Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135D683 + (07:19:47, 12 December 2024)
- ML20135D682 + (07:19:48, 12 December 2024)
- ML20135D678 + (07:19:49, 12 December 2024)
- 05000423/LER-1996-044-01, :on 961108,qualification of Containment Sys Noted Following Design Basis Accident.Determined That Fwa Sys Was Not Rated at Containment Design Temp of 280 Degrees. Design Review of Fwa Sys Will Be Performed Prior to Entry + (07:19:50, 12 December 2024)
- ML20135D676 + (07:19:52, 12 December 2024)
- ML20135D671 + (07:19:53, 12 December 2024)
- ML20135D669 + (07:19:54, 12 December 2024)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl + (07:19:55, 12 December 2024)
- ML20135D661 + (07:19:55, 12 December 2024)
- PNO-I-96-087, on 961206,reactor Was Manually Scramed Due to EHC Oil Leak at Turbine Control Valve 2.Licensee Implemented One Wk Maint Outage to Repair EHC Pressure Switch & Several Other Balance of Plant & Drywell Items + (07:19:56, 12 December 2024)
- ML20135D658 + (07:19:57, 12 December 2024)
- ML20135D650 + (07:19:58, 12 December 2024)
- ML20135D645 + (07:19:59, 12 December 2024)
- ML20135D643 + (07:20:00, 12 December 2024)
- ML20135D639 + (07:20:01, 12 December 2024)
- ML20135D635 + (07:20:02, 12 December 2024)
- ML20135D634 + (07:20:02, 12 December 2024)
- 05000312/LER-1984-020, :on 840703,tube Leak Experienced in once- Through Steam Generator B.During Cooldown,Unplanned Reactor Trip Occurred on Low RCS Pressure.Caused by Through Wall Defect at 15th Tube Support Plate + (07:20:05, 12 December 2024)
- ML20135D630 + (07:20:06, 12 December 2024)
- ML20135D626 + (07:20:07, 12 December 2024)
- ML20135D628 + (07:20:07, 12 December 2024)
- ST-HL-AE-5519, Forwards Change to Operations QA Plan (QA-030) Per 10CFR50.54(a) + (07:20:08, 12 December 2024)
- IR 05000416/1985016 + (07:20:33, 12 December 2024)
- ML20135D620 + (07:20:34, 12 December 2024)
- ML20135D618 + (07:20:35, 12 December 2024)
- BSEP-96-0343, Application for Amends to Licenses DPR-71 & DPR-62,changing Method of Detecting Reactivity Anomalies as Well as Editorial Changes to Bases for TS 3/4.1.2 + (07:20:36, 12 December 2024)
- ML20135D609 + (07:20:37, 12 December 2024)
- ML20135D606 + (07:20:38, 12 December 2024)
- ML20135D608 + (07:20:38, 12 December 2024)
- 05000263/LER-1984-025, :on 840715,while Isolating Bus 16 for Relay Maint,Emergency Diesel Generator 11 Started When Operator Opened Bus Potential Transformer Door on Rear of Cubicle 152-610 Rather than 152-601 + (07:20:40, 12 December 2024)
- 05000361/LER-1984-008-02, :on 840211,inadvertent Entry Into Mode 3 Occurred.Caused by Failure of Plant Monitoring Sys (PMS) Due to Incorrect RCS Temp Display.Pms Display Repaired & Returned to Svc + (07:20:42, 12 December 2024)
- ML20135D592 + (07:20:44, 12 December 2024)
- ML20135D593 + (07:20:44, 12 December 2024)
- ML20135D589 + (07:20:45, 12 December 2024)
- 05000361/LER-1984-010-02, :on 840223,reactor Power Surge Occurred Due to Partial Loss of Extraction Steam Feedwater Heating.Caused by Spurious Cycle of First Point Level Controller Resulting in High Levels in Point Heaters + (07:20:47, 12 December 2024)
- ML20135D584 + (07:20:48, 12 December 2024)
- ML20135D583 + (07:20:49, 12 December 2024)
- VPN-075-96, Forwards ISFSI Construction Schedule + (07:20:50, 12 December 2024)
- 05000338/LER-1984-012-03, :on 840925,Fuel Cycle 5 Moderator Temp Coefficient Determined More Positive than Tech Specs Allow. Interim Control Rod Withdrawal Limits Implemented + (07:20:53, 12 December 2024)
- ML20135D576 + (07:20:54, 12 December 2024)
- ML20135D573 + (07:20:55, 12 December 2024)
- ML20135D571 + (07:20:56, 12 December 2024)
- ML20135D567 + (07:20:57, 12 December 2024)
- 05000324/LER-1984-017-01, :on 841130,Group 3 Primary Isolation Occurred Due to Erroneous Reactor Water Cleanup Sys Area High Temp Signal.High Temp Signal Caused by Component Breakdown in Instrument Module N600F.Module Replaced + (07:20:58, 12 December 2024)
- ML20135D560 + (07:20:59, 12 December 2024)
- ML20135D557 + (07:21:00, 12 December 2024)
- 05000263/LER-1984-027, :on 840912,while Pulling Wires Into Substation Panel,Large Cable Jarred Adjacent Panel & Tripped 345 Kv Bus Differential Relays,Deenergizing Source for Auxiliary Reserve Transformer,Resulting in Autostart + (07:21:02, 12 December 2024)
- ML20135D548 + (07:21:04, 12 December 2024)
- ML20135D543 + (07:21:05, 12 December 2024)
- ML20135D542 + (07:21:05, 12 December 2024)
- ML20135D539 + (07:21:06, 12 December 2024)