Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-85-1844, Responds to Violations Noted in Insp Repts 50-324/85-27 & 50-325/85-27.Corrective Actions:Mechanical Maint Planner/ Analysts Instructed to Use All Available Refs to Assure Correct Spare Bolts Identified + (12:00:23, 12 December 2024)
- B11805, Forwards Reviews of Integrated Safety Assessment Program Topics 1.43 Re Water hammer,1.44 Re Asymmetric Blowdown Loads on Reactor Sys & 1.48 Re Safety Factor for Penetration X-10A + (12:00:24, 12 December 2024)
- ML20134A273 + (12:00:24, 12 December 2024)
- ML20134A271 + (12:00:25, 12 December 2024)
- ML20134A267 + (12:00:26, 12 December 2024)
- ML20134A265 + (12:00:27, 12 December 2024)
- ML20134A263 + (12:00:28, 12 December 2024)
- ML20134A261 + (12:00:29, 12 December 2024)
- ML20134A259 + (12:00:29, 12 December 2024)
- ML20134A256 + (12:00:30, 12 December 2024)
- ML20134A254 + (12:00:31, 12 December 2024)
- ML20134A252 + (12:00:34, 12 December 2024)
- ML20134A247 + (12:00:36, 12 December 2024)
- ML20134A244 + (12:00:37, 12 December 2024)
- IR 05000321/1985027 + (12:00:38, 12 December 2024)
- ML20134A241 + (12:00:38, 12 December 2024)
- ML20134A239 + (12:00:39, 12 December 2024)
- U-600206, Forwards Results of Analysis of Unresolved Item 85016-07 Re Central File Storage Facility Developed During 850726 Exit Meeting.Detailed Schedule for Completion of Corrective Actions Will Be Forwarded by 850815 + (12:00:40, 12 December 2024)
- ML20134A237 + (12:00:40, 12 December 2024)
- ML20134A235 + (12:00:41, 12 December 2024)
- ML20134A233 + (12:00:42, 12 December 2024)
- ML20134A232 + (12:00:42, 12 December 2024)
- ML20134A229 + (12:00:43, 12 December 2024)
- TXX-4527, Submits Results of Study to Verify Proper Coordination & Selective Tripping of Breakers & Fuses Required for Safe Shutdown Circuits & Power Supplies in Response to NRC Question 010.33.Summary of Findings Provided + (12:00:44, 12 December 2024)
- ML20134A228 + (12:00:44, 12 December 2024)
- BSEP-85-1869, Suppls Response to Violations Noted in Insp Repts 50-324/85-19,50-325/85-19,50-324/85-22 & 50-325/85-22. Corrective Actions:Loose/Missing Bolts Investigated & Trouble Tickets Written + (12:00:45, 12 December 2024)
- ST-HL-AE-1422, Forwards Response to Draft Ser/Fsar Items Re Section 3.11 Concerning Environ Design of Mechanical & Electrical Equipment.Encl marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (12:00:46, 12 December 2024)
- ST-HL-AE-1487, Responds to Draft SER or FSAR Item Re Question 430.16N Concerning Breaker Coordination Drawings.Drawings Will Not Be Incorporated in FSAR + (12:00:50, 12 December 2024)
- ML20134A222 + (12:00:50, 12 December 2024)
- ML20134A219 + (12:00:51, 12 December 2024)
- ML20134A217 + (12:00:52, 12 December 2024)
- ML20134A216 + (12:00:52, 12 December 2024)
- ML20134A215 + (12:00:53, 12 December 2024)
- B11814, Forwards Revised Deviation Request from Branch Technical Position Cmeb 9.5-1 Re Auxiliary Bldg - Separation Criteria, Per SER Open Item 14.3 on Safe Shutdown Capability + (12:00:54, 12 December 2024)
- ML20134A212 + (12:00:54, 12 December 2024)
- B11815, Forwards Response to NRC Request for Addl Info on SER Confirmatory Item 58 Re Emergency Diesel Generator Fuel Oil Storage & Transfer Sys + (12:00:55, 12 December 2024)
- ML20134A208 + (12:00:56, 12 December 2024)
- ML20134A205 + (12:00:57, 12 December 2024)
- ML20134A204 + (12:00:57, 12 December 2024)
- ML20134A202 + (12:00:58, 12 December 2024)
- ML20134A200 + (12:00:59, 12 December 2024)
- ML20134A198 + (12:00:59, 12 December 2024)
- ML20134A197 + (12:01:00, 12 December 2024)
- ML20134A196 + (12:01:00, 12 December 2024)
- ML20134A195 + (12:01:02, 12 December 2024)
- ML20134A193 + (12:01:03, 12 December 2024)
- ST-HL-AE-1494, Forwards Response to Draft SER & FSAR Open/Confirmatory Items,Including Item Q430.118N Re ESF Load Sequencer Reliability Analysis.Info Will Be Included in Future FSAR Amend + (12:01:03, 12 December 2024)
- ML20134A189 + (12:01:04, 12 December 2024)
- 05000254/LER-1996-025-01, :on 961220,discovered Original Value for Strainers Head Loss Incorrect.Cause Could Not Be Determined. Training Provided for Operators to Recognize Pump Cavitation During Design Basis Accidents + (12:01:06, 12 December 2024)
- ML20134A186 + (12:01:07, 12 December 2024)
- IR 05000302/1985040 + (12:01:08, 12 December 2024)