Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134L608 + (08:48:26, 12 December 2024)
- ML20134L607 + (08:48:27, 12 December 2024)
- ML20134L606 + (08:48:27, 12 December 2024)
- ML20134L601 + (08:48:29, 12 December 2024)
- ML20134L597 + (08:48:30, 12 December 2024)
- ML20134L598 + (08:48:30, 12 December 2024)
- ML20134L594 + (08:48:31, 12 December 2024)
- PNO-IV-85-044, on 850827,accident Occurred Between Train & Truck Carrying Dry U Concentrate Approx 100 Miles Northeast of Bismarck,Nd.Matl Spread Over 100 by 200 Ft Area + (08:48:32, 12 December 2024)
- ML20134L590 + (08:48:33, 12 December 2024)
- ML20134L588 + (08:48:34, 12 December 2024)
- B11572, Forwards Addl Info Re 840515 Response to Core Performance Branch Question 492.5,per NRC 840802 Request.Info Resolves SER Open Item 9 Re Operation of Sys Hardware & Implementation of Loose Parts Detection Program + (08:48:41, 12 December 2024)
- ML20134L586 + (08:48:42, 12 December 2024)
- ML20134L585 + (08:48:43, 12 December 2024)
- ML20134L581 + (08:48:44, 12 December 2024)
- ML20134L580 + (08:48:45, 12 December 2024)
- ML20134L579 + (08:48:45, 12 December 2024)
- ML20134L577 + (08:48:46, 12 December 2024)
- ML20134L575 + (08:48:47, 12 December 2024)
- PNO-I-85-062, on 850829,at 100% Power,Reactor Tripped & Safety Injection Occurred.Caused by Broken Pipe Fitting on Instrument Air Compressor Tank in Turbine Bldg.Pressurizer Pressure Restored to Normal + (08:48:47, 12 December 2024)
- ML20134L573 + (08:48:48, 12 December 2024)
- ML20134L570 + (08:48:49, 12 December 2024)
- B11666, Forwards Preliminary Summaries of Public Safety risk- Oriented Analyses of Listed Projects Being Evaluated in Integrated Safety Assessment Program + (08:48:50, 12 December 2024)
- ML20134L569 + (08:48:50, 12 December 2024)
- ML20134L567 + (08:48:52, 12 December 2024)
- ML20134L566 + (08:48:52, 12 December 2024)
- ML20134L565 + (08:48:53, 12 December 2024)
- 05000296/LER-1985-019-02, :on 850725,during Surveillance Testing on Reactor Bldg Ventilation Exhaust Radiation Monitors, Inadvertent Secondary Containment Isolation Occurred.Caused by Improper Volt Meter Hookup Techniques + (08:48:55, 12 December 2024)
- ML20134L562 + (08:48:56, 12 December 2024)
- ML20134L561 + (08:48:57, 12 December 2024)
- ML20134L560 + (08:48:58, 12 December 2024)
- ML20134L559 + (08:48:58, 12 December 2024)
- ML20134L558 + (08:48:59, 12 December 2024)
- ML20134L555 + (08:49:00, 12 December 2024)
- ML20134L557 + (08:49:00, 12 December 2024)
- ML20134L554 + (08:49:01, 12 December 2024)
- ML20134L553 + (08:49:02, 12 December 2024)
- ML20134L551 + (08:49:03, 12 December 2024)
- ML20134L547 + (08:49:04, 12 December 2024)
- ML20134L549 + (08:49:04, 12 December 2024)
- CLI-96-11, Order (CLI-96-11).* Denies Petition for Review Re Es Mcdaniel Challenge to Staff Rejection of Claim Concerning Written Exam to Become RO at Vogtle Electric Generating Plant.W/Certificate of Svc.Served on 961113 + (08:49:05, 12 December 2024)
- ML20134L541 + (08:49:06, 12 December 2024)
- ML20134L540 + (08:49:07, 12 December 2024)
- ML20134L539 + (08:49:07, 12 December 2024)
- ML20134L537 + (08:49:08, 12 December 2024)
- ML20134L536 + (08:49:08, 12 December 2024)
- ML20134L534 + (08:49:09, 12 December 2024)
- ML20134L529 + (08:49:10, 12 December 2024)
- ML20134L528 + (08:49:10, 12 December 2024)
- ML20134L525 + (08:49:11, 12 December 2024)
- 05000287/LER-1985-001-04, :on 850723,reactor Tripped Due to High RCS Pressure.Caused by Erroneous Signal from Failed Integrated Control Sys Module.Module Replaced + (08:49:13, 12 December 2024)
- 05000382/LER-1996-001, :on 951107,TS 3.0.3 Entered Due to SIT Levels Reading High.Caused by Poor Work Practices.Cr Staff Immediately Lowered SIT Levels Until within Specified Range for Compliance W/Tss + (08:49:15, 12 December 2024)