MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME 6 DATE SEPTEMBER 6, 1985 COMPLsTu BY R.
R.
GOODENOW TELEPHONE (314) 676-8460 PART A OPERATIONS
SUMMARY
AUGUST 1985 Power operations were resumed from the 7/31 Reactor Trip on 8/1.
Full power operations continued until 8/17 when the Axial Flux Difference was discovered to be beyond Technical Specification limits. Power was reduced below 50% until penalty points expired.
Full power operations then continued until 8/20 when a
the unit tripped due to generator loss of field. Unit was put back on line but tripped again on 8/20 due to Hi-Hi Moisture Separator Reheater level. Unit was back on line on 8/21 and returned to full power for the remainder of the month.
PART B PORV AND SAFETY VALVE
SUMMARY
~
NONE e
\\f'%
h 850831
(
h N
CA-#804 05/09/84 QDP-ZZ-04204 Page 1 of 4
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
j UNIT Callaway DATE SEPTEMBER 6.1985 COMPLETED BY R. R. GOODENOW TELEPHONE (314) 676-8460 MONTH AUGUST 1985 a
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 538 3
364 37 1020 759 2
3, 1111 1110 3
39 1101 24 4
5 21 6
1081 472 22 1097 1054 7
23 g
1100 1101 24 1073 1109 g
5 1102 1109 10 26 1100 1109 33 p
12 1080 3
1106 1095 13 1094 29 1104 1100 14 y
1108 1099 15 3
16 1081 l
0 [0 84 l
Page 2 of 4 QDP-ZZ-04204 r
---,,7
A Part D OPERATING DATA REPORT 50-483 DOCKET NO.
Callaway UNIT SEPTEMBER 6, 1985 DATE R. R. GOODN COMPLETED BY (314) 676-8460 TELEPHONE OPERATihG STATUS 744 AUGUST 1985 Gross hours IN REPORTING PERico:
- 1. REPoRTimo PERico:
3411 max. DEPENO. CAPACITY (MWo.Ned:
1120
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWts:
DESIGN ELECTRICAL RATING (MWo.Ned: 1171*
At Stretch reactor power level which is not currently authorized under the operating license.
a
- 3. POWER LEVEL TO WHICM RESTRICTED lip ANY) (MWo.Nett:
- 4. REASONS FOR RESTRICTION IIP ANYl:
THIS MONTH YR TO DATE CUMULATIVE 731.5 5332 5634.5
- 5. NuMcER op McVRS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERVE SMUTDOWN MoWRS 708.5 5214.3 5516.8 7 MOURS GENER ATOR ON LINE 0
- 8. UNIT RESERVE SHUTDOWN McVMS
- 9. GROSS TMERMAL ENERGY GENER ATED tMWHI
,2.??6.770 16.166.769 17.168.294 748,661 5,467,697 5,806,877
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWM).
- 11. NET ELECTRICAL ENERGY GENER ATED tMWM) 710.251 5,185,216 5.508.239 98.37 91.47 91.95
- 12. REACTOR SERVICE P ACTOR 98.37 91.47 91.97
- 13. REACTOR AVAILABILITY P ACTOR 95.2%
89.47 R9.q?
14 UNIT SERVICE PACTOR IS. UNIT AVAILA51LITY PACTOR
, 95.2%
89.47 R9.97 85.27 79.47 90 vr
- 18. UNIT CAPACITY PACTOR IUmas MDC) 81.5%*
75.9%*
76.77*
- 17. UNIT CAPACITY P ACTOR (Uwne Doogn MWel.
4.8%
5.87
~5.57
- 18. UNIT PORCED OUTAGE RATE
- 19. SMUTDOwneS SCHEDULED OVER NExT S MONTHS (TYPt. DATE. ANO DURATION OF EACMI:
NONE
- 20. IF SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED OATE OF STARTUP:
CA-804 05/ 9/84 Page 3 of 4 gep_gg.04204
o s
I e:
- Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE SEPTEMBER 6, 1985 COMPLETED BY R. R. GOODEN0W TELEPHONE (314) 676-8460 REPORT MONTH AUGUST 1985 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED l HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS #nanasNTS 15 850731 Forced 3.2 C
3 Reactor Trip from 100% power due to inadvertent closure of MF1V.
LER 85-036-00 16 850817 Forced 0
G 1
Load reduction in accordance with Technical Specifications due to Axial Flux Difference Cumulated Penalty Time Limit exceeded. LER 85-037-00 17 850820 Forced 19.6 A
3 Turbine Trip from 10D% power due to generator voltage regulator problem.
LER 85-038-00 18 850820 Forced 12.7 G
3 Reactor Trip from 25% power due to incorrect valve line-up for.noisture separator reheater. LER 85-039-00 SURAGARY:
CA-#804
- 05/09/84 Page 4 of 4 QDP-ZZ-04204
W.
~,
,4 4 :,
' U NION ELECTRIC COMPANY CALLAWAY PLANT MAILING ADDRESSt P. O. SOM S BO FULTON. MO. GS3 50 September 9, 1985 Director, Rescurce Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-Il70
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT AUGUST 1985 The enclosed Monthly Operating Report for August 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
k vtd Lv,A-S. E. M11tenberger-
' Manager, Callaway Plant
. DC#Wt-MET /WRC/
/dra Enclosure
- cc: Distribution attached
- . - 4 ?,
4 cc distribution for ULNRC-1170 with enclosures Mr. James G. Keppler
. Regional Administrator, Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC-20555 NRC Resident Inspector
.. -