Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129G274 + (16:15:19, 12 December 2024)
- ML20129G272 + (16:15:20, 12 December 2024)
- ML20129G270 + (16:15:21, 12 December 2024)
- IR 05000341/1996009 + (16:15:22, 12 December 2024)
- ML20129G269 + (16:15:22, 12 December 2024)
- ML20129G263 + (16:15:26, 12 December 2024)
- ML20129G262 + (16:15:27, 12 December 2024)
- ML20129G261 + (16:15:28, 12 December 2024)
- ML20129G260 + (16:15:28, 12 December 2024)
- ML20129G258 + (16:15:29, 12 December 2024)
- 05000309/LER-1985-003, :on 850430,automatic Reactor Trip on Loss of Load Occurred Due to Main Turbine Trip.Caused by Technician Incorrectly Verifying Protective Circuiting Contact Positions.Technician Counseled + (16:15:31, 12 December 2024)
- ML20129G254 + (16:15:32, 12 December 2024)
- 05000341/LER-1985-014, :on 850501,reactor Protection Sys Actuation Occurred on Erroneous Indication at Reactor Vessel Level 3, Resulting in Full Scram & Isolation Signal for Valve Groups 4,13 & 15.Caused by Personnel Error + (16:15:34, 12 December 2024)
- ML20129G245 + (16:15:35, 12 December 2024)
- ML20129G243 + (16:15:36, 12 December 2024)
- ML20129G239 + (16:15:38, 12 December 2024)
- ML20129G240 + (16:15:38, 12 December 2024)
- ML20129G238 + (16:15:39, 12 December 2024)
- ML20129G234 + (16:15:40, 12 December 2024)
- ML20129G231 + (16:15:42, 12 December 2024)
- IR 05000309/1985003 + (16:15:44, 12 December 2024)
- ML20129G229 + (16:15:45, 12 December 2024)
- ML20129G227 + (16:15:45, 12 December 2024)
- ML20129G224 + (16:15:46, 12 December 2024)
- ML20129G222 + (16:15:47, 12 December 2024)
- ML20129G223 + (16:15:47, 12 December 2024)
- ML20129G220 + (16:15:48, 12 December 2024)
- ML20129G221 + (16:15:48, 12 December 2024)
- ML20129G219 + (16:15:49, 12 December 2024)
- ML20129G217 + (16:15:50, 12 December 2024)
- ML20129G216 + (16:15:51, 12 December 2024)
- ML20129G215 + (16:15:52, 12 December 2024)
- ML20129G214 + (16:15:53, 12 December 2024)
- ML20129G211 + (16:15:54, 12 December 2024)
- ML20129G212 + (16:15:54, 12 December 2024)
- ML20129G207 + (16:15:55, 12 December 2024)
- ML20129G204 + (16:15:56, 12 December 2024)
- ML20129G201 + (16:15:57, 12 December 2024)
- ML20129G202 + (16:15:57, 12 December 2024)
- ML20129G199 + (16:15:58, 12 December 2024)
- ML20129G198 + (16:15:59, 12 December 2024)
- ML20129G197 + (16:15:59, 12 December 2024)
- BSEP-96-0336, Responds to Violations Noted in Insp Repts 50-324/96-10 & 50-325/96-10.Corrective actions:TM-1.05 Revised to Include Academic Review of LOR Training Program Failures + (16:16:03, 12 December 2024)
- ML20129G194 + (16:16:03, 12 December 2024)
- ML20129G191 + (16:16:04, 12 December 2024)
- NG-96-1968, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-331/96-05.Corrective actions:960730 Revised SE, Assuming Worst Case Heat Load During Previous Outage Was Issued + (16:16:05, 12 December 2024)
- ML20129G190 + (16:16:05, 12 December 2024)
- ML20129G188 + (16:16:06, 12 December 2024)
- ML20129G186 + (16:16:07, 12 December 2024)
- 05000374/LER-1985-021-03, :on 850503,during Cold Shutdown,Discovered That Cables from Sensors in Reactor Bldg Basement to Control Room Improperly Labeled.Probably Caused by Initial Const Error. Sensors Replaced + (16:16:09, 12 December 2024)
- ML20129G184 + (16:16:13, 12 December 2024)
- ML20129G181 + (16:16:14, 12 December 2024)