Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-IV-85-054, on 851005,reactor Manually Tripped Due to Sudden Increase in Vibration of Low Pressure Turbine Elements in Main Turbine Condensate Activity.Caused by Possible Damage to Condenser Tubes.State of Ne Informed + (13:46:54, 12 December 2024)
- ML20133D570 + (13:46:54, 12 December 2024)
- ML20133D568 + (13:46:55, 12 December 2024)
- ML20133D565 + (13:46:56, 12 December 2024)
- ML20133D567 + (13:46:56, 12 December 2024)
- ST-HL-AE-1291, Final Deficiency Rept Re Potential Failure of Portable Water Line in Relay Room.Initially Reported on 850606.Item Will Be Tracked as Part of Incident Review Committee Work Plans.Item Not Reportable Under 10CFR50.55(e) + (13:46:57, 12 December 2024)
- 05000322/LER-1985-037, :on 850906,low Level 3 Scram Occurred.Caused by Technician Valving Transmitter Back Into Svc & Not Detecting Pressure Perturbation Traveling Through Instrument Line to Variable Leg.Info Tags Hung on Instruments + (13:46:59, 12 December 2024)
- ST-HL-AE-5523, Forwards Rev 5 to Updated Fsar.New Updated FSAR Section 1.3.1 Has Been Added to Delineate Info Included in UFSAR Not Considered to Be Design or Licensing Basis Info + (13:47:00, 12 December 2024)
- ML20133D560 + (13:47:00, 12 December 2024)
- ML20133D554 + (13:47:01, 12 December 2024)
- IR 05000029/1985013 + (13:47:02, 12 December 2024)
- ML20133D547 + (13:47:03, 12 December 2024)
- ML20133D545 + (13:47:04, 12 December 2024)
- ML20133D544 + (13:47:04, 12 December 2024)
- BSEP-85-0526, Responds to Violations Noted in Insp Repts 50-324/84-39 & 50-325/84-39 & Inspector Followup Item 84-39.Corrective Actions:Section 4.3.1.3 of Procedure OI-01 Revised + (13:47:05, 12 December 2024)
- ML20133D539 + (13:47:06, 12 December 2024)
- AECM-85-0317, Forwards Calculational Info to Justify Proposed Increase in Diesel Fuel Oil Storage Requirements in 850823 Proposed Change to Tech Specs 3.8.1.1.b.2.a & 3.8.1.2.b.2.a + (13:47:07, 12 December 2024)
- ML20133D535 + (13:47:07, 12 December 2024)
- IR 05000250/1984029 + (13:47:11, 12 December 2024)
- ML20133D531 + (13:47:12, 12 December 2024)
- IR 05000416/1984048 + (13:47:14, 12 December 2024)
- ML20133D527 + (13:47:15, 12 December 2024)
- ML20133D526 + (13:47:16, 12 December 2024)
- ST-HL-AE-1299, Final Deficiency Rept Re Depressurization of Electrical Auxiliary Bldg,Control Room & Technical Support Ctr Common Air Intake Plenum.Initially Reported on 850612.Tornado Damper Added & Missile Protection Provided + (13:47:16, 12 December 2024)
- ML20133D518 + (13:47:17, 12 December 2024)
- ML20133D517 + (13:47:18, 12 December 2024)
- ML20133D512 + (13:47:19, 12 December 2024)
- ML20133D511 + (13:47:19, 12 December 2024)
- 05000341/LER-1985-056, :on 850826,determined That Leak Rate Test Not Performed After Maint on Div II Thermal Recombiner on 850620.Leak Test on 850829 Indicated Excessive Leakage. Caused by Damaged Gasket.Gasket Replaced + (13:47:23, 12 December 2024)
- ML20133D506 + (13:47:24, 12 December 2024)
- IR 05000925/2010009 + (13:47:25, 12 December 2024)
- PNO-III-85-065A, on 850729,containment Spray Pump 1B Failed to Start Due to Incorrect Overcurrent Setpoint.Caused by Personnel Error.Licensee Investigation Complete.Erroneous Setpoint Could Have Existed Since 1984 W/No Pump Failures + (13:47:25, 12 December 2024)
- ML20133D501 + (13:47:26, 12 December 2024)
- ML20133D500 + (13:47:27, 12 December 2024)
- AECM-85-0022, Responds to NRC Re Inadequate Response to Violations Noted in Insp Rept 50-416/84-48.Results of Review Did Not Identify Further Misuse of Matl Types, Confirming That Generic Condition Did Not Exist + (13:47:28, 12 December 2024)
- ML20133D496 + (13:47:28, 12 December 2024)
- ML20133D495 + (13:47:29, 12 December 2024)
- ML20133D493 + (13:47:29, 12 December 2024)
- ML20133D491 + (13:47:30, 12 December 2024)
- ML20133D487 + (13:47:31, 12 December 2024)
- ML20133D486 + (13:47:31, 12 December 2024)
- ML20133D485 + (13:47:32, 12 December 2024)
- ML20133D484 + (13:47:33, 12 December 2024)
- ML20133D482 + (13:47:34, 12 December 2024)
- ML20133D483 + (13:47:34, 12 December 2024)
- ML20133D480 + (13:47:35, 12 December 2024)
- ML20133D481 + (13:47:35, 12 December 2024)
- ML20133D479 + (13:47:36, 12 December 2024)
- ML20133D477 + (13:47:37, 12 December 2024)
- 05000293/LER-1985-015, :on 850624,both Trains of Standby Gas Treatment Sys Started After Secondary Containment Isolation Received. Caused by Operator Error.Operations Personnel Instructed in Handling of Radiation Monitors + (13:47:38, 12 December 2024)
- ML20133D475 + (13:47:39, 12 December 2024)
- ML20133D473 + (13:47:40, 12 December 2024)