ML20137P880
| ML20137P880 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/30/1986 |
| From: | ILLINOIS POWER CO. |
| To: | Meck R, Simonds S NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| IP-05121, IP-5121, NUDOCS 8602050387 | |
| Download: ML20137P880 (2) | |
Text
ILLINOIS POWER COMPANY
/
NUCLEAR PLANNING & SUPPORT DEPARTMENT o
Controllsd Documant Transmittal I
bf 'Ybb i
\\_
'i Transmittal No. Ip-osigt Transmittal Date t /10 /86 Sheet i
of
_?
T0:
See Distribution List COPY DOCUMENT REV.
NO.
REMARKS No nnc,-ne-c kne--
trnne-ittoa t
Instructions:
Emergency Plan Implementing Procedures attachment 1 of RA-06 page 2 was incorrectly filed in frpnt of page 1.
Please remove and file EPIPS attachment 1 of RA-06 page 2 directly behind page 1.
Maintain in a controlled manner.
Updates will be issued as required.
,3 I i
)
Transfer of accountability or other dispositions will not be made prior to f
'~'
notification and approval of Illinois Power Document Control.
FROM:
SUFERVISOR-NUCLEAR RECORDS:
_Ieh b</)
/Ide G
/
Acknculedge receipt of docu=ents and attach or desercy superceded / voided l
copies as instructed.
Return acknowledged transmittal to Docu=ent Control l
Supervisor, V-790, by 2/14/86* FL
- Offsite controlled cop, holders 3/1/86.
I have received the documents indicated on this transnittal and have follcwed the instructions.
Signature Date Follow-up Section:
Respcase is due (5) working days af ter follow-up transmittal date.
t Follow-up No. 1 Dated Follow-up No. 2 Dated I have received the documents indicated on this transmittal and have followed instructions.
Signature Date
,r~N Docu=ents listed above were not received.
'\\
l
\\_,/
gh Signature Date Form NP&S 2.51-5 G602050387 060130 l
PDR ADOCK 05000461 0 %
Rev. O l
F PDH
e o
ILLIN0IS POWER COMPANY j
NUCLEAR SUPPORT DEPARTMENT Controlled Distribution List for the NRC IP-05121 Page 2 of 2 CPS EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Revision 3
//
[
Approved:
e,
<_v CA u
/ Date Signyture 201.
R. A. Meck, NRR Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 202.
S. Simonds, NRC Incident Response Branch Div. of Emergency Planning /IE Mail Stop 3302MNBB U.S. Nuclear Regulatory Commission Washington, D.C.
20555
- 203.
Document Management Branch U.S. Nuclear Regulatory Commission Wasnington, D.C.
20555
_ /
- 204.s. Document Management Branch 212.
NRC Office V-790 215.
R. Lafreniere U.S. Nuclear Regulatory Commission Region III Incident Response Center 799 Roosevelt Rd.
Glen Ellyn, IL 60137 ATTN:
Ruth Lafreniere 216.
R. Lafreniere 217.
R. Lafreniere s
- Information Only copies /w Updates (RMG)