|
---|
Category:NOTICE OF DEVIATION/NONCONFORMANCE FROM A REGULATORY
MONTHYEARML20135F1091972-09-0707 September 1972 Description of Noncompliance Items from Insp on 720626-28. Noncompliance Noted:Measurements of Secondary Coolant Ph Recorded During 710713-23 Exceeded Tech Spec Range of 7.6 to 8.2 1972-09-07
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000193/19992011999-04-0707 April 1999 Insp Rept 50-193/99-201 on 990322-26.No Violations Noted. Major Areas Inspected:Licensee Programs Re Operations,Health Physics & Security IR 05000193/19982021998-10-13013 October 1998 Insp Rept 50-193/98-202 on 980921-25.No Violations Noted. Major Areas Inspected:Various Aspects of Licensee Programs Re Conduct of Operations & Emergency Preparedness as Relating to Licensee 2 MW Class 1 Research Reactor IR 05000193/19982011998-02-13013 February 1998 Insp Rept 50-193/98-201 on 980113-15.No Violations Noted. Major Areas Inspected:Protection of Public Safety ML20148J8441997-06-0707 June 1997 NRC Operator Licensing Exam Rept 50-193/OL-97-01 & Answer Key & Results for Tests Administered on 970528-29 IR 05000193/19970011997-04-23023 April 1997 Insp Rept 50-193/97-01 on 970311-14.No Violations Noted. Major Areas Inspected:Component Upgrades for 5 Megawatt Operation,Operability Tests & Drawing Updates,Vacant Reactor Supervisor Position & Action on Previous Findings IR 05000193/19930041993-12-0707 December 1993 Insp Rept 50-193/93-04 on 931116-18.No Violations Noted. Major Areas Inspected:Facility Operation,Shipping & Receiving,Storage & Internal Controls,Inventory,Records & Reports IR 05000193/19930031993-09-16016 September 1993 Insp Rept 50-193/93-03 on 930810-18.No Violations Noted. Major Areas Inspected:Surveill,Fuel Shipping & Receipt,Fuel Loading & Initial Criticality IR 05000193/19930021993-03-11011 March 1993 Insp Rept 50-193/93-02 on 930223-25.No Violations Noted. Major Areas Inspected:Facility Staffing,Radiation Postings, Radiation Worker Training,Routine Surveys,Portable Survey & Counting Lab Equipment,Calibrations & Personnel Dosimetry IR 05000193/19930011993-02-0404 February 1993 Safeguards Insp Rept 50-193/93-01 on 930119-22.No Violations Noted.Major Areas Inspected:Physical Security & Transportation of Irradiated Reactor Fuel Including Organization & Operation IR 05000193/19900011990-11-0909 November 1990 Insp Rept 50-193/90-01 on 901001-03.No Violations Noted. Major Areas Inspected:Staffing,Organization,Operational Safety,Control Room Activities,Licensee Events & Maint IR 05000193/19880031988-09-27027 September 1988 Insp Rept 50-193/88-03 on 880826.No Emergency Preparedness Violations Identified.Major Areas Inspected:Emergency Preparedness IR 05000193/19880021988-07-21021 July 1988 Insp Rept 50-193/88-02 on 880622-23.No Violations Noted. Major Areas Inspected:Radiation Protection Program Including Status of Previously Identified Items,Training & Qualification & Implementation of Radiation Program ML20154D0591988-05-11011 May 1988 Notice of Violation from Insp on 880328-31.Violation Noted: Required Fission Density Calculation Not Completed Between 860930 & 870213 or Between 871027 & 880224 IR 05000193/19880011988-05-10010 May 1988 Insp Rept 50-193/88-01 on 880328-31.Violation Noted.Major Areas Inspected:Facility Tour,Action Taken on Previous Insp Findings,Facility Operation,Tech Specs & Surveillance, Requalification Training,Experiments & Health Physics IR 05000193/19870011987-12-14014 December 1987 Exam Rept 50-193/87-01OL on 871020-21.Exam Results:One Senior Reactor Operator Candidate Passed Written & Operating Exams & License Issued IR 05000193/19860031986-08-21021 August 1986 Insp Rept 50-193/86-03 on 860724.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Status of Previously Identified Items,Training & Qualifications & External Exposure Controls IR 05000193/19860021986-04-23023 April 1986 Insp Rept 50-193/86-02 on 860224-25.No Violation Noted. Major Areas Inspected:Facility Tour,Action Taken on Previous Insp Findings,Requalification Training,Experiments,Health Physics & Emergency Planning IR 05000193/19860011986-02-19019 February 1986 Insp Rept 50-193/86-01 on 860127.No Violation Noted.Major Areas Inspected:Irradiated Reactor Fuel Shipment at Point of Origin & While Enroute Through States of Ri & CT IR 05000193/19850031985-09-0505 September 1985 Physical Security Insp Rept 50-193/85-03 on 850701 & 02. Licensee in Compliance.Major Areas Inspected:Protection Measures for SNM of Moderate Strategic Significance.Portions Deleted (Ref 10CFR2.790) ML20134F3331985-08-12012 August 1985 Notice of Violation from Insp on 850611-12 ML20134F3471985-08-12012 August 1985 Insp Rept 50-193/85-02 on 850611-12.Violation Noted:Failure to Maintain Documentation of Test Certification for Reactor Bldg Cleanup Sys High Efficiency Particulate Filters IR 05000193/19850011985-06-0303 June 1985 Exam Rept 50-193/85-01 on 850424.Exam Results:One Candidate Passed IR 05000193/19820011982-06-0303 June 1982 IE Insp Rept 50-193/82-01 on 820513.No Noncompliance Noted. Major Areas Inspected:Organization,Operations,Storage & Internal Control,Records & Repts.Details Withheld (Ref 10CFR2.790) ML20135F1091972-09-0707 September 1972 Description of Noncompliance Items from Insp on 720626-28. Noncompliance Noted:Measurements of Secondary Coolant Ph Recorded During 710713-23 Exceeded Tech Spec Range of 7.6 to 8.2 1999-04-07
[Table view] |
Text
. s
' - ~.
UNITED STATES
.p ATOMIC ENERGY COMMISSION DI R ,' ^ 4TE OF REGULATONY OPER AT80006
[ ,* ,etosops s
( ' *
~
N6.s AMK, NEW JERSEY s73 s1 ,
n, SEP 7 1972 -
1 Rhode Island Atomic Energy Commission Docket No. 50-193 Attention: Dr. A L. Quirk, Chairman Rhode Island Nuclear Science Center Narragansett, Rhode Island 02882 Centlemen:
This refers to the inspection conducted by Mr. K. E. Plumlee and Mr. E. R.
Loibl, of this office on June 26, 27, and 28, 1972, of operations authorized by AEC Licensa No. R-95, and to the discussions of our findings held by Mr. Loib1 and Mr. Plumlee with Dr. Quirk and Mr. DiMeglio of your staff at the conclusion of the inspection.
Areas examined during this inspection included (for the period June 1971 to June 1972) reactor operation logs, records of fuel management, sample irrad-istions, personnel exposures to radiation, area health physics surveys, radioact'ive releases to the environment', and audits of operations; and the status of operating procedures, emergency procedures and facility security
! measures. Within these areas, the inspection consisted of selective exam-inations of procedures and representative records, interviews with facility personnel, and observations by our inspectors.
During this inspection it was found that certain of your activities appeared to be in noncompliance with AEC requirements. The items and references to
<the pertinent requirements are listed in the enclosure to this letter. Please provide us within 20 days, in writing, with your comments concerning these items, any steps which have been or will be taken to correct them, any steps that have been or will be taken to prevent recurrence, and the date all corrective actions or preventive measures were or will be completed.
Should you have any questions concerning this inspection, we will be plassed to discuss them with you.
Sincerely yours, mes .O P. O'Reilly Dir ctor Enclosure Description,of Noncompliance Items
91{0g $ 3 ,,
O ,
_ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . . . .