Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20200473, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (18:39:09, 12 December 2024)
- ML20128J494 + (18:39:24, 12 December 2024)
- IR 05000334/2020001 + (18:39:25, 12 December 2024)
- IR 05000400/2020001 + (18:39:27, 12 December 2024)
- ML20128J341 + (18:39:29, 12 December 2024)
- ML20128J340 + (18:39:30, 12 December 2024)
- ND-20-0464, Request for License Amendment: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation + (18:39:31, 12 December 2024)
- ML20128J326 + (18:39:32, 12 December 2024)
- IR 05000272/2020001 + (18:39:33, 12 December 2024)
- 05000352/LER-1985-061, :on 850625,inboard Reactor Water Cleanup Isolation Valve Closed as Result of Signal from Temp Switch.Caused by Defective Solder Connection on Internal Component of Temp Switch.Repairs Made + (18:39:35, 12 December 2024)
- ML20128J311 + (18:39:36, 12 December 2024)
- ML20128J316 + (18:39:36, 12 December 2024)
- ML20128J307 + (18:39:37, 12 December 2024)
- ML20128J306 + (18:39:38, 12 December 2024)
- ML20128J300 + (18:39:39, 12 December 2024)
- ML20128J299 + (18:39:40, 12 December 2024)
- ML20128J297 + (18:39:41, 12 December 2024)
- ML20128J298 + (18:39:41, 12 December 2024)
- ML20128J296 + (18:39:42, 12 December 2024)
- ML20128J295 + (18:39:43, 12 December 2024)
- ML20128J293 + (18:39:43, 12 December 2024)
- NG-20-0037, Correction to the 2018 Annual Radiological Environmental Operating Report + (18:39:47, 12 December 2024)
- IR 05000336/2020001 + (18:39:48, 12 December 2024)
- ML20128J286 + (18:39:49, 12 December 2024)
- ML20128J275 + (18:39:50, 12 December 2024)
- ML20128J273 + (18:39:51, 12 December 2024)
- ML20128J272 + (18:39:52, 12 December 2024)
- ML20128J256 + (18:39:52, 12 December 2024)
- ML20128J255 + (18:39:53, 12 December 2024)
- ML20128J253 + (18:39:54, 12 December 2024)
- ML20128J251 + (18:39:55, 12 December 2024)
- ML20128J242 + (18:39:55, 12 December 2024)
- ML20128J239 + (18:39:56, 12 December 2024)
- ML20128J237 + (18:39:57, 12 December 2024)
- ML20128J238 + (18:39:57, 12 December 2024)
- ML20128J235 + (18:39:58, 12 December 2024)
- PMNS20200517, And 10 CFR Part 50 Appendix H + (18:39:59, 12 December 2024)
- Press Release-II-20-013, NRC Schedules Virtual Meeting to Discuss 2019 Safety Performance of Catawba, McGuire and Oconee Nuclear Power Plants + (18:40:05, 12 December 2024)
- ML20128J226 + (18:40:06, 12 December 2024)
- IR 05000390/2020001 + (18:40:07, 12 December 2024)
- L-20-155, Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040) + (18:40:08, 12 December 2024)
- IR 05000327/2020001 + (18:40:10, 12 December 2024)
- ML20128J212 + (18:40:11, 12 December 2024)
- ML20128J209 + (18:40:12, 12 December 2024)
- ML20128J205 + (18:40:13, 12 December 2024)
- ML20128J206 + (18:40:13, 12 December 2024)
- ML20128J201 + (18:40:14, 12 December 2024)
- ML20128J204 + (18:40:14, 12 December 2024)
- ML20128J198 + (18:40:15, 12 December 2024)
- ML20128J197 + (18:40:16, 12 December 2024)
- W3P85-2148, Comments on Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Util Does Not Plan to Negotiate W/Or Meet W/Nrc Re Implementation of Integrated Schedules + (18:40:16, 12 December 2024)
- ML20128J195 + (18:40:17, 12 December 2024)