Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000219/1985005 + (15:58:25, 12 December 2024)
- ML20129H593 + (15:58:26, 12 December 2024)
- ML20129H592 + (15:58:26, 12 December 2024)
- IR 05000454/1985008 + (15:58:27, 12 December 2024)
- ML20129H590 + (15:58:28, 12 December 2024)
- ML20129H589 + (15:58:29, 12 December 2024)
- ML20129H588 + (15:58:30, 12 December 2024)
- PNO-V-85-042A, on 850710,licensee Received Several Contaminated Packages.Caused by Tihange Reactor in Belgium Mixing Fission Products.Licensee & State of Wa Decontaminating Containers & Tools + (15:58:31, 12 December 2024)
- ML20129H585 + (15:58:32, 12 December 2024)
- ML20129H584 + (15:58:32, 12 December 2024)
- ML20129H583 + (15:58:33, 12 December 2024)
- ML20129H582 + (15:58:34, 12 December 2024)
- ML20129H581 + (15:58:34, 12 December 2024)
- ML20129H579 + (15:58:35, 12 December 2024)
- 05000295/LER-1996-011-01, :on 960327,missed Inservice Testing Requirements for 1AOV-BD0008 & 1A0V-S18870A Resulting from Deficient Procedure.Procedures Revised to Address post-maint Testing + (15:58:39, 12 December 2024)
- ML20129H577 + (15:58:40, 12 December 2024)
- ML20129H575 + (15:58:41, 12 December 2024)
- IR 05000456/1985024 + (15:58:44, 12 December 2024)
- ML20129H572 + (15:58:45, 12 December 2024)
- ML20129H571 + (15:58:45, 12 December 2024)
- 05000304/LER-1996-007-08, :on 960930,TS Action Statement Were Not Performed within Allowable Time Frame as Result of Mgt Deficiency.Lesson Plan Developed & Presented to All Licensed Shift Personnel + (15:58:48, 12 December 2024)
- ML20129H569 + (15:58:49, 12 December 2024)
- NSD-NRC-96-4863, Forwards Proprietary & Nonproprietary Versions of Draft Sections 5 & 6 of Notrump Verification & Validation Rept Scheduled for Completion by 961017.Proprietary Portion Withheld Per 10CFR2.790 + (15:58:50, 12 December 2024)
- ML20129H567 + (15:58:51, 12 December 2024)
- ML20129H565 + (15:58:52, 12 December 2024)
- ML20129H563 + (15:58:53, 12 December 2024)
- ML20129H561 + (15:58:54, 12 December 2024)
- ML20129H562 + (15:58:54, 12 December 2024)
- ML20129H560 + (15:58:55, 12 December 2024)
- ML20129H559 + (15:58:56, 12 December 2024)
- ML20129H558 + (15:58:57, 12 December 2024)
- 05000254/LER-1996-014-03, :on 960927,electrical Distribution Weekly Surveillance Did Not Document Voltage Verification Due to an Inadequate Procedure.Qcos 0005-06 Has Been Revised to Ensure Verification of Proper Voltages + (15:58:59, 12 December 2024)
- ML20129H555 + (15:59:00, 12 December 2024)
- ML20129H554 + (15:59:01, 12 December 2024)
- ML20129H552 + (15:59:02, 12 December 2024)
- ML20129H550 + (15:59:02, 12 December 2024)
- 05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed + (15:59:03, 12 December 2024)
- ML20129H546 + (15:59:04, 12 December 2024)
- 05000362/LER-1996-005-01, :on 960928,reactor Head Vent Valve Discovered Mispostioned.Caused by Incorrect Completion of RCS post-fill Valve Alignment Procedure.Util Confirmed Review of Records That Head Vent Valve Closed + (15:59:07, 12 December 2024)
- ML20129H542 + (15:59:08, 12 December 2024)
- ML20129H541 + (15:59:09, 12 December 2024)
- ML20129H540 + (15:59:09, 12 December 2024)
- ML20129H539 + (15:59:10, 12 December 2024)
- ML20129H535 + (15:59:11, 12 December 2024)
- IR 05000293/1996006 + (15:59:21, 12 December 2024)
- IR 05000266/1996004 + (15:59:22, 12 December 2024)
- ML20129H529 + (15:59:23, 12 December 2024)
- 05000425/LER-1996-005-02, :on 960925,pressurizer Safety Valve Were Found to Be Open at Pressures Above Setpoints.Caused by Drift in Valves.Worn Bellows & Spindles Were Replaced,Psvs Were Readjusted Valves Were reinstalled.W961024 Ltr + (15:59:25, 12 December 2024)
- RBG-21524, Forwards Revised FSAR & Tech Specs,Updating Figure 8.3.3 for Second Level Undervoltage for Div III 4.6 Kv Bus,Per Power Sys Branch Request.Rev to FSAR Will Be Included in Future Amend + (15:59:26, 12 December 2024)
- ML20129H522 + (15:59:27, 12 December 2024)
- ML20129H525 + (15:59:27, 12 December 2024)