ML20135B707

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204- 06 & NOV
ML20135B707
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 02/25/1997
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20135B710 List:
References
NUDOCS 9703030172
Download: ML20135B707 (5)


See also: IR 05000344/1997001

Text

a

- /\

U g e M 4,4 UNITED sT ATES

, / ,

  • .

NUCLEAR REGULATORY COMMISSION

,,

<

REGloN IV

611 RYAN PLAZA DRIVE, SUITE 400

'

%, . AR LINGToN, TEXAS 760118064

February 25, 1997

Stephen M. Quennoz, Acting Vice

President and Chief Nuclear Officer

Portland General Electric Company

Trojan Nuclear Plant

71760 Columbia River Highway

Rainier, Oregon 97048

SUBJECT: NRC INSPECTION REPORT 50-344/97-01;72-17/97-01 AND NOTICE OF

VIOLATION

Dear Mr. Quennoz:

An NRC inspection was :onducted February 4-6,1997, at your Trojan Nuclear Plant. The

enclosed report presents tha scope and results of that inspection.

The inspection covered the work in progress at Trojan related to the decommissioning and

dismantlement of the facility. Areas reviewed during this inspection included radiation

protection, operations involving your inspection of spent fuel, maintenance of fuel handling

equipment, compliance with the Technical Specifications, and Quality Assurance Program

implementation. Activities at Trojan appeared to be progressing safely.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice)

and the circumstances surrounding this Technical Specification violation are described in

detail in the enclosed report. Your efforts to investigate the missed Technical Specification

audit, determine why this violation occurred, and implement corrective actions were

prompt and effective.

The NRC has concluded that the information regarding the reason for the violation, the

corrective actions taken and planned to correct the violation and to prevent a recurrence,

and the date when full compliance was achieved is already adequately addressed in the

enclosed inspection report. Therefore, you are not required to respond to this letter unless

the description therein does not accurately reflect your corrective actions or your position.

In that case, or if you choose to provide additional information, you should follow the

instructions specified in the enclosed Notice.

In accoroance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its er. closure will be placed in the NRC Public Document Room.

I

l

9703030172 970225

PDR ADOCK 05000344

O PDR

,#. a3 .,

g q

'

l

'

l

. i

Portland General Electric -2-

Company

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

Ross A. Scarano, Director l

Division of Nuclear Material Safety l

Docket No.: 50-344;72-17

License No.: NPF-1

Enclosure:

NRC Inspection Report

50-344/97-01;72-17/97-01

cc w/ enclosure:

H. Ray Pate, Manager Licensing i

Compliance and Commitment Management

Portland General Electric Company  !

Trojan Nuclear Plant  !

71760 Columbia River Highway

Rainier, Oregon 97048

Chairman

Board of County Commissioners

Columbia County

St. Helens, Oregon 97501

Mr. David Stewart-Smith

Oregon Department of Energy

625 Marion Street NE

Salem, Oregon 97310

Mr. Lloyd K. Marbet

19142 S.E. Bakers Ferry Road

l

Boring, Oregon 97009

l

l Mr. Jerry Wilson

Do it Yourself Committee

570 N.E. 53rd

Hillsboro, Oregon 97124

.. . . _ . , -. .. _ - . . . . - . . - . . . - . _ .

.

.

Portland General Electric -3-

Company

Mr. Eugene Roselie

Northwest Environment Advocates

133 S.W. 2nd Avenue

Portland, Oregon 97204

,

i

r

!

1

l

1

I

!

l

l

l

l

l

I

'

,

l

l

1

1

. ~ . - . . ~ . . . - _ = -- . . - - ~ . - - _ . - - . _

l.

.

Portland General Electric -4-

! Company

1.

E-Mail report to Document Control Desk (DOCDESK)

L bec to DMB (IE01)

bec distrib. by RIV:

RIV Regional Administrator

MTMasnik, NRR/PDND (11 B20)

LHThinus, NRR/PDND (11820)

'

PLEng, NMSS/SFPO (06F1)

SHWeiss, NRR/PDND (11 B20)

DWeiss, OC/LFDCB (4503)

DGReid, NMSS/SFPO (6F18)

GHMarcus, NRR/DRPW/PD111-3 (13E21)

WDReckley, NRR/DRPW/PD111-3

VLTharpe, NMSS/SFPO (06G22)

'CLCain, DNMS/TA  ;

'DBSpitzberg, DNMS/NMLB

'LCCarson, DNMS/NMLB

l i

'JVEverett, DNMS/NMLB

FAWenslawski, WCFO

  • NMLB (2)-Sth floor (Hodges)

' MIS System  !

  • RIV Files (2)- 4th floor file room (Part 50 Docket)

'W/lFS Form i

l

'

!

l I

i

!

l

l

l

DOCUMENT NAME: G:\FCDB.O\LCC\TNP701 RP.LCC

<

[

DNMS:NMLB I,, NRR:PDND y C:DNMS:NMLB ADD:DNMpO:DW

!

LCCarsonll:nh /"A MTMasnik Pfi DBSpitzberg JC CLC g RAScarano

) 02/4/97 02/rJ97 tv- 02/3/97 027 /97 02J/97

I OFFICIAL RECORD COPY

;r .

1 C *% S!l Y2S/ff

f

._ _

. . _ - x - . _

.- . - . - . - -_ _.

-

x

Portland General Electric -4-

Company

E-Mail report to Document Control Desk (DOCDESK)

bec to DMB (IE01)

bec distrib. by RIV:

RIV Regional Administrator

MTMasnik, NRR/PDND (11 B20)

LHThonus, NRR/PDND (11 B20)

PLEng, NMSS/SFPO (06F1)

SHWeiss, NRR/PDND (11820)

DWeiss, OC/LFDCB (4503)

DGReid, NMSS/SFPO (6F18)

GHMarcus, NRR/DRPW/PD111-3 (13E21)

WDReckley, NRR/DRPW/PD111-3

VLTharpe, NMSS/SFPO (06G22)

  • CLCain, DNMS/TA
  • DBSpitzberg, DNMS/NMLB
  • LCCarson, DNMS/NMLB

'JVEverett, DNMS/NMLB

FAWenslawski, WCFO

  • NMLB (2)-5th floor (Hodges)
  • MIS System
  • RIV Files (2)- 4th floor file room (Part 50 Docket)

"W/lFS Form

DOCUMENT NAME: G:\FCDB.0\LCC\TNP701 RP.LCC

DNMS:NMLB (1 NRR:PDND * C:DNMS:NMLB ADD:DNMpf):DW

LCCarsonll:nh /* MTMasnik MF DBSpitzberg 76 CLC g RAScarano

02t#/97 02/W97 fy 02/4/97 027 /97 02ff97

OFFICIAL RECORD COPY

C m ell t-/2S/f7

,

L

,s