Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000458/1996017 + (03:29:49, 12 December 2024)
- 05000528/LER-1985-097, :on 851229,spurious Initiation of Automatic ESF Actuations Occurred.Caused by Component Failure on Computer Card Installed in Radiation Monitor.Defective Computer Card Replaced + (03:29:51, 12 December 2024)
- ML20137P993 + (03:29:52, 12 December 2024)
- 05000289/LER-1986-002, :on 860104,anticipatory Reactor Trip from Turbine Trip Occurred During Power Escalation.Caused by High Moisture Separator Level.Failed Controller Replaced & Power Escalation Recommenced + (03:29:54, 12 December 2024)
- 05000219/LER-1985-023, :on 851211 Re Emergency Svc Water Sys Seismic Concerns.Caused by Original Design Error.Procedures Used to Determine Pump Operability Revised to Change Min Acceptable Flow Rate & Engineering Evaluation Performed + (03:29:56, 12 December 2024)
- 05000250/LER-1985-044, :on 851230,turbine Runback Occurred.Caused by Failure of Primary Detector Coil in Rod Position Indicator for N-9.Applicable Plant Procedures Used to Verify N-9 Still Withdrawn at 228 Steps + (03:29:58, 12 December 2024)
- ML20137P982 + (03:29:59, 12 December 2024)
- ML20137P973 + (03:30:04, 12 December 2024)
- ML20137P970 + (03:30:05, 12 December 2024)
- 05000325/LER-1985-068, :on 851230,2 H Time Frame for Surveillance Testing of Reactor Level Instrument B21-LT-N024A-1 Exceeded & Instrument Not Placed in Tripped Condition.Caused by Technician Error.Technicians Counseled + (03:30:07, 12 December 2024)
- 05000413/LER-1985-072, :on 851226,hourly Firewatch for Diesel Generator Room 1B & Auxiliary Feedwater Pump Room Posted 21 & 2 Minutes Late,Respectively.Caused by Malfunctioning Computer Sys Multiplexer.Procedures Written + (03:30:09, 12 December 2024)
- ML20137P963 + (03:30:10, 12 December 2024)
- ML20137P960 + (03:30:11, 12 December 2024)
- TXX-9702, Responds to NRC Re Violations Noted in Insp Repts 50-445/96-16 & 50-446/96-16.Corrective actions:re-emphasized Supervisory Responsibilities & Self Verification Techniques & Replaced or Tightened Fuse Clips + (03:30:12, 12 December 2024)
- ML20137P956 + (03:30:12, 12 December 2024)
- ML20137P953 + (03:30:13, 12 December 2024)
- NSD-NRC-97-5052, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 8,Electrical Power,For Application for AP600 Design Certification + (03:30:14, 12 December 2024)
- ML20137P948 + (03:30:15, 12 December 2024)
- ML20137P946 + (03:30:15, 12 December 2024)
- ML20137P945 + (03:30:16, 12 December 2024)
- ML20137P941 + (03:30:17, 12 December 2024)
- ML20137P938 + (03:30:17, 12 December 2024)
- ML20137P933 + (03:30:18, 12 December 2024)
- ML20137P932 + (03:30:19, 12 December 2024)
- ML20137P931 + (03:30:19, 12 December 2024)
- ML20137P929 + (03:30:21, 12 December 2024)
- ML20137P927 + (03:30:22, 12 December 2024)
- ML20137P924 + (03:30:22, 12 December 2024)
- ML20137P922 + (03:30:23, 12 December 2024)
- ML20137P919 + (03:30:24, 12 December 2024)
- NSD-NRC-97-5054, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 13,Conduct of Operation,For Application for AP600 Design Certification + (03:30:25, 12 December 2024)
- ML20137P917 + (03:30:25, 12 December 2024)
- ML20137P891 + (03:30:31, 12 December 2024)
- ML20137P883 + (03:30:33, 12 December 2024)
- ML20137P881 + (03:30:34, 12 December 2024)
- ML20137P880 + (03:30:35, 12 December 2024)
- ML20137P878 + (03:30:35, 12 December 2024)
- ML20137P877 + (03:30:36, 12 December 2024)
- ML20137P875 + (03:30:37, 12 December 2024)
- ML20137P874 + (03:30:38, 12 December 2024)
- ML20137P872 + (03:30:39, 12 December 2024)
- ML20137P873 + (03:30:39, 12 December 2024)
- ML20137P871 + (03:30:40, 12 December 2024)
- ML20137P866 + (03:30:41, 12 December 2024)
- ML20137P868 + (03:30:41, 12 December 2024)
- ML20137P864 + (03:30:42, 12 December 2024)
- ML20137P861 + (03:30:43, 12 December 2024)
- ML20137P856 + (03:30:44, 12 December 2024)
- ML20137P855 + (03:30:45, 12 December 2024)
- RBG-22709, Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (03:30:45, 12 December 2024)
- ML20137P850 + (03:30:47, 12 December 2024)
- ML20137P849 + (03:30:48, 12 December 2024)