Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127M439 + (20:44:04, 12 December 2024)
- ML20127M436 + (20:44:05, 12 December 2024)
- ML20127M435 + (20:44:06, 12 December 2024)
- ML20127M434 + (20:44:07, 12 December 2024)
- ML20127M433 + (20:44:07, 12 December 2024)
- 05000348/LER-1992-006-01, :on 921028,inadvertent Actuation of ESF Occurred When Electrician Allowed Jumper to Make Contact W/ Adjacent Terminal Inside Sequencer.Event Discussed W/ Personnel & Electrician Coached + (20:44:10, 12 December 2024)
- ML20127M430 + (20:44:12, 12 December 2024)
- ML20127M431 + (20:44:12, 12 December 2024)
- 05000331/LER-1992-017, :on 921026,discovered That Two Hourly Fire Watches in RHR Valve Room Missed During QA Surveillance. Caused by Contract Security Personnel Error.Personnel Instructed Re Use of Fire Watch Checklist + (20:44:15, 12 December 2024)
- ML20127M428 + (20:44:16, 12 December 2024)
- ML20127M425 + (20:44:17, 12 December 2024)
- ML20127M427 + (20:44:17, 12 December 2024)
- ML20127M423 + (20:44:18, 12 December 2024)
- B11512, Application for Amend to License DPR-21,revising Tech Specs 3.7.A.2.a & 3.7.A.6 Re drywell-to-suppression Chamber Differential Pressure & Drywell Oxygen Concentration, Respectively,To Allow for Up to 48 H Nonmaint.Fee Paid + (20:44:19, 12 December 2024)
- ML20127M420 + (20:44:20, 12 December 2024)
- ML20127M419 + (20:44:20, 12 December 2024)
- ML20127M417 + (20:44:21, 12 December 2024)
- ML20127M416 + (20:44:22, 12 December 2024)
- ML20127M415 + (20:44:23, 12 December 2024)
- ML20127M414 + (20:44:24, 12 December 2024)
- IR 05000352/1985025 + (20:44:29, 12 December 2024)
- ML20127M411 + (20:44:29, 12 December 2024)
- ML20127M409 + (20:44:30, 12 December 2024)
- IR 05000341/1985024 + (20:44:32, 12 December 2024)
- 05000454/LER-1985-058, :on 850519,one Hourly Fire Watch Patrol Not Conducted.Caused by Personnel Assignment Error.Disciplinary Actions Taken.Addl Security Sergeant Assigned to Supervise & Ensure Proper Fire Watch Performance + (20:44:37, 12 December 2024)
- ML20127M405 + (20:44:38, 12 December 2024)
- LD-93-005, Forwards Responses to 54 Issues Identified in Draft SER for Sys 80+ + (20:44:39, 12 December 2024)
- ML20127M402 + (20:44:39, 12 December 2024)
- B11382, Application for Amend to License DPR-61,revising Tech Specs Re Refueling Cavity Water Level Per Safety Analysis of Cavity Water Level & Seal Redesign.Fee Paid + (20:44:40, 12 December 2024)
- ML20127M398 + (20:44:41, 12 December 2024)
- ML20127M397 + (20:44:42, 12 December 2024)
- ML20127M396 + (20:44:42, 12 December 2024)
- ML20127M395 + (20:44:43, 12 December 2024)
- ML20127M392 + (20:44:45, 12 December 2024)
- ML20127M391 + (20:44:45, 12 December 2024)
- ML20127M390 + (20:44:46, 12 December 2024)
- PNO-I-85-037, on 850516,reactor Shut Down After One of Two Diesel Generators & One of Four LPCI Pumps Found Inoperable. Cause Not Stated.Diesel Generator B Returned to Svc & LPCI Pipe Supports Repaired + (20:44:47, 12 December 2024)
- ML20127M383 + (20:44:48, 12 December 2024)
- ML20127M385 + (20:44:48, 12 December 2024)
- ML20127M382 + (20:44:49, 12 December 2024)
- ML20127M380 + (20:44:50, 12 December 2024)
- ML20127M381 + (20:44:50, 12 December 2024)
- ML20127M379 + (20:44:51, 12 December 2024)
- ML20127M377 + (20:44:52, 12 December 2024)
- ML20127M376 + (20:44:52, 12 December 2024)
- ML20127M375 + (20:44:53, 12 December 2024)
- ML20127M373 + (20:44:54, 12 December 2024)
- ML20127M372 + (20:44:55, 12 December 2024)
- ML20127M371 + (20:44:55, 12 December 2024)
- 05000374/LER-1992-014-05, :on 921012 & 28,determined That LLRT on RWCU Return Containment Isolation Valve Improperly Performed. Caused by Upstream Side of Valve Improperly Vented.Proper Flow Path Established & LLRT Reviewed + (20:44:57, 12 December 2024)
- ML20127M367 + (20:45:10, 12 December 2024)
- ML20127M366 + (20:45:10, 12 December 2024)