ML20127M415
| ML20127M415 | |
| Person / Time | |
|---|---|
| Site: | Texas A&M University, 05000128 |
| Issue date: | 05/09/1985 |
| From: | Donna Anderson TEXAS A&M UNIV., COLLEGE STATION, TX |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8505230263 | |
| Download: ML20127M415 (1) | |
Text
- m:
O O
4-016962S : 29 09/09/es I CS leauNoz CSP FTWA 409u457551 14Ga,S TDBN COLLEGE STATION TX 165 05-09 115dA EST I O e
C> uR EH I C JOHNSON, OFFICE OF INSPECTION AND O
ENFOR CE A ENT (S N LCLEAR REGLLATORY COMMlbSION REGION 4 611 O
0 RYAN PLAZA UR SIITE 1000 ARLINGTON TX 76012 O
e O
O RF REPORTABLE OCCURRENCE 6 MAi 1965 O
g ON 8 MA) 1985 AT 1425 THE NSCR WAS MONENTARILY OPERATED WITH THE FACILITY AlH AUNITOH1NG SYSTEM INOPERATI\\E (APPROX 1EATELY IS MINLTES)
O O
otRiso RESuRT OF THE REACTOR FOLL0slau A F ACILITY P0aER FAltuRe.
UURING LOSS OF FACILITi POMEH THE HELP PHYSICIbT ON DUTY HAU TURNED OFF 'IHE HIGH \\0LTAGE TO THE DETECTORS TO THE FACILITY AIR MONITORS O
O THE F AR SISTEN WAS REST 0HEU TO NOHuAL OPERATION A T 1440. PROCEDURES dERE FOLL0nEU FOR HECOVERY Or: iHE FACILITY ANU OF THE REACTOR, H0klE\\ER, 'lHE PHOCEDLRES Ulu NOT RE01: IRE OPERATION AL VERIt lCATION OF O
THE F AM SiSTEb;. THE FACILITY AREA RADI ATION MONITORS dERE IN O
OPEhATION ANU WOULD HATE INDICATEU ANY A3 NORMALITIES 114 RAul ATION LE\\ELS RELATED TO OPERATION OF THE REACTOR. TO PRE \\ENT REOCC LRRENCE O
OPERATING PROCEUURES WILL BE UP-GRADED TO INCLUDE \\ERI'FICATION OF AN O
OPERAliON AL FAM SYSTEt/ FOLLodlNG LOSS OF ELECfRICAL POWER'.
lO DONeLD oENE ANoERSON, unaAoER OF REACTOR OPERATIONS NUCLE Ah SCIENCE CENTER TEXAS A & F [NI\\ERSITY l
O-- FE BO X 89 O
COLLEGE STATION TX ~/ 7843 O
e 1201 EST lO e
yoxCoyp yon m
O
@@@0 e
aay s.
O g
4/
e
,O b>o
'e
( 9 30
\\
- o esoeaso26a esoso, e
PDR ADOCK Os0000s9 if, S
PDR O
to neety av u^iton^u uessics. see nevense sioe ron wesreau uniou s rott. rnes esone uuusens e
.