MaineYankee.
y BLE EL FCT AiCITY FOA mAAINE SINCE 1972 R
EDtSON DRrVE. AUGUSTA. MAINE 04330 *(207) 622-4868 February 11, 1993 MN-93-16 JRH-93-28 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention:
Document Control Desk Washington, DC 20555
References:
(a)
License No. DPR-36 (Docket No. 50-309)
(b) MYAPCo Letter to USNRC dated September 23, 1991 (MN-91-134)
(c) USNRC Letter to MYAPCo dated October 29, 1991; Inspection Report'-
~
No. 50-309/91-17 (d) MYAPCo letter to USNRC dated October 13, 1992 (MN-92-103)
Subject:
Inspection Report 91-17 Gentlemen:
Ir. our correspondence to you, Reference (d), Maine Yankee stated that we planned to complete the mid-loop procedure by March 1,.1993. That date was based on having-the loop accuracy calculations. for the residual heat removal' (RHR) flow and reactor coolant system (RCS) temperature indications completed. This was required to support the-mid-loop procedure. The loop accuracy calculation has been completed and Maine Yankee needs to replace two temperature indicators during the 1993 refueling before the mid-loop procedure can be-issued.
Maine Yankee now expects to complete the mid-loop procedure by December 31, 1993.
Please contact us should you have any quetions regarding this matter.
Very truly yours, ke g k.9 ames R. Hebert,~ Manage'r Licensing & Engineering Support Department i
y JVW/ jag c:
Mr. Thomas T. Martin Mr. Charles S. Marschall Mr. E. H. Trottier Mr. Patrick ~ J. Dostie 170)go 1
a.~,-
) ]Dl 9302170301 930211 PDR ADOCK 05000309 G