ML20137B801
| ML20137B801 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/13/1986 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Williams J TOLEDO EDISON CO. |
| References | |
| NUDOCS 8601160079 | |
| Download: ML20137B801 (1) | |
Text
1 bm6 JAN 131986 Docket No. 50-346 Toledo Edison Company ATTN: Mr. Joe Williams, Jr.
Senior Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652
Dear Mr. Williams:
Subjecc: Postponement of SALP This letter is to confirm our conversation of November 19, 1985 concerning the issuance of a SALP Report for Davis-Besse. As we discussed, a report for the period September 1, 1984 through November 30, 1985 will not be issued.
In view of the experiences over the past year and major changes which are currently underway, I have concluded that no useful purpose would be served by conducting a SALP for this period.
Instead, I presently plan to issue a SALP Report approximately six (6) months after plant startup. The SALP evaluation will cover the restart effort and the initial period of operation.
Sincerely, Original si$nad.by
' +-*< C. Merc ie r James G. Keppler Regional Administrator cc:
L. Storz, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health We c/r'7
- RIJI, RIII RIII RIII RIII
&g
&V b
3 Burgess /cs
/Chrisotimos
,n le yp/r.
us Davie K
er my ii a p(0 i
8601160079 860113g6 DR ADOCK O