4 UNITED STATES
(
)M, tj NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4001 o
\\ [,,g *
. November 15, 1996 i
ie 5
Mr. David R. Bishop, Chairman Reactor Vessel Head Missile Shield Removal MiniGroup 4
Westinghouse Owners Group Indian Point Station, Unit 2 Broadway and Bleakley Avenues Buchanan, New York 10511
SUBJECT:
WESTINGHOUSE OWNERS GROUP (WOG) MINIGROUP REQUEST FOR MEETING WITH i
NRC TO DISCUSS REMOVAL OF THE REACTOR VESSEL HEAD MISSILE SHIELD (RVHMS) FROM WESTINGHOUSE PLANTS
Dear Mr. Bishop:
l By letter dated August 15, 1996, the WOG RVHMS MiniGroup requested a meeting with the staff to discuss the removal of the RVHMS from Westinghouse plants.
The letter indicates that the WOG RVHMS MiniGroup has prepared preliminary information regarding the technical and licensing justification for deleting the missile shield from Westinghouse plants using the provisions of 10 CFR 50.59. The WOG MiniGroup letter provided a short background of the issue and noted that the justification for removal of the missile shield is based on the results of the AP600 design review that concluded there were no credible sources of missiles within the AP600 containment building.
The provisions of 10 CFR 50.59 allow licensees to make changes to their facility unless there is a change to Technical Specifications or there is an unreviewed safety question.
Each licensee should make a determination whether removal of the RVHMS in their plant is governed by 10 CFR 50.59.
If the l
licensee determines the change can be made under 10 CFR 50.59, the staff has.
the option of reviewing the licensee's determination at a later time.
If an unreviewed safety question is identified by a licensee, the ' change would need prior NRC review and approval.
Should the WOG RVHMS MiniGroup decide that NRC review and approval is necessary before the RVHMS is removed, then a topical should be submitted along with a plant-specific application that indicates an intent to use the proposed generic method. The topical would then be prioritized and reviewed.
We understand that before the RVHMS MiniGroup can make such a decision, there may be benefit in meeting and discussing the proposal.
In order to conserve
'D
%- 167)
- sooo3, NRC MB CENTER COPY 9611210001 961115 PDR PROJ (D -
_,694 PDR
k i
a j
D. Bishop November 15, 1996 limited resources, sufficient additional descriptive information regarding the proposal would need to be developed and provided to the NRC along with indications of licensees' intent to implement the program.
Sincerely, i ft viad i
David B. Matthews, Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management
]
Office of Nuclear Reactor Regulation Project No. 694 i
cc:
See next page 3
i k
1 i
4 4
1 l
D. Bishop November 15,,1996 limited resources, sufficient additional descriptive information regarding the proposal would need to be developed and provided to the NRC alnng with indications of licensees' intent to implement the program.
1 Sincerely, Original Signed By:
David B. Matthews, Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 694 i
cc: See next page DISTRIBUTION:
4 PUBLIC CT,415'JLYiLAS PGEB R/F TMartin RWessman DMatthews FAkstuleweiz CCraig FGrubelich KManoly f'll 1
tt Dockment Name:
P: SHIELD.LTR OFFICE PGEBTl/l SC:PGEB/lv'BC:EM_EB BC:Nb t
NAME CCraig:sw RArchitzel RWe b DMatihews DATE 11/9/96 11/9 /96 11/n$/96 11/l[/96 0FFICIAL RECORD COPY 4
1
%-iG NRC FRE CEPMR COPY
ii 4
1 CC:
Mr. Nicholas J. Liparulo, Manager Regulatory & Engineering Networks Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230-0355 1
)
Mr. Hank Sepp Westinghouse Electric Corporation P.O. Box 355 j
Pittsburgh, PA 15230-0355 j
Mr. Andrew Drake, Project Manager Westinghouse Owners Group
)
Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230-0355 i
i l
1 f
l i
i i
i