Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136B738 + (06:24:59, 12 December 2024)
- ML20136B737 + (06:25:00, 12 December 2024)
- ML20136B735 + (06:25:00, 12 December 2024)
- ML20136B734 + (06:25:01, 12 December 2024)
- B16293, Annual Rept Jan-Dec 1996 + (06:25:02, 12 December 2024)
- ML20136B731 + (06:25:03, 12 December 2024)
- 05000259/LER-1979-016-03, /03L-0:on 790804,during Normal Operation,Starter Bus 1B Normal Feeder Breaker Found Discharged,Making Breaker Inoperable for Closure.Caused by Damaged Breaker Spring Charging Motor Commutator.Motor Replaced + (06:25:05, 12 December 2024)
- ML20136B726 + (06:25:07, 12 December 2024)
- ML20136B728 + (06:25:07, 12 December 2024)
- ML20136B724 + (06:25:08, 12 December 2024)
- 05000259/LER-1979-016, Forwards LER 79-016/03L-0 + (06:25:08, 12 December 2024)
- ML20136B722 + (06:25:09, 12 December 2024)
- ML20136B721 + (06:25:10, 12 December 2024)
- ML20136B717 + (06:25:11, 12 December 2024)
- ML20136B718 + (06:25:11, 12 December 2024)
- ML20136B716 + (06:25:12, 12 December 2024)
- ML20136B715 + (06:25:13, 12 December 2024)
- ML20136B712 + (06:25:13, 12 December 2024)
- ML20136B710 + (06:25:14, 12 December 2024)
- ML20136B709 + (06:25:15, 12 December 2024)
- ML20136B706 + (06:25:15, 12 December 2024)
- ML20136B705 + (06:25:17, 12 December 2024)
- ML20136B702 + (06:25:18, 12 December 2024)
- ST-HL-AE-5587, Forwards Response to Request for Addl Info Re Steam Generator Tube Voltage-Based Repair Criteria 90-day Rept + (06:25:18, 12 December 2024)
- ML20136B701 + (06:25:19, 12 December 2024)
- ML20136B698 + (06:25:20, 12 December 2024)
- JPN-97-009, Forwards ISI Summary Rept for JAFNPP Which Provides Summary of ISI Exams Conducted During 1996 Refuel Outage & Info Re Operating Status of Feedwater Nozzle Leakage Monitoring Sys & Measured Leakage for Feedwater Nozzles + (06:25:21, 12 December 2024)
- ML20136B688 + (06:25:22, 12 December 2024)
- ML20136B694 + (06:25:22, 12 December 2024)
- ML20136B686 + (06:25:23, 12 December 2024)
- ML20136B684 + (06:25:24, 12 December 2024)
- ML20136B685 + (06:25:24, 12 December 2024)
- 05000338/LER-1985-021-01, :on 851122,health Physics Supervisor Realized Clarifier Demineralizer Out of Svc When Tech Spec 3.11.1.3 Required Sys to Be in Svc.Evaluation of Methods to Increase Cesium Removal Capabilities Initiated + (06:25:26, 12 December 2024)
- ML20136B680 + (06:25:27, 12 December 2024)
- ML20136B678 + (06:25:28, 12 December 2024)
- ML20136B676 + (06:25:29, 12 December 2024)
- ML20136B674 + (06:25:29, 12 December 2024)
- ML20136B672 + (06:25:30, 12 December 2024)
- ML20136B670 + (06:25:31, 12 December 2024)
- PLA-2530, Monthly Operating Repts for Aug 1985 + (06:25:31, 12 December 2024)
- 05000461/LER-1997-004, :on 970204,failed to Properly Implement TS SR 3.6.5.3.3 Due to Inadequate Procedure.Revised Surveillance Procedure to Verify Valves Closed + (06:25:33, 12 December 2024)
- ML20136B666 + (06:25:34, 12 December 2024)
- ML20136B665 + (06:25:35, 12 December 2024)
- ML20136B662 + (06:25:36, 12 December 2024)
- ML20136B661 + (06:25:37, 12 December 2024)
- ML20136B659 + (06:25:37, 12 December 2024)
- NRC-97-0018, Forwards Nuclear Liability Insurance Documents + (06:25:38, 12 December 2024)
- ML20136B655 + (06:25:40, 12 December 2024)
- ML20136B657 + (06:25:40, 12 December 2024)
- ML20136B654 + (06:25:41, 12 December 2024)
- ML20136B653 + (06:25:41, 12 December 2024)