Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135E489 + (07:10:04, 12 December 2024)
- ML20135E485 + (07:10:05, 12 December 2024)
- ML20135E484 + (07:10:06, 12 December 2024)
- ML20135E483 + (07:10:06, 12 December 2024)
- ML20135E482 + (07:10:07, 12 December 2024)
- ML20135E481 + (07:10:08, 12 December 2024)
- IR 05000443/1985022 + (07:10:09, 12 December 2024)
- ML20135E478 + (07:10:10, 12 December 2024)
- ML20135E477 + (07:10:11, 12 December 2024)
- 05000373/LER-1996-017-04, :on 961106,main CR Found Outside of Design Basis Due to Inadequate TS Surveillance Procedure.Caused by Failure to Fully Implement Design Basis Requirements. Required Tests,Analysis & Mods Implemented + (07:10:12, 12 December 2024)
- ML20135E473 + (07:10:13, 12 December 2024)
- ML20135E472 + (07:10:14, 12 December 2024)
- ML20135E471 + (07:10:14, 12 December 2024)
- 2CAN029712, Provides Annual Diesel Generator Data Rept for CY96 + (07:10:15, 12 December 2024)
- ML20135E468 + (07:10:16, 12 December 2024)
- ML20135E465 + (07:10:19, 12 December 2024)
- ML20135E466 + (07:10:19, 12 December 2024)
- ML20135E463 + (07:10:20, 12 December 2024)
- ML20135E462 + (07:10:21, 12 December 2024)
- ML20135E459 + (07:10:22, 12 December 2024)
- ML20135E461 + (07:10:22, 12 December 2024)
- ML20135E457 + (07:10:23, 12 December 2024)
- NSD-NRC-96-4888, Forwards Response to RAI Re SSAR Section 3.2 Open Items + (07:10:24, 12 December 2024)
- ML20135E453 + (07:10:30, 12 December 2024)
- ML20135E452 + (07:10:31, 12 December 2024)
- DD-85-11, Advises That Time within Which Commission May Act to Renew Directors Decision DD-85-11 Expired.Commission Declined Any Review & Decision Became Final Agency Action on 850911. Served on 850913 + (07:10:32, 12 December 2024)
- ML20135E447 + (07:10:35, 12 December 2024)
- ML20135E446 + (07:10:35, 12 December 2024)
- ML20135E445 + (07:10:36, 12 December 2024)
- ML20135E444 + (07:10:37, 12 December 2024)
- ML20135E443 + (07:10:38, 12 December 2024)
- PNO-IV-96-064A, on 961205,reactive Insp Initiated to Review Circumstances Associated W/Malfuntion of Licensee Theratron 780 Teletherapy Unit.Licensee Representatives Reported, Continued to Treat Patients After Problem Observed + (07:10:38, 12 December 2024)
- ML20135E440 + (07:10:39, 12 December 2024)
- ML20135E438 + (07:10:40, 12 December 2024)
- ML20135E437 + (07:10:41, 12 December 2024)
- ML20135E436 + (07:10:42, 12 December 2024)
- 05000364/LER-1996-003-01, :on 961030,determined That More than 1% of Inservice Tubes in Each SG During Eleventh Cycle Found Defective.Caused by Roll Transition Degradation,Sludge Zone Degradation & Free Span Degradation + (07:10:43, 12 December 2024)
- ML20135E433 + (07:10:45, 12 December 2024)
- ML20135E434 + (07:10:45, 12 December 2024)
- PNO-I-96-086, on 961205,plant Engineers Identified Three Inadequate Cable Seperation Issues Affecting Reactor Protection Sys.Both Buttons of Either Pair of Trip Push Buttons Required to Be Depressed,To Initiate Manual Trip + (07:10:46, 12 December 2024)
- ML20135E430 + (07:10:48, 12 December 2024)
- RBG-21-915, Responds to Violation Noted in Insp Rept 50-458/85-43 on 850501-0615.Disagrees That Violation Re Failure to Obtain Approval of QA Program Change Occurred.Qa Program on 2-yr Review Basis Effective 830311.No Subsequent Mods to Program + (07:10:48, 12 December 2024)
- NSD-NRC-97-5003, Forwards Three Copies of W Response to Open Items on AP600 Topics + (07:10:49, 12 December 2024)
- ML20135E427 + (07:10:50, 12 December 2024)
- ML20135E426 + (07:10:50, 12 December 2024)
- ML20135E425 + (07:10:51, 12 December 2024)
- NG-96-2574, Responds to 961118 Telcon RAI Re Inservice Insp Relief Requests NDE-020 & NDE-R011.Ultrasonic Calibr Data,Provided + (07:10:52, 12 December 2024)
- ML20135E422 + (07:10:53, 12 December 2024)
- ML20135E423 + (07:10:53, 12 December 2024)
- PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference + (07:10:54, 12 December 2024)
- IR 05000458/1985043 + (07:10:55, 12 December 2024)
- NSD-NRC-96-4893, Forwards Proprietary Version of AP600 Basemat Design Summary Rept of Extensive Calculation Completed to Document Conformance of Basemat Design Criteria + (07:10:59, 12 December 2024)