Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134J964 + (09:06:06, 12 December 2024)
- ML20134J963 + (09:06:07, 12 December 2024)
- ML20134J960 + (09:06:08, 12 December 2024)
- DD-96-22, Responds to Re Petitions Filed on 960511 & 0614, Per 10CFR2.206.Directors Decision DD-96-22 Sent Under 961211 Cover Ltr + (09:06:09, 12 December 2024)
- ML20134J959 + (09:06:09, 12 December 2024)
- ML20134J955 + (09:06:21, 12 December 2024)
- IR 05000320/1985006 + (09:06:22, 12 December 2024)
- ML20134J950 + (09:06:23, 12 December 2024)
- ML20134J949 + (09:06:27, 12 December 2024)
- 05000325/LER-1985-042, :on 850725,discovered That Procedural Mechanism Did Not Exist to Update Acceptance Test Values in Periodic Test Following Replacement or Relocation of Cells.Caused by Misinterpretation of Testing Requirement + (09:06:30, 12 December 2024)
- ML20134J945 + (09:06:31, 12 December 2024)
- ML20134J941 + (09:06:32, 12 December 2024)
- ML20134J940 + (09:06:33, 12 December 2024)
- 05000317/LER-1997-001, :on 970110,spent Fuel Moved W/Ventilation Sys Inoperable & Missed Surveillance Occurred.Cause Analysis Being Performed to Determined Casual Factors & Generic Implications for Event.Surveillance Performed + (09:06:35, 12 December 2024)
- ML20134J937 + (09:06:36, 12 December 2024)
- ML20134J936 + (09:06:37, 12 December 2024)
- ML20134J934 + (09:06:38, 12 December 2024)
- ML20134J935 + (09:06:38, 12 December 2024)
- ML20134J933 + (09:06:39, 12 December 2024)
- 05000285/LER-1996-008, :on 961011,ventilation Isolation Actuation Signal Occurred.Due to High Containment Activity.Plant Procedures Will Be Reviewed & Revised + (09:06:42, 12 December 2024)
- ML20134J931 + (09:06:43, 12 December 2024)
- IR 05000416/1985022 + (09:06:47, 12 December 2024)
- LIC-96-0178, Requests Termination of RO License for DA Hochstein (Docket 55-40581,license OP-42355) + (09:06:48, 12 December 2024)
- ML20134J927 + (09:06:49, 12 December 2024)
- ML20134J925 + (09:06:50, 12 December 2024)
- ML20134J923 + (09:06:51, 12 December 2024)
- IR 05000616/2007019 + (09:06:52, 12 December 2024)
- ML20134J922 + (09:06:52, 12 December 2024)
- NSD-NRC-97-4975, Forwards AP600 Shutdown Evaluation Rept Outline + (09:06:53, 12 December 2024)
- ML20134J914 + (09:06:55, 12 December 2024)
- ML20134J913 + (09:06:56, 12 December 2024)
- ML20134J912 + (09:06:57, 12 December 2024)
- ML20134J910 + (09:06:58, 12 December 2024)
- ML20134J911 + (09:06:58, 12 December 2024)
- TXX-9700, Forwards Response to Request for Info Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info + (09:06:59, 12 December 2024)
- NSD-NRC-96-4868, Forwards non-proprietary Rev 1 to WCAP-13573 & Proprietary Rev 2 to WCAP-12980, AP600 Passive RHR Heat Exchanger Test Final Rept. Proprietary Rept Withheld (Ref 10CFR2.790) + (09:07:00, 12 December 2024)
- ML20134J905 + (09:07:01, 12 December 2024)
- ML20134J904 + (09:07:02, 12 December 2024)
- IR 05000414/1985028 + (09:07:03, 12 December 2024)
- ML20134J902 + (09:07:04, 12 December 2024)
- NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl + (09:07:05, 12 December 2024)
- BSEP-97-0036, Responds to NRC Re Violations Noted in Insp Repts 50-325/96-16 & 50-324/96-16 on 961027-1207.Corrective Actions:Instrument Rack Related Work Suspended,Esr 96-406 & Site Procedure for Managing Outage Risk Being Revised + (09:07:06, 12 December 2024)
- ML20134J899 + (09:07:06, 12 December 2024)
- ML20134J898 + (09:07:14, 12 December 2024)
- ML20134J895 + (09:07:15, 12 December 2024)
- ML20134J894 + (09:07:16, 12 December 2024)
- ML20134J893 + (09:07:17, 12 December 2024)
- BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station + (09:07:18, 12 December 2024)
- 05000352/LER-1996-023, :on 950403,FPS Surveillance Tests Not Performed.Caused by Personnel Error.Individuals Involved Disciplined & New Supervisor Assigned to Onsite Fire Protection Group + (09:07:20, 12 December 2024)
- ML20134J890 + (09:07:21, 12 December 2024)
- ML20134J889 + (09:07:22, 12 December 2024)
- 05000245/LER-1997-001-02, :on 970110,liquid Radwaste Effluent Radiation Monitor Declared Inoperable Due to Leaking Automatic Isolation Valves.Valves Repaired + (09:07:24, 12 December 2024)