ML20126E704

From kanterella
Jump to navigation Jump to search
Deficiency Rept DER 85-03 Re 3-inch Seismic Gap Criteria. Final Rept Expected by 850614
ML20126E704
Person / Time
Site: Palo Verde  
Issue date: 05/15/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32649-TDS, DER-85-03, DER-85-3, NUDOCS 8506170186
Download: ML20126E704 (2)


Text

l

, n, Arizona Nuclear Power Project "

u P.O. BOX 52034

May 15, 1985 ANPP-32649-TDS/PJC U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension for Report - DER 85-03 A 50.55(e) Potentially Reportable Deficiency Relating To The Three Inch Seismic Gap Criteria File:

85-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on February 8, 1985 (B) ANPP-32093, dated March 7, 1985 (Interim Report)

(C) ANPP-32380, dated April 12, 1985 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Refer-ence (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested in Reference (C). At that time it was estimated that a Final Report would be available by May 15, 1985.

As stated in the meeting held with the NRC on March 21, 1985, this condition has been evaluated as having no safety significance.

Presently, the ANPP is finalizing the information to be included in the Final Report which it expects to submit for the NRC's information by June 14, 1985.

Very truly yours, EEU LA/g E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PJC/nj cc:

See Page Two I

8506170186 850515 1 0 PDR ADOCK 05000528 I

9 PDR b,

e Mr. D. F. Kirsch ANPP-32649-TDS/PJC DER 85-03 Page Two cc:

Richard DeYoung, Director Office of Inspection adn Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339