depressurize and vent the RCS through a 26.38 square inch vent path within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

d.

With a SIT not isolated, isolate the affected SIT within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

If required action is not met, either:

(1) Depressurize the SIT to less than the RCS pressure within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or (2) Increase cold leg temperature to greater than or equal to 220"F within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

e.

The provisions of Specification 3.0.4 are not applicable.

ARKANSAS - UNIT 2 3/4-28 Amendment No.

s SURVEILLANCE REQUIREMENTS 4.4.12.1 Verify both sets of LTOP relief valve isolation valves are open at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when the LTOP relief valves are being used for overpressure protection.

4.4.12.2 The RCS vent path shall be verified to be open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ** when the vent path is being used for overpressure protection.

4.4.12.3 Verify that each SIT is isolated, when required, once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.12.4 No additional LTOP relief valve Surveillance Requirements other than those required by Specification 4.0.5.

    • Except when the vent path is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify this valve is open at least once per 31 days.

6 1

l l

ARKANSAS - UNIT 2 3/4-29 Amendment No.