Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137C176 + (05:11:28, 12 December 2024)
- ML20137C174 + (05:11:29, 12 December 2024)
- ML20137C173 + (05:11:30, 12 December 2024)
- FVY-85-104, Revised Application to Amend License DPR-28,revising Tech Specs to Delete Sections Associated W/Requirement That Valves in Equalizer Piping Between Recirculation Loops Be Closed During Reactor Operation + (05:11:31, 12 December 2024)
- ML20137C168 + (05:11:31, 12 December 2024)
- ML20137C165 + (05:11:32, 12 December 2024)
- ML20137C158 + (05:11:34, 12 December 2024)
- ML20137C157 + (05:11:34, 12 December 2024)
- ML20137C156 + (05:11:35, 12 December 2024)
- ML20137C154 + (05:11:36, 12 December 2024)
- 05000369/LER-1985-037-01, :on 851210,Train a ESF Actuation Occurred Due to Actuation of Slave Relay in Reactor Protection Sys.Caused by Personnel Error.Safeguards Safety Injection Signal & Sequencer 1A Reset & Pumps Secured + (05:11:38, 12 December 2024)
- ML20137C152 + (05:11:39, 12 December 2024)
- ML20137C150 + (05:11:40, 12 December 2024)
- ML20137C148 + (05:11:41, 12 December 2024)
- ML20137C146 + (05:11:42, 12 December 2024)
- ML20137C142 + (05:11:43, 12 December 2024)
- ML20137C144 + (05:11:43, 12 December 2024)
- ML20137C141 + (05:11:44, 12 December 2024)
- ML20137C134 + (05:11:49, 12 December 2024)
- ML20137C132 + (05:11:50, 12 December 2024)
- ML20137C128 + (05:11:51, 12 December 2024)
- ML20137C126 + (05:11:52, 12 December 2024)
- BSEP-97-0112, Responds to NRC Re Violations Noted in Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118.Corrective Actions:Test Gauges for RHR & HPCI Sys Replaced & Personnel Involved Was Counseled on Importance of Adherence to SIs + (05:11:53, 12 December 2024)
- ML20137C122 + (05:11:54, 12 December 2024)
- ML20137C123 + (05:11:54, 12 December 2024)
- ML20137C121 + (05:11:55, 12 December 2024)
- ML20137C119 + (05:11:56, 12 December 2024)
- ML20137C115 + (05:11:57, 12 December 2024)
- IR 05000373/1985039 + (05:11:58, 12 December 2024)
- ML20137C111 + (05:11:59, 12 December 2024)
- RBG-22641, Forwards NPDES Permit LA0042731,effective 851119 + (05:11:59, 12 December 2024)
- PNO-IV-85-059, on 851120,notification Received That Individual Suffered Head & Leg Injuries in Fall.Person Contaminated Transferred to Hosp.State of Ks Informed + (05:12:00, 12 December 2024)
- ML20137C108 + (05:12:01, 12 December 2024)
- ML20137C106 + (05:12:02, 12 December 2024)
- ML20137C102 + (05:12:02, 12 December 2024)
- ML20137C099 + (05:12:03, 12 December 2024)
- ML20137C097 + (05:12:04, 12 December 2024)
- ML20137C096 + (05:12:04, 12 December 2024)
- NRC-97-0020, Provides 180-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (05:12:05, 12 December 2024)
- ST-HL-AE-1521, Forwards Response to Draft SER Open Items D2.4-2 Re Essential Cooling Pond (ECP) Seepage Loss Rate & D2.4-6 Re ECP Heat Dissipation Capacity in DBA + (05:12:06, 12 December 2024)
- B11932, Forwards RCS Flow Measurement Uncertainty Analysis,In Response to 851114 Request for More Detail Re Error Analysis Methodology & Breakdown of Individual Instrument Error Components + (05:12:07, 12 December 2024)
- 05000454/LER-1997-004-01, :on 970215,thrust Bearings Were Installed Backwards on Rh & CS Pumps Due to Lack of Specific Sys/Component.Completion of Nwrs Written to Check End Play on Rh & CS Pump Motors Will Be Tracked + (05:12:08, 12 December 2024)
- ML20137C088 + (05:12:12, 12 December 2024)
- ML20137C084 + (05:12:13, 12 December 2024)
- ML20137C082 + (05:12:14, 12 December 2024)
- ML20137C079 + (05:12:15, 12 December 2024)
- BECO-86-001, Application for Amend to License DPR-35,consisting of Proposed Change 86-01,revising Tech Spec Sections Re Operation of Recirculation Sys.Amend in Response to ASLB 840126 Order.Fee Paid + (05:12:15, 12 December 2024)
- ML20137C070 + (05:12:26, 12 December 2024)
- ML20137C071 + (05:12:26, 12 December 2024)
- AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid + (05:12:27, 12 December 2024)
- IR 05000275/1985042 + (05:12:28, 12 December 2024)