Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133P279 + (12:14:59, 12 December 2024)
- ML20133P275 + (12:15:00, 12 December 2024)
- ML20133P274 + (12:15:01, 12 December 2024)
- ML20133P270 + (12:15:02, 12 December 2024)
- ML20133P269 + (12:15:03, 12 December 2024)
- ST-HL-AE-1444, First Interim Deficiency Rept Re Insp of Structural Steel Installation.Initially Reported on 850920.Thorough Review of Insp Documentation in Progress.Next Rept Will Be Submitted by 851220 + (12:15:03, 12 December 2024)
- ML20133P264 + (12:15:04, 12 December 2024)
- ML20133P262 + (12:15:05, 12 December 2024)
- 05000454/LER-1985-065, :on 850709,process Radiation Monitor OPR33J Went to Interlock Mode on Two Occasions.Caused by Inadvertent Bumping of Pump Flow Control Switch.Handles to Air Intake Monitors Removed + (12:15:07, 12 December 2024)
- ML20133P260 + (12:15:08, 12 December 2024)
- IR 05000321/1985015 + (12:15:09, 12 December 2024)
- ML20133P258 + (12:15:09, 12 December 2024)
- ML20133P256 + (12:15:10, 12 December 2024)
- AECM-85-0248, Withdraws 850712 Proposed Change to License NPF-29,Item 7,to Reduce Burden of Requiring Rev to OL W/Each Tech Spec Amend. Change Inconsistent W/Past NRC Practices & Procedures + (12:15:11, 12 December 2024)
- ML20133P254 + (12:15:11, 12 December 2024)
- ML20133P250 + (12:15:12, 12 December 2024)
- ML20133P249 + (12:15:13, 12 December 2024)
- ML20133P248 + (12:15:13, 12 December 2024)
- TXX-4299, Closes Out Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp Facilities.Vendors Confirmed No Tube-Line Matl Furnished to Facility + (12:15:17, 12 December 2024)
- ML20133P240 + (12:15:22, 12 December 2024)
- IR 05000395/1985022 + (12:15:23, 12 December 2024)
- ML20133P238 + (12:15:24, 12 December 2024)
- ML20133P237 + (12:15:24, 12 December 2024)
- IR 05000269/1984016 + (12:15:25, 12 December 2024)
- ML20133P233 + (12:15:26, 12 December 2024)
- ML20133P230 + (12:15:27, 12 December 2024)
- ML20133P223 + (12:15:28, 12 December 2024)
- ML20133P228 + (12:15:28, 12 December 2024)
- ML20133P222 + (12:15:29, 12 December 2024)
- HBL-85-035, Forwards Complete Response to Item 75 of NRC 850123 & 0214 Requests for Addl Info Re Safstor Decommissioning of Facility.Util Response to NRC Questions on Safstor Decommissioning Complete + (12:15:30, 12 December 2024)
- ML20133P220 + (12:15:31, 12 December 2024)
- ML20133P219 + (12:15:31, 12 December 2024)
- IR 05000302/1985023 + (12:15:32, 12 December 2024)
- ML20133P216 + (12:15:32, 12 December 2024)
- IR 05000416/1985025 + (12:15:35, 12 December 2024)
- RBG-21825, Withdraws 850812 Exemption Request for Square D,125 Dc Panelboard.Seismic Qualification for Panelboard,Spec 242.421,completed + (12:15:36, 12 December 2024)
- ML20133P212 + (12:15:36, 12 December 2024)
- AECM-85-0230, Submits Addl Info Re Proposed Addition to License NPF-29 Submitted in on Use of Auxiliary Bldg Railroad Bay Area as Secondary Containment Boundary While Spent Fuel Racks & Equipment Being Moved + (12:15:37, 12 December 2024)
- ML20133P207 + (12:15:38, 12 December 2024)
- ML20133P208 + (12:15:38, 12 December 2024)
- IR 05000414/1985029 + (12:15:39, 12 December 2024)
- ML20133P199 + (12:15:40, 12 December 2024)
- ML20133P203 + (12:15:40, 12 December 2024)
- ML20133P198 + (12:15:41, 12 December 2024)
- ML20133P197 + (12:15:42, 12 December 2024)
- ML20133P195 + (12:15:42, 12 December 2024)
- ML20133P190 + (12:15:47, 12 December 2024)
- ML20133P185 + (12:15:48, 12 December 2024)
- ML20133P182 + (12:15:49, 12 December 2024)
- 05000482/LER-1985-067, :on 850923,reactor Trip,Turbine Trip,Steam Generator Blowdown & Sample Isolation,Feedwater Isolation & Auxiliary Feedwater Actuation Occurred.Caused by Failed Controller Card.Card Replaced + (12:15:51, 12 December 2024)
- ML20133P178 + (12:15:52, 12 December 2024)