ML20137P880

From kanterella
Jump to navigation Jump to search
Advises That Page 2 of Attachment 1 to Emergency Plan Implementing Procedure RA-06 Incorrectly Filed in Front of Page 1
ML20137P880
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/30/1986
From:
ILLINOIS POWER CO.
To: Meck R, Simonds S
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-05121, IP-5121, NUDOCS 8602050387
Download: ML20137P880 (2)


Text

ILLINOIS POWER COMPANY

/

NUCLEAR PLANNING & SUPPORT DEPARTMENT o

Controllsd Documant Transmittal I

bf 'Ybb i

\\_

'i Transmittal No. Ip-osigt Transmittal Date t /10 /86 Sheet i

of

_?

T0:

See Distribution List COPY DOCUMENT REV.

NO.

REMARKS No nnc,-ne-c kne--

trnne-ittoa t

Instructions:

Emergency Plan Implementing Procedures attachment 1 of RA-06 page 2 was incorrectly filed in frpnt of page 1.

Please remove and file EPIPS attachment 1 of RA-06 page 2 directly behind page 1.

Maintain in a controlled manner.

Updates will be issued as required.

,3 I i

)

Transfer of accountability or other dispositions will not be made prior to f

'~'

notification and approval of Illinois Power Document Control.

FROM:

SUFERVISOR-NUCLEAR RECORDS:

_Ieh b</)

/Ide G

/

Acknculedge receipt of docu=ents and attach or desercy superceded / voided l

copies as instructed.

Return acknowledged transmittal to Docu=ent Control l

Supervisor, V-790, by 2/14/86* FL

  • Offsite controlled cop, holders 3/1/86.

I have received the documents indicated on this transnittal and have follcwed the instructions.

Signature Date Follow-up Section:

Respcase is due (5) working days af ter follow-up transmittal date.

t Follow-up No. 1 Dated Follow-up No. 2 Dated I have received the documents indicated on this transmittal and have followed instructions.

Signature Date

,r~N Docu=ents listed above were not received.

'\\

l

\\_,/

gh Signature Date Form NP&S 2.51-5 G602050387 060130 l

PDR ADOCK 05000461 0 %

Rev. O l

F PDH

e o

ILLIN0IS POWER COMPANY j

NUCLEAR SUPPORT DEPARTMENT Controlled Distribution List for the NRC IP-05121 Page 2 of 2 CPS EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Revision 3

//

[

Approved:

e,

<_v CA u

/ Date Signyture 201.

R. A. Meck, NRR Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 202.

S. Simonds, NRC Incident Response Branch Div. of Emergency Planning /IE Mail Stop 3302MNBB U.S. Nuclear Regulatory Commission Washington, D.C.

20555

      • 203.

Document Management Branch U.S. Nuclear Regulatory Commission Wasnington, D.C.

20555

_ /

      • 204.s. Document Management Branch 212.

NRC Office V-790 215.

R. Lafreniere U.S. Nuclear Regulatory Commission Region III Incident Response Center 799 Roosevelt Rd.

Glen Ellyn, IL 60137 ATTN:

Ruth Lafreniere 216.

R. Lafreniere 217.

R. Lafreniere s

      • Information Only copies /w Updates (RMG)