ML20128J297

From kanterella
Jump to navigation Jump to search
Attachment 4: HI-STORM 100 CoC Appendix C Proposed Changed Pages
ML20128J297
Person / Time
Site: Holtec, Consolidated Interim Storage Facility
Issue date: 04/28/2020
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML20128J292 List:
References
5014896
Download: ML20128J297 (6)


Text

5014896 Attachment 4 TABLE OF CONTENTS 1.0 USE AND APPLICATION ............................................................................... 1.1-1 1.1 Definitions ............................................................................................ 1.1-1 1.2 Logical Connectors .............................................................................. 1.2-1 1.3 Completion Times ................................................................................ 1.3-1 1.4 Frequency ............................................................................................ 1.4-1 2.0 NOT USED ..................................................................................................... 2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY ............... 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ............................. 3.0-2 3.1 SFSC INTEGRITY ............................................................................ 3.1.1-1 3.1.1 Multi-Purpose Canister........................................................... 3.1.1-1 3.1.2 HI-STORM 100S Version E SFSC Heat Removal System .... 3.1.2-1 3.1.3 MPC Cavity Reflooding ......................................................... 3.1.3-1 3.1.4 Supplemental Cooling System ............................................... 3.1.4-1 3.2 SFSC RADIATION PROTECTION ................................................... 3.2.1-1 3.2.1 TRANSFER CASK Surface Contamination ............................ 3.2.1-1 3.3 SFSC CRITICALITY CONTROL ....................................................... 3.3.1-1 3.3.1 Boron Concentration ............................................................. 3.3.1-1 Table 3-1 MPC Cavity Drying Limits .................................................................... 3.4-1 Table 3-2 MPC Helium Backfill Limits .................................................................. 3.4-3 Table 3-3 Completion Time for Actions to Restore HI-STORM 100S Version E SFSC Heat Removal System to Operable ..........3.4-4 Table 3-4 MPC-32M with up to Sixteen DFIs Soluble Boron Requirements .3.4-5 Table 3-5 MPC-32M with up to Twelve DFCs Soluble Boron Requirements ...3.4-6 Table 3-6 MPC-32M with Thirteen to Sixteen DFCs Soluble Boron Requirements .....3.4-7 Table 3-7 MPC-32/32F and Version 1 Soluble Boron Requirements ..3.4-8 4.0 NOT USED ....................................................................... 4.0-1 5.0 ADMINISTRATIVE CONTROLS.................................................................... 5.1-1 5.1 Radioactive Effluent Control Program for HI-STORM 100S Version E ................................................................. 5.1-1 5.2 Cask Transport Evaluation Program for HI-TRAC MS and HI-STORM 100S Version E .................................... 5.2-1 5.3 Radiation Protection Program .............................................................. 5.3-1 5.4 Fabrication Helium Leak Test .............................................................. 5.4-1 Certificate of Compliance No. 1014 Amendment No. 15 Appendix C i

5014896 Attachment 4 Multi-Purpose Canister (MPC) 3.1.1 3.1 SFSC INTEGRITY 3.1.1 Multi-Purpose Canister LCO 3.1.1 The MPC shall be dry and helium filled.

Table 3-1 provides decay heat and burnup limits for forced helium dehydration (FHD) and vacuum drying. FHD is not subject to time limits. Vacuum drying of MPCs may be subject to time limits, from the end of bulk water removal until the start of helium backfill, as shown in Table 3-1.

APPLICABILITY: During TRANSPORT OPERATIONS and STORAGE OPERATIONS.

ACTIONS


NOTES---------------------------------------------------------

Separate Condition entry is allowed for each MPC.

COMPLETION CONDITION REQUIRED ACTION TIME A. MPC cavity vacuum A.1 Perform an engineering 7 days drying pressure or evaluation to determine the demoisturizer exit gas quantity of moisture left in temperature limit not the MPC.

met.

AND A.2 Develop and initiate 30 days corrective actions necessary to return the MPC to compliance with Table 3-1.

Certificate of Compliance No. 1014 Amendment No. 15 Appendix C 3.1.1-1

5014896 Attachment 4 SFSC Heat Removal System 3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2 Verify all OVERPACK inlets and outlet area are Table 3-3 free of blockage from solid debris or floodwater.

OR For OVERPACKS with installed temperature Table 3-3 monitoring equipment, verify that the difference between the average OVERPACK air outlet temperature and ISFSI ambient temperature is

< 142oF (MPC-32M), or < 163oF (MPC-32 Version 1/MPC-68 Version 1), or < 155oF (MPC-24/24E/24EF/32/32F), or < 137oF (MPC-68/68F/68FF) or < 164oF (MPC-68M)

Certificate of Compliance No. 1014 Amendment No. 15 Appendix C 3.1.2-2

5014896 Attachment 4 Supplemental Cooling System 3.1.4 3.1 SFSC INTEGRITY 3.1.4 Supplemental Cooling System LCO 3.1.4 A supplemental cooling system (SCS) shall be operable


NOTE---------------------------------------------------------

Upon reaching steady state operation, the SCS may be temporarily disabled for a short duration (< 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />) to facilitate necessary operational evolutions, such as movement of the TRANSFER CASK through a door way, or other similar operation.

APPLICABILITY: This LCO is not applicable to the MPC-32M or 68M. This LCO is not applicable to the HI-TRAC MS TRANSFER CASK. For all other MPCs and TRANSFER CASKs, this LCO is applicable when the loaded MPC is in the TRANSFER CASK and:

a. Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the completion of MPC drying operations in accordance with LCO 3.1.1 or within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of transferring the MPC into the TRANSFER CASK if the MPC is to be unloaded AND
b. The MPC contains one or more fuel assemblies with an average burnup > 45,000 MWD/MTU AND c1. MPC backfilled to higher helium backfill limits in Appendix A Table 3-2 AND any storage cell decay heat load exceeds 90% of maximum allowable storage cell heat load defined in Appendix B, Section 2.4.1 or 2.4.2 and FSAR Section 2.1.9.1 procedures.

OR c2. MPC backfilled to lower helium backfill limits in Appendix A Table 3-2 AND any storage cell heat load exceeds 90% of storage cell heat load limits defined in Appendix A Table 3-3 or 3-4.

OR c3. MPC-32 Version 1/MPC-68 Version 1 where any storage cell heat load exceeds 90% of storage cell heat load limits defined in Appendix D Section 2.4.

Certificate of Compliance No. 1014 Amendment No. 15 Appendix C 3.1.4-2

5014896 Attachment 4 Heat Removal System Completion Times Table 3-3 Table 3-3 Completion Time for Actions to Restore HI-STORM 100S Version E SFSC Heat Removal System to Operable Note1 Condition A Condition B Decay Heat Limits per Surveillance MPC Material MPC Type Completion Completion Storage Location Frequency Time Time Alloy X MPC-32 Version 1/

Except Appendix D, Section 2.4 8 hrs 24 hrs 24 hrs MPC- 68 Version 1 Duplex Note3 MPC-32 Version 1/

Alloy X Appendix D, Section 2.4 8 hrs 16 hrs 16 hrs MPC-68 Version 1 MPC-32 Version 1 0.5 kW Alloy X MPC-68 Version 1 0.264 kW 24 hrs 64 hrs 30 days MPC-32M 0.75 kWNote 2 Appendix D SectionNote 2 Alloy X 2.4.1 Except MPC-32M OR 8 hrs 24 hrs 24 hrs Duplex Note 3 Appendix D SectionNote 2 2.4.2 Appendix D SectionNote 2 2.4.1 Alloy X MPC-32M OR 8 hrs 24 hrs 24 hrs Appendix D SectionNote 2

2.4.2 Notes

1. For limits applicable to MPC-24/24E/24EF/32/32F/68/68F/68FF/68M see Appendix A Table 3-5.
2. For MPC-32M, heat load limits may need to be modified based on fuel height, in accordance with Appendix D Section 2.4.4.
3. If any component of the MPC is made of duplex, these completion times are not applicable.

Certificate of Compliance No. 1014 Amendment No. 15 Appendix C 3.4-4

5014896 Attachment 4 Fabrication Helium Leak Test 5.4 ADMINISTRATIVE CONTROLS AND PROGRAMS 5.4 Fabrication Helium Leak Test At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer. This test shall include the base metals of the MPC shell and baseplate. A helium leak test shall also be performed on the base metal of the fabricated MPC lid. The confinement boundary leakage rate tests shall be performed in accordance with ANSI N14.5 to leaktight criteria. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.

Certificate of Compliance No. 1014 Amendment No. 15 Appendix C 5.4-1