From: Shea, James To: Schumitsch, Walter (GE Power Portfolio)
Cc: Catts, Michelle (GE Power Portfolio); Dudek, Michael; Beard, James A. (GE Power Portfolio)
Subject:
RE: RE: ABWR DC Renewal Supplemental FSER Chapter 22 Fukushima Recommendations Prop review and fact check Date: Tuesday, April 28, 2020 10:13:00 AM
- Skip, I have confirmed that all the FSER Chapters/Sections have been Prop reviewed and are now ready to be made public on the Web-site. Once I have updated the concurrence sheets in ADAMS I will have the FSERs declared and made public and posted on the Web-site. I will be developing standard appendices for the supplement 2 FSER to NUREG-1503 and the supplemental FSER will be referenced in the Rule making FRN. I will keep you posted on the status of our rulemaking activities.
Thanks!!
James Shea Senior Project Manager phone: (301)415-1388 james.shea@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-7D21 Washington, DC, 20555-0001 From: Schumitsch, Walter (GE Power Portfolio) <walter.schumitsch@ge.com>
Sent: Wednesday, April 22, 2020 5:29 PM To: Shea, James <James.Shea@nrc.gov>
Cc: Catts, Michelle (GE Power Portfolio) <Michelle.Catts@ge.com>; Dudek, Michael
<Michael.Dudek@nrc.gov>; Beard, James A. (GE Power Portfolio) <james1.beard@ge.com>
Subject:
[External_Sender] RE: ABWR DC Renewal Supplemental FSER Chapter 22 Fukushima Recommendations Prop review and fact check
- Jim, GEH has reviewed ABWR DC Renewal Supplemental FSER Chapter 22 provided in the below email. The review determine it does not contain any information that GEH would want to withhold from public disclosure, nor does it contain any information that is factually incorrect.
Thank you for the opportunity to review the information before its release.
This should be the last FSER review requested. Here is my final table of status:
Row Section Received To Jim Shea 1 2.6.8 Site Acceptability final Prop and fact check 23-Mar-20 24-Mar-20 2 2.6.2 Flood Design Parameters DNRL FO 19-Mar-20 24-Mar-20 3 3.2.3 Safety Classifications 24-Mar-20 25-Mar-20
4 4.2 Fuel System Design 24-Mar-20 25-Mar-20 3.7.3 Seismic Subsystem Analysis 24-Mar-20 26-Mar-20 5
6 5.2.5 Reactor Coolant Pressure Boundary Leakage Detection 24-Mar-20 25-Mar-20 5.4.7 RHR 24-Mar-20 26-Mar-20 7
8 5.4.7.1.1.10 ACIWA 24-Mar-20 26-Mar-20 9 6.2.1.6 Suppression Pool Dynamic Loads 25-Mar-20 26-Mar-20 7.5.2.1 Post Accident Monitoring System 25-Mar-20 26-Mar-20 10 11 7.7.1.2.1 Control Rod Ganged Withdrawal Sequence Restrictions 25-Mar-20 26-Mar-20 12 12.3 Radiation Protection Design Features 26-Mar-20 26-Mar-20 13 11.4 Solid Waste Management System 26-Mar-20 26-Mar-20 14 9.1.5 Overhead Heavy Load Handling Systems 26-Mar-20 26-Mar-20 15 9.1.1 New Fuel Storage 25-Mar-20 14-Apr-20 16 2.3 Meteorology 31-Mar-20 14-Apr-20 17 2.5 Geological Seismological and Geotechnical Engineering 31-Mar-20 14-Apr-20 18 6.2.1.3 Short-Term Pressure Response 2-Apr-20 14-Apr-20 19 5.4.8 Reactor Coolant System and Connected Systems 2-Apr-20 14-Apr-20 20 3.5.1.4 Missiles Generated by Natural Phenomena 1-Apr-20 14-Apr-20 21 3.3 Wind and Tornado Loadings 31-Mar-20 14-Apr-20 22 6.3 Emergency Core Cooling Systems 2-Apr-20 14-Apr-20 23 6.2.1.9 Containment Debris Protection for ECCS Strainers 2-Apr-20 15-Apr-20 8.2.5 & 8.3.3.17 NRC Bulletin 2012-01 Electrical Power 24 Vulnerability 3-Apr-20 17-Apr-20 25 7.4.1.4.4 Shutdown Panel 3-Apr-20 15-Apr-20 26 8.3.4.4 Class 1E Bus Isolation 3-Apr-20 15-Apr-20 27 9.1.4 Light Load Handling FSER 8-Apr-20 15-Apr-20 28 9.1.3 Fuel Pool Cooling and Cleanup System 8-Apr-20 16-Apr-20 29 9.1.2.2 Fuel Racks 7-Apr-20 15-Apr-20 30 9.1.2.1 New and Spent Fuel Storage 7-Apr-20 17-Apr-20 31 9.5.1 Fire Protection System 9-Apr-20 17-Apr-20 32 12.2 Radiation Sources 9-Apr-20 17-Apr-20 33 13.3 Emergency Planning 9-Apr-20 17-Apr-20 34 13.5 Plant Procedures 9-Apr-20 17-Apr-20 35 19.5 Aircraft Impact Assessment 13-Apr-20 22-Apr-20 36 19.2.3.3.4 ABWR Containment Vent Design 11-Apr-20 17-Apr-20 37 14.3.2.6 & 14.3.2.3.8 ASME Code 10-Apr-20 22-Apr-20 38 16 Technical Specifications 10-Apr-20 22-Apr-20 39 19.1 Probabilistic Risk Assessment 10-Apr-20 22-Apr-20 40 22 Fukushima Recommendations 13-Apr-20 22-Apr-20 41 1 Introduction and General Discussion 14-Apr-20 22-Apr-20 Walter (Skip) Schumitsch, MBA, P.E.
Senior Project Manager GE Hitachi Nuclear Energy T +1 910 819 4878 l M +1 910 547 6669
From: Shea, James [1]
Sent: Monday, April 13, 2020 6:18 PM To: Schumitsch, Walter (GE Power Portfolio) <walter.schumitsch@ge.com>
Cc: Catts, Michelle (GE Power Portfolio) <Michelle.Catts@ge.com>; Dudek, Michael
<Michael.Dudek@nrc.gov>
Subject:
EXT: ABWR DC Renewal Supplemental FSER Chapter 22 Fukushima Recommendations Prop review and fact check
- Skip, In preparation for completion of the ABWR DC renewal rule, I have attached a courtesy copy of the NUREG 1503 supplemental Final Safety Evaluation Report (FSER) for Chapter 22 Fukushima Recommendations.
The staff concludes that the enclosed supplemental FSER section does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the attached supplemental FSER from public disclosure to allow you the opportunity to verify the staffs conclusion that the supplemental FSER section contains no such exempt information or any factual errors.
The attached supplemental FSER is password protected and I had previously provided you the DC Renewal PSWD Convention for all supplemental FSERs. If you need to be reminded please call me on my cell number (609-220-0306).
James Shea Senior Project Manager phone: (301)415-1388 james.shea@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-7D21 Washington, DC, 20555-0001