Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128J126 + (18:41:04, 12 December 2024)
- ML20128J125 + (18:41:05, 12 December 2024)
- ML20128J122 + (18:41:06, 12 December 2024)
- ML20128J121 + (18:41:08, 12 December 2024)
- 05000265/LER-1993-002, :on 930113,nuclear Station Operator Tripped Turbine & Noticed Motor Speed Charger Light Indication Remained Lit at High Speed Stop.Caused by Dirty Contacts in Pressure Switch.Hpci Declared Inoperable + (18:41:10, 12 December 2024)
- BSEP-93-0023, Responds to NRC Re Violations Noted in Insp Rept 50-324/92-30 & 50-325/92-30.C/As:establishing Nuclear Safety Oversight Committee Reporting to Mgt to Assist Licensee in Developing & Maintaining Higher Level of Safety Awareness + (18:41:12, 12 December 2024)
- ML20128J114 + (18:41:12, 12 December 2024)
- W3P85-1421, Forwards Rev 3 to Pump & Valve Inservice Test Plan, Per 10CFR50.55a(g).Relief Requested from ASME Code Section XI Requirements When Compliance Impractical.List of Changes Encl,Per 850516 Telcon + (18:41:13, 12 December 2024)
- ML20128J112 + (18:41:14, 12 December 2024)
- ML20128J111 + (18:41:14, 12 December 2024)
- ML20128J110 + (18:41:15, 12 December 2024)
- ML20128J108 + (18:41:16, 12 December 2024)
- ML20128J104 + (18:41:17, 12 December 2024)
- ML20128J102 + (18:41:17, 12 December 2024)
- ML20128J096 + (18:41:19, 12 December 2024)
- ML20128J095 + (18:41:20, 12 December 2024)
- ML20128J094 + (18:41:21, 12 December 2024)
- IR 05000424/1985009 + (18:41:22, 12 December 2024)
- ML20128J088 + (18:41:23, 12 December 2024)
- ML20128J089 + (18:41:23, 12 December 2024)
- ML20128J087 + (18:41:24, 12 December 2024)
- ML20128J085 + (18:41:25, 12 December 2024)
- LIC-93-0072, Forwards Decommissioning Funding Plan Trust Agreement Annual Accounting for 1992 + (18:41:26, 12 December 2024)
- ML20128J084 + (18:41:26, 12 December 2024)
- ML20128J081 + (18:41:27, 12 December 2024)
- ML20128J077 + (18:41:28, 12 December 2024)
- ML20128J074 + (18:41:29, 12 December 2024)
- ML20128J071 + (18:41:29, 12 December 2024)
- 05000498/LER-1993-003, :on 930112,TS 3.0.3 Entered Due to Inoperable Steam Line Pressure Channels.Caused by Lack of Understanding by Procedure Writers Re Calibr Time Constants.Affected Time Constants Calibr + (18:41:32, 12 December 2024)
- IR 05000327/1985013 + (18:41:33, 12 December 2024)
- ML20128J063 + (18:41:34, 12 December 2024)
- ML20128J062 + (18:41:35, 12 December 2024)
- ML20128J060 + (18:41:36, 12 December 2024)
- 05000338/LER-1993-001-01, :on 930117,equalization Valve for Personnel Hatch Outer Door Escape Lock Was Discovered Open During Core Alterations.Caused by Personnel Error.Operations Re Core Alterations Suspended & Valve Closed + (18:41:38, 12 December 2024)
- 05000498/LER-1993-004, :on 930112,TS Violated When ASME Section XI Code Surveillance Test Exceeded Grace Period for Outside Containment Isolation Suppl Purge Valve.Desk Top Instruction for Surveillance Coordinator Changed + (18:41:41, 12 December 2024)
- ML20128J049 + (18:41:47, 12 December 2024)
- NSD-NRC-96-4834, Forwards Westinghouse Responses to NRC RAI on AP600 SSAR Section 9.51, Fire Protection + (18:41:48, 12 December 2024)
- ML20128J041 + (18:41:53, 12 December 2024)
- ML20128J040 + (18:41:57, 12 December 2024)
- ML20128J039 + (18:41:57, 12 December 2024)
- ML20128J035 + (18:41:58, 12 December 2024)
- ML20128J034 + (18:41:59, 12 December 2024)
- ML20128J033 + (18:42:23, 12 December 2024)
- B14366, Responds to NRC Re Violations Noted in Insp Rept 50-213/92-81.Corrective Actions:Licensee Issued MOV Program Manual on 921218 That Provides Specific Guidance Re Testing of MOVs & Will Be Implemented Through Individual Projects + (18:42:24, 12 December 2024)
- ML20128J028 + (18:42:28, 12 December 2024)
- ML20128J023 + (18:42:29, 12 December 2024)
- 0CAN029309, Advises of Completion of ERDS Implementation at Facilities & Provides Final Data Point Library Changes,Per NRC 920413 Acceptance of ERDS Implementation Plan.Procedural Controls in Place to Perform Testing of ERDS Quarterly + (18:42:30, 12 December 2024)
- ML20128J021 + (18:42:30, 12 December 2024)
- ML20128J018 + (18:42:31, 12 December 2024)
- ML20128J016 + (18:42:32, 12 December 2024)
- ML20128J015 + (18:42:33, 12 December 2024)
- ML20128J013 + (18:42:36, 12 December 2024)