Mr. Ted C. Feigerbaum January 2, 1997

, Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster Director - Nuclear Licensing Services P.O. Box 128 Waterford, CT 06385

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE IMPLEMENTATION OF 10 CFR PART 50 APPENDIX J, OPTION.B - LICENSE AMENDMENT REQUEST 96-05 (TAC NO. M95312)

Dear Mr. Feigenbaum:

License Amendment Request 96-05, submitted.by North Atlantic Energy Service Corporation on June 4, 1996, proposed changes to the Appendix A Technical Specifications (TSs) for the Seabrook Station, Unit No. I to implement 10 CFR Part 50 Appendix J, Optinn B. The proposal included changes to TS Sectio's n 3.6.1.7 and 4.6.1.7.1 relating to the 8-inch containment purge supply and exhaust valves. The requirements for more frequent testing than required by Appendix J of containment purge system valves with resilient seals resulted from the resolution of Generic Issue B-20,' " Containment Leakage due to Seal Deterioration" and IE Circular 77-11, " Leakage of Containment isolation Valves with Resilient Seals."

Augmented testing requirements for these valves are not part of Appendix J, therefore, they cannot be modified by a change to AppeMix J. However, the staff has considered changes to the leakage rate testi d frequency for these valves provided sufficient information is submitted to demonstrate good leakage rate perfornance over an extended time period. Therefore, we require additional information to complete our review and evaluation of the proposed changes to TS 3.6.1.7 and 4.6.1.7.1. Please provide by January 31, 1997, the results of leakage tests performed on these valves and valve maintenance history from 1990 to the piesent.

l Sincerely,

/S/

Albert W. De Agazio, Sr. Project Manager Project Directorate 1-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-443 Serial No. SEA-96-017 cc: See next page DISTRIBUTION: NBC FR.E CENTER COPY t See next page FO( D DOCUMENT NAME: A:\SB95312.RAI To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" - No copy 0FFICE PM:PDl 1 /M(.U l E l LAPOI1JV l _] D PDI 1 ,,g]

l l l l NAME ADeAgatio/rtl StittleV SBajwa /J'HA 01/ t /97 \ 01/ /97 01/ /97 DATE 01/ 4 /97 01/ A /97 Offic1al Record Copy 9701090225 970102 PDR ADOCK 05000443 P PDR

. _.090039 . .

- - = , - . _ .

u

[ps@ Mo& UNITED STATES

,j

. g NUCLEAR REGULATORY COMMISSION o '2 WASHINGTON. D.C. 2066H001 g ..... / January 2, 1997 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster Director - Nuclear Licensing Services P.O. Box 128 l Waterford, CT 06385 l

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE IMPLEMENTATION OF l 10 CFR PART 50 APPENDIX J, OPTION B - LICENSE AMENDMENT REQUEST 96-05 (TAC NO. M95312)

Dear Mr. Feigenbaum:

License Amendment Request 96-05, submitted by North Atlantic Energy Service Corporation on June 4, 1996, proposed changes to the Appendix A Technical Specifications (TSs) for the Seabrook Station, Unit No. I to implement 10 CFR Part 50 Appendix J, Option B. The proposal included changes to TS Sections 3.6.1.7 and 4.6.1.7.1 relating to the 8-inch containment purge supply and exhaust valves. The requirements for more frequent testing than required by Appendix J of containment purge system valves with resilient seals resulted i

from the resolution of Generic issue B-20, " Containment Leakage due to Seal Deterioration" and IE Circular 77-11, " Leakage of Containment Isolation Valves with Resilient Seals."

Augmented testing requirements for these valves are not part of Appendix J, therefore, they cannot be modified by a change to Appendix J. However, the staff has considered changes to the leakage rate testing frequency for these

! valves provided sufficient information is submitted to demonstrate good l leakage rate performance over an extended time period. Therefore, we require l additional information to complete our review and evaluation of the proposed I changes to TS 3.6.1.7 and 4.6.1.7.1. Please provide by January 31, 1997, the

! results of leakage tests performed on these valves and valve maintenance l history from 1990 to the present.

l i

Sincerely, h//w /

Albert De Agazio, Sr.

f roject Manager

, Project Directorate I-l i

Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-443 Serial No. SEA-96-017

cc
See next page i

1

i , T. Feigenbaum Seabrook Station, Unit No. 1 I Northeast Utilities Service Company l cc:

l l Lillian M. Cuoco, Esq. Mr. Jack Dolan Senio" Nuclear Counsel Federal Emergency Management Agency Northeast Utilities Service Company Region I P.O. Box 270 J.W. McCormack P.O. &

Hartford, CT 06141-0270 Courthouse Building, Room 442 Boston, MA 02109 Mr. Peter Brann Assistant Attorney General Mr. David Rodham, Director State House, Station #6 ATTN: James Muckerheide l Augusta, ME 04333 Massachusetts Civil Defense Ageticy l 400 Worcester Road Resident Inspector P.O. Box 1496 i U.S. Nuclear Regulatory Commission Framingham, MA 01701-0317 l l Seabrook Nuclear Power Station '

P.O. Box 1149 Jeffrey Howard, Attorney General  ;

, Seabrook, NH 03874 G. Dana Bisbee, Deputy Attorney '

l General Jane Spector 33 Capitol Street l Federal Energy Regulatory Commission Concord, NH 03301 1

825 North Capital Street, N.E.

Room 8105 Mr. D. M. Goebel Washington, DC 20426 Vice President-Nuclear Oversight Northeast Utilities Service Company

Town of Exeter P. O. Box 270 l 10 Front Street Hartford, CT 06141-0270 l Exeter, NH 03823 i Mr. J. K. Thayer l Mr. George L. Iverson, Director Recovery Officer, Nuclear Engineering New Hampshire Office of Emergency and Support Management Northeast Utilities Service Company State Office Park South P.O. Box 128 l 107 Pleasant Street Waterford, CT 06385 l

Concord, NH 03301

! Mr. F. C. Rothen l Regional Ad.ninistrator, Region I Vice President - Nuclear Work Services U.S. Nuclear Regulatory Commission Northeast Utilities Service Company 475 Allendale Road P.O. Box 128 King of Prussia, PA 19406 Waterford, CT 06385 Office of the Attorney General One Ashburton Place Mr. A. M. Callendrello 20th Floor Licensing Manager - Seabrook Station Boston, MA 02108 North Atlantic Energy Service Corp.

P.O. Box 300 Board of Selectmen Seabrook, NH 03874 Town of Amesbury i Town Hall Amesbury, MA 01913 4

i

=. - . - .

o .

I j

f T. Feigenbaum i Seabrook Station, Unit No. 1 NortheastUtilitiesferviceCompany cc:

l t

Mr. W. A. DiProfio .

l Nuclear Unit Director (

Seabrook Station .

j North Atlantic Energy Service Corporation l P.O. Box 300

)

Seabrook, NH 03874 Mr. Frank W. Getman, Jr.

Cocheco Falls M111 works 100 Main Street, Suite 201 Dover, NH 03820 l

Mr. B. D. Kenyon i <

President - Nuclear Group Northcast Utilitics Service Group P.O. Box 128 l Waterford, CT 06385' i Mr. B. L. Drawbridge j 1

Executive Director Services &

Senior Site Officer North Atlantic Energy Service Corp.

Seabrook, NH 03874 i

i i

I J

7 DISTRIBUTION:

Docket File PUBLIC PDI-l R/F S. Varga J. Zwolinski S. Bajwa S. Little A. De Agazio OGC ACRS J. Rogge, Region I l

._ _ ~_ - --