Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126E753 + (00:15:35, 13 December 2024)
- ML20126E752 + (00:15:36, 13 December 2024)
- ML20126E751 + (00:15:38, 13 December 2024)
- ML20126E750 + (00:15:39, 13 December 2024)
- ML20126E747 + (00:15:43, 13 December 2024)
- ML20126E746 + (00:15:45, 13 December 2024)
- ML20126E744 + (00:15:48, 13 December 2024)
- W3P85-2115, Forwards Depressurization Capability W/Degraded Auxiliary Pressurizer Spray, Satisfying License Condition 12.Analysis Demonstrates That Sys Can Perform Necessary Depressurization W/Isolation Valve Failing to Open + (00:15:53, 13 December 2024)
- ML20126E742 + (00:15:55, 13 December 2024)
- 05000309/LER-1985-004, :on 850505,high Startup Rate of Change of Power Reactor Trip Occurred.Caused by Electronic Noise on wide-range Nuclear Instrumentation Channels.Repairs to Suppress Noise Will Be Performed + (00:16:01, 13 December 2024)
- ML20126E739 + (00:16:04, 13 December 2024)
- ML20126E736 + (00:16:06, 13 December 2024)
- ML20126E735 + (00:16:09, 13 December 2024)
- ML20126E734 + (00:16:10, 13 December 2024)
- ML20126E732 + (00:16:13, 13 December 2024)
- ML20126E731 + (00:16:14, 13 December 2024)
- ML20126E730 + (00:16:18, 13 December 2024)
- ML20126E729 + (00:16:20, 13 December 2024)
- ML20126E726 + (00:16:21, 13 December 2024)
- RBG-37939, Application for Amend to License NPF-47,revising TS SR for TS 4.5.1, ECCS - Operating to Correct Minor Nonconservative Calculational Errors Discovered During Self Initiated Safety Sys Functional Insp + (00:16:22, 13 December 2024)
- ML20126E724 + (00:16:24, 13 December 2024)
- IR 05000010/1980018 + (00:16:25, 13 December 2024)
- ML20126E722 + (00:16:27, 13 December 2024)
- ML20126E721 + (00:16:29, 13 December 2024)
- ML20126E720 + (00:16:31, 13 December 2024)
- ML20126E717 + (00:16:33, 13 December 2024)
- ML20126E716 + (00:16:35, 13 December 2024)
- ML20126E715 + (00:16:36, 13 December 2024)
- ML20126E714 + (00:16:38, 13 December 2024)
- ML20126E712 + (00:16:42, 13 December 2024)
- ML20126E711 + (00:16:43, 13 December 2024)
- ST-HL-AE-4283, Responds to NRC Re Violations Noted in Insp Repts 50-498/92-29 & 50-499/92-29.Corrective Actions:Engineering Will Evaluate Design Change of Sdg Circuitry to Automatically Release Sdg from Emergency Mode + (00:16:45, 13 December 2024)
- ML20126E708 + (00:16:48, 13 December 2024)
- ML20126E705 + (00:16:52, 13 December 2024)
- ML20126E704 + (00:16:54, 13 December 2024)
- ML20126E703 + (00:16:56, 13 December 2024)
- ML20126E702 + (00:16:57, 13 December 2024)
- ML20126E701 + (00:16:59, 13 December 2024)
- ML20126E700 + (00:17:01, 13 December 2024)
- ML20126E699 + (00:17:03, 13 December 2024)
- ML20126E697 + (00:17:04, 13 December 2024)
- ML20126E696 + (00:17:07, 13 December 2024)
- ML20126E693 + (00:17:08, 13 December 2024)
- ML20126E692 + (00:17:09, 13 December 2024)
- ML20126E691 + (00:17:10, 13 December 2024)
- ML20126E690 + (00:17:12, 13 December 2024)
- 05000254/LER-1985-002-07, :on 850509,while Performing Traversing in-core Probe Sys Power Operated Valve Testing,Number 4 TIP Ball Valve Failed to Close.Caused by Loss of Lubrication.Valve Lubricated & Returned to Svc + (00:17:15, 13 December 2024)
- ML20126E687 + (00:17:18, 13 December 2024)
- 3F1292-10, Corrects Reactor Coolant Temp Instrumentation Range on TS 3.3-9,contained in Rev 1,Suppl 2 to TS Change Request 165 Re Fire Svc Sys,Transmitted Via ,Per NRC Request + (00:17:19, 13 December 2024)
- ML20126E685 + (00:17:21, 13 December 2024)
- ML20126E683 + (00:17:22, 13 December 2024)