Forwards Insp Rept 50-289/96-07 on 960929-1118 & Notice of Violation
ML20135F137
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/06/1996
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: James Knubel
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20135F140 List:
References
NUDOCS 9612120380
Download: ML20135F137 (2)


See also: IR 05000289/1996007

Text

,

,

.

.

l

December 6, 1996

Mr. James Knubel

Vice President and Director, TMI

GPU Nuclear Corporation

Three Mile Island Nuclear Station

Post Office Box 480

Middletown, PA 17057-0191

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-289/96-07 AND NOTICE

OF VIOLATION

Dear Mr. Knubel:

On November 18,1996, the NRC completed an inspection at your Three Mile Island 1

reactor facility. The enclosed report presents the results of that inspection.

The security program was reviewed during this period. The inspection consisted of

selective reviews of procedures and records, inspector observations, and interviewc with

security personnel. No safety concerns or violations were identified in the security area.

The inspector determined that you are implementing a security program that effectively

protects public health and safety.

A violation for improper control of scaffold program requirements for safety related

equipment is cited in the enclosed Notice of Violation, and the circumstances surrounding

the violation are described in detailin the enclosed report. This is a repeat problem that

,

was not cited for the prior occurrence. Your continued reinforcement of the scaffold

l

program requirements is warranted to ensure that safety related equipment remains

available to perform its design function. Please note that you are required to respond to

this letter and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine whether

further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

Original Signed By:

l

Peter W. Eselgroth, Chief

j

l

Projects Branch No. 7

J

Division of Reactor Projects

A

,

Docket No.: 50-289

'

'

License No.: DPR-50

t

ff

'

l

96121203eo 961206

PDR

ADOCK 05000289

,

c

PDR

'

..

.

_

=

-

.- .

--

-.

.

.

. . .

... .

.

/

1

'

l

Mr. James Knubel

2

Enclosures:

1. Notice of Violation.

2. NRC Inspection Report No. 50-289/96-07

cc w/ encl:

E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)

Commonwealth of Pennsylvania

J. C. Fornicola, Director, Licensing and Regulatory Affairs

M. J. Ross, Director, Operations and Maintenance

TMI-Alert (TMIA)

'

J. S. Wetmore, Manager, TMl Regulatory Affairs

Distribution w/ encl:

Region i Docket Room (with concurrences)

NRC Resident inspector

Nuclear Safety Information Center (NSIC)

PUBLIC

T. Kenny,DRS

P. Eselgroth, DRP

D. Havercamp, DRP

C. O'Daniell, DRP

D. Screnci, PAO

Distribution w/enci (VIA E-MAIL):

W. Dean, OEDO

J. Norris, PD l-4, NRR

J. Stolz, PD l-4, NRR

R. Correia, NRR

R. Frahm, Jr., NRR

Inspection Program Branch, NRR (IPAS)

i

DOCUMENT NAME: G:\\ BRANCH 7\\TMi\\lR9607.TMI

To receive a copy of this document. Indicate in the box: 'C" = Copy without attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP,

6

/

/

l

NAME

PEfe)pphy

DATE

12/CWlGB

12/ /96

12/ /96

12/ /96

12/ /96

l

OFFICIAL RECORD COPY

l

!

!

l