Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135B760 + (07:40:04, 12 December 2024)
- ML20135B758 + (07:40:05, 12 December 2024)
- B11662, Forwards Summaries of Public Safety risk-oriented Analyses of Projects Evaluated in Integrated Safety Assessment Program,Per NRC 850731 Request.Projects Include Reactor Water Cleanup Sys Pressure Interlock,Crdr & ATWS + (07:40:06, 12 December 2024)
- ML20135B755 + (07:40:07, 12 December 2024)
- IR 05000277/1985099 + (07:40:09, 12 December 2024)
- ML20135B753 + (07:40:09, 12 December 2024)
- ML20135B752 + (07:40:10, 12 December 2024)
- ML20135B750 + (07:40:11, 12 December 2024)
- ML20135B749 + (07:40:12, 12 December 2024)
- ML20135B748 + (07:40:12, 12 December 2024)
- IR 05000027/1985001 + (07:40:16, 12 December 2024)
- ML20135B746 + (07:40:17, 12 December 2024)
- ML20135B745 + (07:40:18, 12 December 2024)
- ML20135B742 + (07:40:19, 12 December 2024)
- ML20135B739 + (07:40:20, 12 December 2024)
- ML20135B738 + (07:40:20, 12 December 2024)
- ML20135B736 + (07:40:21, 12 December 2024)
- ML20135B735 + (07:40:22, 12 December 2024)
- JAFP-96-0470, Forwards Revised Response to RAI Re Porous Concrete sub-foundation + (07:40:23, 12 December 2024)
- ML20135B731 + (07:40:23, 12 December 2024)
- ML20135B730 + (07:40:24, 12 December 2024)
- IR 05000282/1996014 + (07:40:25, 12 December 2024)
- ML20135B727 + (07:40:26, 12 December 2024)
- ML20135B723 + (07:40:27, 12 December 2024)
- ML20135B721 + (07:40:27, 12 December 2024)
- ML20135B720 + (07:40:28, 12 December 2024)
- ML20135B719 + (07:40:29, 12 December 2024)
- ML20135B718 + (07:40:29, 12 December 2024)
- 05000313/LER-1996-006, :on 960527,EDGs Were Declared Inoperable Due to Excessive Water in Fuel Oil Sys.Drained,Cleaned & Inspected T-25,increased Height of Nozzles in T-25 by Six Inches & Revised Sampling Procedures + (07:40:31, 12 December 2024)
- ML20135B715 + (07:40:32, 12 December 2024)
- ML20135B714 + (07:40:33, 12 December 2024)
- IR 05000341/1996015 + (07:40:34, 12 December 2024)
- 05000368/LER-1996-004-04, :on 961030,potential Failure of Functions of Plant Protective Sys Were Determined During Loss of Power. Cause Indeterminate.Established Administrative Controls to Prevent Channel from Being Bypassed + (07:40:37, 12 December 2024)
- ML20135B711 + (07:40:38, 12 December 2024)
- ML20135B707 + (07:40:39, 12 December 2024)
- 05000414/LER-1996-005-06, :on 961028,determined That Plant May Have Operated in Standby Shutdown Sys Potentially Outside of Design Basis.Caused by Inadequate Sys Design Bases.Placed Vent Valves in Planned Maint Schedule + (07:40:42, 12 December 2024)
- ML20135B705 + (07:40:43, 12 December 2024)
- ML20135B704 + (07:40:44, 12 December 2024)
- ML20135B703 + (07:40:45, 12 December 2024)
- ML20135B702 + (07:40:45, 12 December 2024)
- ML20135B701 + (07:40:47, 12 December 2024)
- B16044, Submits Change in Schedule for Completion of GL 96-01 Actions as Commited to by Util for Plant,Unit 2 in Ltr + (07:40:48, 12 December 2024)
- ML20135B694 + (07:40:49, 12 December 2024)
- ML20135B692 + (07:40:51, 12 December 2024)
- ST-HL-AE-0055, Submits Revs to Valve Relief Requests RR-55,RR-53 Rev 1 & RR-34 Rev 1 for Unit 1 & RR-51,RR-49 Rev 1 & RR-31 Rev 1 for Unit 2 to Use Alternate Testing Frequency in Assessing Operational Readiness.W/Three Oversize Drawings + (07:40:52, 12 December 2024)
- 05000336/LER-1985-004, :on 850314,sufficient Tubes in Each Steam Generator Had Flaws Greater than 40% through-wall to Place Steam Generators in Category C.3 of Tech Spec Table 4.4-6. Sludge Lancing & Chemical Cleaning Initiated + (07:40:55, 12 December 2024)
- ML20135B689 + (07:40:56, 12 December 2024)
- ML20135B688 + (07:40:57, 12 December 2024)
- ML20135B686 + (07:40:57, 12 December 2024)
- ML20135B685 + (07:40:58, 12 December 2024)
- ML20135B682 + (07:41:00, 12 December 2024)