Interim Potentially Reportable Deficiency Rept DER 85-32 Re Seismic Separation Between Bldgs.Initially Reported on 850917.Due to Extensive Investigation,Final Rept Delayed Until 851101
ML20133P275
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/15/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-33719-TDS, DER-85-32, NUDOCS 8510310254
Download: ML20133P275 (3)


Text

.

O-

'E0 Arizona Nuclear Power Project

!J35 03 p j y[ //:

P O 00X52034 e PHOENIX, ARIZON A 85072-2034 October 15, 1985 ANPP-33719 -TDS/TPS 9fgfg7j U. S. Nuclear Regulatory Commission Region V 1450 Maria Lan - Suite 210 Walnut Creek, CA 94596-5308 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Interim Report - DER 85-32 A 50.55(e) Potentially Reportable Deficiency Relating To Seismic Separation Between Buildings.

File: 85-006-216; D.4.33.2

Reference:

Telephone Conversation between A. Hon and T. Siegfried on September 17, 1985.

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the ref-erenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days, (October 17, 1985).

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by November 1, 1985, at which time a complete report will be submitted.

Very truly yours, bd h44.

Am E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/TPS/lll Attachment cc: See Page Two 8510310254 851015 PDR ADOCK 05000529 PDR S

Iglt T&27

l ANPP-33719-TDS/TPS October 15, 1985 Mr. D. F. Kirsch DER 85-32 Page two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 i

J. G. Haynes j

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza T. D. Shriver D. E. Fowler C. N. Russo J. R. Bynum J. M. Allen D. Canady A. C. Gehr G. A. Hierzer W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde B. T. Parker T. J. Bloom D. N. Stover j

J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

=-

1

.e i

INTERIM REPORT - DER 85-32 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT PVNGS UNIT 2,3 i

I.

Potential Problem 1

The original design intent at building interfaces was that a six inch seismic gap be maintained as indicated on Civil / Structural concrete and steel lay out design drawings to allow unrestricted relative building motions.

In Units 2 and 3 several hundred locations exist where the required s!x inch seismic separation has not been maintained j

between adjacent buildings and/or their attachments (Reference i

SCIP 667.0).

The majority of the structural components with less than the specified six inch separation have previously been identified on FCR's and NCR's.

Unit 1 is being evaluated

)

under EER 85-ZZ-058.

II.

Approach To and Status of Proposed Resolution Bechtel is currently studying this problem to determine reportability, root cause, and technical justification for corrective action.

III.

Projected Completion of Corrective Action 3

and Submittal of the Final Report The complete evaluation and final report are forecast to be completed by November 1, 1985.

I l

_ _. _ _ _ _ - _