OPERATING DATA REPORT
. DOCKET NO 50-255-DATE: 08 '
4 COMPLETED BY
- PASmith; en,
TELEPHONE ~(616)764-8913 OPERATING STATUS
= 'O
' Palisades NOTES-c1h Unit:Name:
?
2.~
' Reporting Period:
850401-850430
.3.
fLicensed' Thermal Power-(MWt):
2530 14.
Nameplate Rating'(Gross'MWe)-
811.7
- 15 V2 iDesign Electrical Rating (Net-MWe):
805
. _6.
> Maximum Dependable Capacity (Gross MWe): *675 J7.-
Maximum Dependable. Capacity (Net MWe):
- 635 iJ 8.
- .If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report,
' ^ Egive reasons:
- 19. _ 5 Power Level to Which Restricted,' if any (Net MWe):
10.
Reasons for Restrictions, if any:
This Month ~
Yr-to-Date Cumulative-
.11.: ' Hours In Reporting Period 719 2,879
'117,158
- 12. ; Number-ofLHours' Reactor Was Critical 719 2,879 63,688.7 13.
Reactor Reserve Shutdown Hours k
14L ' Hours Generator On Line 709.6 2,853.7 60,468.0' 150 ' Unit Reserve Shutdown Hours.
16;n. Gross: Thermal Energy-Generated (MWH)-
1,622,592 6,831,168 124,914,120; 0 17.-
Gross Electrical Energy Generated (MWH)-
518,380 2,196,130-38,813,920
- 18. -Net Electrical Energy Generated (MWH) 119J EUnit Service Factor
-490,404 2,083,289
- 36,522,852-98.7 99.1
- 51.6 -
120.~ : Unit Availability Factor 98.7 99.1 51.6
, 21.. Unit Capacity FactorL(Using MDC Net)
-107.4
'113.9 49.1 22.
Unit Capacity Factor-(Using DER Net)-
84.7 89.9 38.7' 23; Unit Forced Outage. Rate 1.3 0.9 32.4 T24. Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
m-
.t.
25'. iIf-Shut >Down at End of. Report. Period, Estimated Date of Start Up:
- -.26. iUnits'in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~*1 Based on condenser backpressure H
r-
-OC0185-0001B-OP0$'
IC fT8EMffys Qt
..aw
_m. - - -. _ _ _ __. _, _ _. _ _ _ _ _ _
m
.a m..
.u..m
.-ami-
--m
.m. -
.m-
y-
.x 1 AVERAGE: DAILY UNIT POWER LEVEL.
DOCKET Nd-50'-255 UNIT Palisades.
DATE 05-08-85 COMPLETED BY PASmith TELEPHONE (616)764-8913 k
.:NONTH.
' April 1985 fDAY. AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY POWER LEVEL
'(MWe-Net)
(MWe-Net)-
1
-762
-- 17 758 L2-763 18 745 3
762 19 743 4'
^
759 20 747 5
765 21 748-6' 763' 22 747
,7 762 23 745 8
-764 24 753 9
767 25 762 10 760 26 759
- '11-302-27 764 o
' 12 -
182 28 763 13 --
233 29 760 14 194 30 758-15 614'
- 16-760 LINSTRUCTIONS:
-On this format, list the average daily unit power level in MWe-Net for each day in'the reporting month. Compute to the nearest whole megawatt.
OC0185-0001C-OP03 W
f s
s. -.,
DOCKET NO.'
50-255' LINIT SHUIDOWNS AND POWER REDUCTIONS-UNIT NAIE!
PalisadesE DATE-05-08 Colf'LETED BY PASmith REPORT N)MTH April 1985' TELEPHONE (616)-764-8913' 1
2 No.
Date Type Duration Reason Nethod of
. Licensee Systy C y nt Cause & Corrective (Hours)
Shuting-
-Event Code Code Action to 3
Down Reactor
-Report #
Prevent Recurrence
. EH leak at #4 governor:
3 850414 F
9.4 A
valve 1.
2.
3.
4 5.
F: Forced Reason:
Method:
Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipe nt Failure (Explain) 1-&nual for Preparation of Dsta B-Maintenance or Test 2-knual Scram
-Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative-G-Operational Error (Explain)
(9/77)
H-Other (Explain)
OC0185-0001D-OP03
p-w7 s
_. w;
~~
c -
, y
,g..
?
~
L t ai
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1985 N
LThefPlant operated at' approximately 98 percent power until April 10 at 2300 H
? hours;when power reduction commenced to add oil to' primary coolant pump P-50D.
and to perform miscellaneous maintenance' activities.
I-
'During power: escalation on April 14, an EH leak on the supply.line' to number ifour governor valve caused the unit to be'taken off line at 0647-hours. The Jreactor remained at hot standby, and the' unit was back on line the same day at
?l613 hours.
- 98 percent power. was reached by 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on April 15 and essentially remained at this power-level through'the end of the reporting period.
k a
e L
),
i OC0185-0001E-OP03 k1
r -
?
e-Consumem Power Company:
Palisades Nuclear Plant: 27780 Blue Star Memorial Hghway, Covert. MI 49043 May 8, 1985 US Nuclear Regulatory Commission Mail and Records.Section Washington,-DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of April 1985.
b
>~ o Dewey VanDenBerg Reactor Engineer CC: KMHass, Palisades GHGoralski, Palisades.
JGKeppler, USNRC JRSchepers, Palisades DJVandeWalle, P24-614B l
DWRogers, Palisades l
Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA RWraylor, CE, Palisades AAAlatalo, Palisades BLHarshe, P26-208 Document Control, 950*22*35*10/L GHG85*019
+Y/
3 \\
s!
m