Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Y784 + (01:30:25, 12 December 2024)
- ML20137Y777 + (01:30:26, 12 December 2024)
- 05000325/LER-1997-002-02, :on 970313,Unit 2 Spray Nozzle Differential Pressure Switch Observed & Questioned.Caused by bi-stable Condition Where Voiding of in-vessel Core Spray Piping Triggered.Setpoint Changed + (01:30:29, 12 December 2024)
- ML20137Y774 + (01:30:30, 12 December 2024)
- ML20137Y773 + (01:30:31, 12 December 2024)
- 05000348/LER-1997-004-01, :on 970318,safety Related 600 Volt Position Sensitive Seismic Qualification Was Not Seismically Qualified in All Positions.Caused by Personnel Error. Operating Procedures Modified + (01:30:32, 12 December 2024)
- 05000366/LER-1985-027-01, :on 850904,during Test,Fuse Blew,Resulting in Automatic Isolation of Inboard Reactor Water Cleanup Primary Containment Isolation Valve.Caused by Jumper Coming Off One Relay Terminal.Fuse Replaced + (01:30:35, 12 December 2024)
- ML20137Y770 + (01:30:36, 12 December 2024)
- ML20137Y763 + (01:30:37, 12 December 2024)
- ML20137Y761 + (01:30:38, 12 December 2024)
- ML20137Y753 + (01:30:39, 12 December 2024)
- ML20137Y752 + (01:30:40, 12 December 2024)
- 05000382/LER-1997-009, :on 970325,discovered Steam Generator (SG) Low Pressure Setpoint Below Ts.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure to Require Channel for Each SG to Be Placed in Bypass During Test + (01:30:42, 12 December 2024)
- ML20137Y747 + (01:30:43, 12 December 2024)
- ML20137Y749 + (01:30:43, 12 December 2024)
- ML20137Y742 + (01:30:44, 12 December 2024)
- ML20137Y746 + (01:30:44, 12 December 2024)
- ML20137Y740 + (01:30:46, 12 December 2024)
- IR 05000277/1985030 + (01:31:26, 12 December 2024)
- ML20137Y738 + (01:31:27, 12 December 2024)
- ML20137Y734 + (01:31:28, 12 December 2024)
- ML20137Y728 + (01:31:30, 12 December 2024)
- 05000334/LER-1985-019, :on 851025,reactor Trip Occurred from 100% Power Due to Receipt of RCS Low Flow Trip Signal in Loop A. Caused by Procedure Deficiency.Procedural Changes Instituted + (01:31:32, 12 December 2024)
- ML20137Y724 + (01:31:33, 12 December 2024)
- ML20137Y723 + (01:31:34, 12 December 2024)
- ML20137Y722 + (01:31:35, 12 December 2024)
- ML20137Y720 + (01:31:36, 12 December 2024)
- ML20137Y716 + (01:31:37, 12 December 2024)
- ML20137Y715 + (01:31:38, 12 December 2024)
- ML20137Y712 + (01:31:39, 12 December 2024)
- ML20137Y709 + (01:31:43, 12 December 2024)
- 05000311/LER-1985-018, :on 850827,component Cooling Water HX Svc Water Outlet Valve (22SW356) (Bi) Failed to Closed Position. Caused by Vibration Problems.Valve Actuator 22SW356 Replaced + (01:31:45, 12 December 2024)
- ML20137Y706 + (01:31:46, 12 December 2024)
- NSD-NRC-97-5070, Forwards Responses for Items Related to SSAR Sections 3.7 & 3.8 + (01:31:47, 12 December 2024)
- ML20137Y704 + (01:31:47, 12 December 2024)
- ML20137Y699 + (01:31:51, 12 December 2024)
- ML20137Y698 + (01:31:51, 12 December 2024)
- ML20137Y693 + (01:31:52, 12 December 2024)
- 05000529/LER-1986-005-01, :on 860130,control Room Essential Filtration Actuation Occurred Due to Train a Instrument & Control Power Failure.Caused by Inadequate Control of Mod to Vital Power Inverter.Inverters Inspected + (01:31:54, 12 December 2024)
- ML20137Y691 + (01:31:55, 12 December 2024)
- ML20137Y689 + (01:31:56, 12 December 2024)
- ML20137Y685 + (01:31:56, 12 December 2024)
- ML20137Y684 + (01:31:57, 12 December 2024)
- ML20137Y680 + (01:32:02, 12 December 2024)
- ML20137Y681 + (01:32:02, 12 December 2024)
- BSEP-97-0135, Application for Amends to Licenses DPR-71 & DPR-62,revising Requirements for Instrumentation Response Time Testing Associated W/Rps,Isolation Actuation Sys & ECCS + (01:32:03, 12 December 2024)
- ML20137Y678 + (01:32:04, 12 December 2024)
- ML20137Y677 + (01:32:05, 12 December 2024)
- NSD-NRC-97-5059, Forwards Responses to Listed Initial Comments on AP600 Revised Ts,Dtd 961224,as Completion of Open Item Tracking Sys Item 4970 + (01:32:06, 12 December 2024)
- ML20137Y675 + (01:32:06, 12 December 2024)
- RBG-22155, Special Rept Providing Details for Measured Structural Settlement Value Outside Limits of Tech Spec Table 3.7.10-1. Change to FSAR Table 2.5-19 & Tech Spec 3.7.10-1 Will Be Submitted to Revise Predicted Settlement + (01:32:07, 12 December 2024)