ML20129H562
| ML20129H562 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/15/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20129H566 | List: |
| References | |
| NUDOCS 8507190243 | |
| Download: ML20129H562 (3) | |
Text
__
i DUKE POWER COMPANY P.O. DOx 33180 CHARLOTTE. N.C. 28942 RAL B.'ll.*CKER vetrenowr.
nos rosesseer (704) 073-4 NH
~~
July 15, 1985 t
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 r
Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Technical Specifications for the Containment Isolation System i
Dear Mr. Denton:
Attached are proposed license amendments to Facility Operating Licenses NPF-9 t
and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively. The proposed changes in the Technical Specifications are concerned with the Containment Isolation Systems (T.S. 3.6.3) and involve deleting valve NI-1223 from Table 3.6-2 of the Technical Specifications. This valve has been determined to not require a containment isolation signal. Associated with this proposed change of Technical Specifications is a station modification which would remove the containment isolation signal to valve NI-122B. This valve is normally closed during operation.
l I
Attachment I contains the proposed Technical Specification changes. Attachment II provides Justification and Safety Analysis in support of the proposed changes.
Attachment III provides a determination that the proposed changes do not involve l
any significant hazards consideration, as defined by 10CFR 50.92.
This request involves one application for amendment to McGuire's Technical Specifications. Accordingly, pursuant to 10CFR 170.21, a check for $150.00 is enclosed.
Picase contact us if you require any additional information.
Very truly yours, l
~~
W Hal B. Tucker Y'
l WHM/mjf j[8 t
Attachments
(
i w{ h
/
I 4(g0,
glha t
cc:
Dr. J. Nelson Grace, 'tegional Administrator S
U. S. Nuclear Regulatory Commission f
Region II II i
101 Marietta Street, Suite 3100 l
Atlanta, Georgia 30323 en9
F Hr. Harold R. Denton, Director Office of Nuclear Reactor Regulation July 15, 1985 Page l cc:
Mr. W. T. Orders Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown Radiation Protection Branch Division of Facility Services Department of Human Resources P. O. Box 12200 Raleigh, N. C. 27605 l
1 l
-.. = - - _ _
e Mr. liarold R. D:nton, Director Office of Nuclear Reactor Regulation July 15, 1985 Page HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge, d
Ital B. Tucker, Vice President Subscribed and sworn to before me this 15th day of July, 1985
_o 0. Y em No~tary Public
~
My Commission Expires:
Jhtbu 10 l9 V9
/
- - - - -