Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137B837 + (05:15:19, 12 December 2024)
- ML20137B829 + (05:15:20, 12 December 2024)
- NSD-NRC-97-5014, Forwards Draft Seismic Margin Analysis (PRA Chapter 55) & Responses to Requests for Addl Info.Nrc Expected to Review Draft PRA Chapter 55 & Responses Provided in Encl 2 Preparation for Meeting Between Westinghouse & NRC + (05:15:20, 12 December 2024)
- ML20137B827 + (05:15:21, 12 December 2024)
- AECM-86-0008, Submits Evaluation of Test Results of Interplant Communication Sys for NRC Review within 90 Days of Completion.Sys Inadequate in Fire Water Pumphouse & Divs I-III Diesel Generator Bldgs.Design Change Request Issued + (05:15:22, 12 December 2024)
- ML20137B824 + (05:15:22, 12 December 2024)
- ML20137B823 + (05:15:23, 12 December 2024)
- ML20137B822 + (05:15:24, 12 December 2024)
- ML20137B821 + (05:15:25, 12 December 2024)
- ML20137B818 + (05:15:25, 12 December 2024)
- IR 05000338/1985023 + (05:15:26, 12 December 2024)
- ML20137B811 + (05:15:26, 12 December 2024)
- ML20137B809 + (05:15:27, 12 December 2024)
- ML20137B808 + (05:15:28, 12 December 2024)
- ML20137B804 + (05:15:28, 12 December 2024)
- ML20137B801 + (05:15:29, 12 December 2024)
- ML20137B799 + (05:15:29, 12 December 2024)
- ML20137B798 + (05:15:30, 12 December 2024)
- ML20137B797 + (05:15:31, 12 December 2024)
- PNO-I-85-059, on 850815,unplanned 2% Power Excursion Occurred for 3-5 While Increasing Power to Permit Operational Testing of HPCI Sys.Power Ascension Program Testing Suspended Until Problem Resolved + (05:15:31, 12 December 2024)
- ML20137B792 + (05:15:32, 12 December 2024)
- ML20137B785 + (05:15:33, 12 December 2024)
- ML20137B784 + (05:15:33, 12 December 2024)
- ML20137B783 + (05:15:34, 12 December 2024)
- ML20137B782 + (05:15:35, 12 December 2024)
- ML20137B780 + (05:15:36, 12 December 2024)
- ML20137B778 + (05:15:38, 12 December 2024)
- ML20137B779 + (05:15:38, 12 December 2024)
- ML20137B776 + (05:15:39, 12 December 2024)
- ML20137B775 + (05:15:39, 12 December 2024)
- ML20137B771 + (05:15:40, 12 December 2024)
- ML20137B769 + (05:15:41, 12 December 2024)
- ML20137B768 + (05:15:43, 12 December 2024)
- ML20137B764 + (05:15:45, 12 December 2024)
- ML20137B763 + (05:15:46, 12 December 2024)
- ML20137B762 + (05:15:46, 12 December 2024)
- ML20137B757 + (05:15:47, 12 December 2024)
- ML20137B754 + (05:15:48, 12 December 2024)
- 05000305/LER-1985-023, :on 851212,loss of Power to Instrument Bus I Occurred.Caused by Failure of Constant Voltage Transformer. Constant Voltage Transformer Replaced & Instrument Bus Returned to Normal Power Supply + (05:15:49, 12 December 2024)
- ML20137B750 + (05:15:50, 12 December 2024)
- ML20137B748 + (05:15:51, 12 December 2024)
- B11642, Forwards Reviews of Integrated Safety Assessment Program Topics 2.04,2.08,2.11,2.12 & 2.22,in Response to NRC 850731 Request.Topics Include Stud Tensioners & CRD Sys Water Hammer + (05:15:52, 12 December 2024)
- 05000295/LER-1985-047-03, :on 851208,during Startup from Outage for Turbine Repairs,Reactor Power Changed by Greater than 15% in 1 H.Caused by Misunderstanding Between Radiation Protection & Operating Personnel.No Procedure Revs Made + (05:15:54, 12 December 2024)
- 05000325/LER-1985-065, :on 851211,autostarting of Control Bldg Emergency Air Filtration Sys Train 2A Occurred.Caused by Spurious Actuation of Fire Detector Due to Air Flow from Exhaust of Vacuum Cleaner + (05:15:56, 12 December 2024)
- ML20137B739 + (05:15:57, 12 December 2024)
- IR 05000322/1985021 + (05:16:12, 12 December 2024)
- ML20137B737 + (05:16:13, 12 December 2024)
- PY-CEI-NRR-0399, Forwards Addl Info Resolving Outstanding Meteorology & Effluent Treatment Branch Issues,Including NUREG-0737, Item II.F.1 Re Accident Monitoring Instrumentation & Rev 4 to Emergency Plan Implementing Instruction OM15B:EPI-B7b + (05:16:14, 12 December 2024)
- ML20137B721 + (05:16:15, 12 December 2024)
- ML20137B722 + (05:16:15, 12 December 2024)
- 05000361/LER-1985-059, :on 851211,Toxic Gas Isolation Sys Train a Spuriously Actuated During Troubleshooting of Ammonia Analyzer After Analyzer Failed Low.Probably Caused by Loose Power Supply Fuse Holder + (05:16:17, 12 December 2024)