Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135F169 + (07:03:55, 12 December 2024)
- NPL-97-0073, Submits Documentation for NRC Review to Support Restart Issues as Identified on Unit 2 Startup Commitment List as Result from Discussions Conducted at 970131 NRC Wi Electric Senior Mgt Meeting + (07:03:56, 12 December 2024)
- RBG-22-002, Final Deficiency Rept DR-314 Re Leakage of Fluid Fyrguel from Pump Seals to Borg-Warner Pump Drive Motor Operators for Copes-Vulcan Valves.Initially Reported on 850718.Next Rept by 850916 + (07:03:57, 12 December 2024)
- ML20135F166 + (07:03:58, 12 December 2024)
- PNO-V-85-057, on 850912,turbine & Reactor Trip Occurred. Caused by Fire in Main Turbine Exciter Encl.Fire Extinguished.All Reactor Shutdown Sys Operated Satisfactorily.Cause of Fire Being Investigated + (07:03:58, 12 December 2024)
- ML20135F164 + (07:03:59, 12 December 2024)
- ML20135F163 + (07:03:59, 12 December 2024)
- ML20135F160 + (07:04:00, 12 December 2024)
- ML20135F159 + (07:04:01, 12 December 2024)
- ML20135F154 + (07:04:02, 12 December 2024)
- ML20135F157 + (07:04:02, 12 December 2024)
- ML20135F151 + (07:04:03, 12 December 2024)
- ML20135F153 + (07:04:03, 12 December 2024)
- ML20135F150 + (07:04:04, 12 December 2024)
- ML20135F149 + (07:04:05, 12 December 2024)
- ML20135F148 + (07:04:05, 12 December 2024)
- ML20135F147 + (07:04:06, 12 December 2024)
- ML20135F146 + (07:04:06, 12 December 2024)
- ML20135F144 + (07:04:07, 12 December 2024)
- ML20135F145 + (07:04:07, 12 December 2024)
- ML20135F143 + (07:04:08, 12 December 2024)
- ML20135F141 + (07:04:09, 12 December 2024)
- ML20135F142 + (07:04:09, 12 December 2024)
- PY-CEI-NRR-0338, Informs That Simulated Loss of Ac Power Tests Poses Undue Risk of Damage to Plant Equipment Due to High Temp in Drywell,In Response to Generic Ltr 83-24.Test Will Not Be Conducted + (07:04:11, 12 December 2024)
- ML20135F139 + (07:04:11, 12 December 2024)
- ML20135F137 + (07:04:12, 12 December 2024)
- ML20135F135 + (07:04:13, 12 December 2024)
- ML20135F136 + (07:04:13, 12 December 2024)
- DCL-85-282, Potential Part 21 Problem Re Pipe Clamps Mfg by Natl Valve & Mfg Co Reported to NRC on 850620 by Pacific Scientific Co. Facility Unaffected.No Class 1 Pipe Clamps Mfg by Natl Valve & Mfg Co Used + (07:04:14, 12 December 2024)
- ML20135F134 + (07:04:14, 12 December 2024)
- ML20135F131 + (07:04:15, 12 December 2024)
- ML20135F129 + (07:04:17, 12 December 2024)
- ML20135F130 + (07:04:17, 12 December 2024)
- ML20135F128 + (07:04:18, 12 December 2024)
- ML20135F125 + (07:04:19, 12 December 2024)
- ML20135F126 + (07:04:19, 12 December 2024)
- ML20135F123 + (07:04:20, 12 December 2024)
- ML20135F122 + (07:04:20, 12 December 2024)
- ML20135F121 + (07:04:21, 12 December 2024)
- ML20135F120 + (07:04:22, 12 December 2024)
- ML20135F119 + (07:04:23, 12 December 2024)
- ML20135F118 + (07:04:24, 12 December 2024)
- AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line + (07:04:25, 12 December 2024)
- ML20135F117 + (07:04:25, 12 December 2024)
- ML20135F112 + (07:04:26, 12 December 2024)
- ML20135F110 + (07:04:27, 12 December 2024)
- ML20135F111 + (07:04:27, 12 December 2024)
- ML20135F108 + (07:04:28, 12 December 2024)
- ML20135F109 + (07:04:28, 12 December 2024)
- ML20135F106 + (07:04:29, 12 December 2024)
- ML20135F104 + (07:04:30, 12 December 2024)