Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Q504 + (03:25:56, 12 December 2024)
- ML20137Q502 + (03:26:03, 12 December 2024)
- ML20137Q498 + (03:26:04, 12 December 2024)
- ML20137Q497 + (03:26:05, 12 December 2024)
- ML20137Q484 + (03:26:06, 12 December 2024)
- ML20137Q486 + (03:26:06, 12 December 2024)
- ML20137Q476 + (03:26:07, 12 December 2024)
- ML20137Q475 + (03:26:08, 12 December 2024)
- ML20137Q471 + (03:26:09, 12 December 2024)
- ML20137Q467 + (03:26:09, 12 December 2024)
- PY-CEI-NRR-0340, Forwards Rev 1 to Procedures Generation Package, Per SER Outstanding Issue 21 Re Development of Emergency Operation Procedures.Info Should Enable Closure of Outstanding Issue 21 in Next Sser + (03:26:10, 12 December 2024)
- B16349, Forwards Addendum 1 to Rev 9 to FSAR for Millstone Nuclear Power Station,Unit 3, Replacing Pages as Required + (03:26:11, 12 December 2024)
- IR 05000445/1985003 + (03:26:18, 12 December 2024)
- ML20137Q456 + (03:26:18, 12 December 2024)
- U-600249, Requests OL Be Granted for Term of 40 Yrs from Date of Issuance.Safety Margins Established W/Understanding of Limitations Imposed by 40 Yr Design Life.No Significant Adverse Environ Impact Associated W/Time Extension Noted + (03:26:20, 12 December 2024)
- ML20137Q440 + (03:26:21, 12 December 2024)
- ML20137Q432 + (03:26:22, 12 December 2024)
- ML20137Q427 + (03:26:23, 12 December 2024)
- 05000313/LER-1985-007-01, :on 850811,reactor Trip Occurred When High Thrust Bearing Wear Indication Caused Main Feedwater Pump (P-1B) Trip.Pumps Modified to Include Metering Valves to Mitigate Spurious Indications + (03:26:25, 12 December 2024)
- ST-HL-AE-1337, Responds to NRC Re Violations Noted in Insp Repts 50-498/85-01 & 50-499/85-01.Corrective Actions:Records Added to File W/Missing Documentation & Record W/Improperly Located Signature Corrected,Per Startup Training Form + (03:26:26, 12 December 2024)
- ML20137Q412 + (03:26:27, 12 December 2024)
- ML20137Q409 + (03:26:28, 12 December 2024)
- ML20137Q403 + (03:26:29, 12 December 2024)
- ML20137Q398 + (03:26:30, 12 December 2024)
- ML20137Q399 + (03:26:30, 12 December 2024)
- 05000293/LER-1978-002-01, /01X-1:on 780120,100-ft Shielding Mast Fell Across 345 Kv Yard Bus Works & Interrupted Power to Startup Transformer from Transmission Line 355.Caused by Cyclical Fatigue Cracking at Stress Points Due to Wind + (03:26:32, 12 December 2024)
- ML20137Q392 + (03:26:33, 12 December 2024)
- ML20137Q394 + (03:26:33, 12 December 2024)
- ML20137Q387 + (03:26:34, 12 December 2024)
- ML20137Q386 + (03:26:35, 12 December 2024)
- IR 05000498/1985001 + (03:26:36, 12 December 2024)
- ML20137Q382 + (03:26:36, 12 December 2024)
- ML20137Q378 + (03:26:37, 12 December 2024)
- ML20137Q375 + (03:26:38, 12 December 2024)
- ML20137Q373 + (03:26:38, 12 December 2024)
- IR 05000461/1985053 + (03:26:48, 12 December 2024)
- ML20137Q367 + (03:26:49, 12 December 2024)
- ML20137Q363 + (03:26:50, 12 December 2024)
- NSD-NRC-97-5048, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 3.2,Classification of Structures,Components & Systems,For Application for AP600 Design Certification + (03:26:50, 12 December 2024)
- ML20137Q362 + (03:26:51, 12 December 2024)
- ML20137Q358 + (03:26:52, 12 December 2024)
- ML20137Q359 + (03:26:52, 12 December 2024)
- NSD-NRC-97-5047, Consolidates Responses & Resolutions of Items Associated W/Ssar Chapter 7 for Application for AP600 Design Certification + (03:26:53, 12 December 2024)
- 05000368/LER-1985-017, :850813,while in Mode 1 at 100% Full Power, Reactor Trip Occurred.Caused by Closing Coil Being Connected to Break Before Make Instead of Make Before Break Auxiliary Switch.Closing Coil Replaced + (03:26:54, 12 December 2024)
- ML20137Q354 + (03:26:55, 12 December 2024)
- ML20137Q350 + (03:26:56, 12 December 2024)
- ML20137Q347 + (03:26:57, 12 December 2024)
- NSD-NRC-97-5053, Confirms Completion of Submittal of Final Documentation Related to Ssar,Chapter 17,Quality Assurance,For Application for AP600 Design Certification + (03:26:57, 12 December 2024)
- ML20137Q346 + (03:26:58, 12 December 2024)
- U-600320, Forwards Variance Request for Reg Guide 1.97, Empirical Determination of Sample Line Loss Correction Factors. Approval Requested for Delaying Empirical Determination of Iodine & Particulate Line Loss Correction Factors + (03:26:59, 12 December 2024)
- ML20137Q344 + (03:26:59, 12 December 2024)
- CY-97-038, Notifies NRC of Change of Status of Sol of Rh Reeves.Sol for Rh Reeves Discontinued + (03:27:00, 12 December 2024)