Forwards Safety Insp Repts 50-277/85-30 & 50-278/85-27 on 850727-0906.No Violations Observed.Concerns Re Mgt & Reporting of Maint & Repair Activities for RHR Valve MO-2-10-154A Discussed
ML20137Y698
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/03/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20137Y703 List:
References
NUDOCS 8510080072
Download: ML20137Y698 (2)


See also: IR 05000277/1985030

Text

.

.

lf

~

.

'

OCT

3 1985

.-

Docket Nos. 50-277/DPR-44

50-278/DPR-56

Philadelphia Electric Company

,

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

.

Philadelphia, Pennsylvania 19101

1

Gentlemen:

Subject: Combined Inspection 50-277/85-30; 50-278/85-27

This transmits the findings of the routine safety inspection by Messrs. J. H.

Williams, T. P. Johnson, and J. E. Beall on July 27 - September 6, 1985, at the

Peach Bottom Atomic Power Station, Delta, Pennsylvania. These findings were

based on observation of activities, interviews, measurements and document

reviews, and have been discussed with Mr. R. S. Fleischmann of your staff.

Within the scope of this inspection, no violations were observed. However, as

indicated in detail 4.2.6 of the enclosed report, we are concerned with the

management and subsequent reporting of the activities associated with mainte-

nance and repair of the RHR valve M0-2-10-154A.

Areas of concern include the

accuracy of the information reported on LER 2-85-03, the adequacy of the

maintenance repair procedures for the valve stem engagement area, and the

quality of the Walworth replacement parts. We understand that a revised LER

2-85-03 and an additional LER describing the latter two valve failures will be

submitted to the NRC. You are requested to provide a written response to these

concerns within 30 days.

In addition, we are concerned with the conduct of

maintenance and repair activities performed by the Maintenance Division of the

Electric Production Department. Consequently, we have scheduled a meeting on

1

October 23, 1985 with your staff to discuss the interfaces and working

!

relationships between the Maintenance Division and Peach Bottom Station.

The response requested by this letter is not subject to the clearance

procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

'

.

$6DI

B510000072 851003

PDR

ADOCK 05000277

i

G

PM

)

g

0FFICIAL RECORD COPY

CIR PB 85-30/27 - 0001.0.0

11/29/80

-

l

l

-

-

- -

-

-

..

'

OCT

31995

.

-

.

Philadelphia Electric Company

2

Your cooperation with us is appreciated.

Sincerely,

Richard W. Starostecki, Director

Division of Reactor Projects

Enclosure:

NRC Combined Inspection Report No. 50-277/85-30 and 50-278/85-27

cc w/ encl:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

A. J. Pietrofitta, General Manager, Power Production Engineering,

Atlantic Electric

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

bec w/encls:

d'

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

R. Gallo, Section Chief, DRP

f

W

ms

n

is

St

o

ec i

0FFICIAL RECORD COPY

CIR PB 85-30/27 - 0002.0.0

11/29/80

,.

1

.

l

.

_