ML20137Y698
| ML20137Y698 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/03/1985 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20137Y703 | List: |
| References | |
| NUDOCS 8510080072 | |
| Download: ML20137Y698 (2) | |
See also: IR 05000277/1985030
Text
.
.
lf
~
.
'
OCT
3 1985
.-
Docket Nos. 50-277/DPR-44
50-278/DPR-56
Philadelphia Electric Company
,
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
.
Philadelphia, Pennsylvania 19101
1
Gentlemen:
Subject: Combined Inspection 50-277/85-30; 50-278/85-27
This transmits the findings of the routine safety inspection by Messrs. J. H.
Williams, T. P. Johnson, and J. E. Beall on July 27 - September 6, 1985, at the
Peach Bottom Atomic Power Station, Delta, Pennsylvania. These findings were
based on observation of activities, interviews, measurements and document
reviews, and have been discussed with Mr. R. S. Fleischmann of your staff.
Within the scope of this inspection, no violations were observed. However, as
indicated in detail 4.2.6 of the enclosed report, we are concerned with the
management and subsequent reporting of the activities associated with mainte-
nance and repair of the RHR valve M0-2-10-154A.
Areas of concern include the
accuracy of the information reported on LER 2-85-03, the adequacy of the
maintenance repair procedures for the valve stem engagement area, and the
quality of the Walworth replacement parts. We understand that a revised LER
2-85-03 and an additional LER describing the latter two valve failures will be
submitted to the NRC. You are requested to provide a written response to these
concerns within 30 days.
In addition, we are concerned with the conduct of
maintenance and repair activities performed by the Maintenance Division of the
Electric Production Department. Consequently, we have scheduled a meeting on
1
October 23, 1985 with your staff to discuss the interfaces and working
!
relationships between the Maintenance Division and Peach Bottom Station.
The response requested by this letter is not subject to the clearance
procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
A copy of this letter and the enclosures are being placed in the NRC Public
Document Room.
'
.
$6DI
B510000072 851003
ADOCK 05000277
i
G
)
g
0FFICIAL RECORD COPY
CIR PB 85-30/27 - 0001.0.0
11/29/80
-
l
l
-
-
- -
-
-
..
'
OCT
31995
.
-
.
Philadelphia Electric Company
2
Your cooperation with us is appreciated.
Sincerely,
Richard W. Starostecki, Director
Division of Reactor Projects
Enclosure:
NRC Combined Inspection Report No. 50-277/85-30 and 50-278/85-27
cc w/ encl:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
A. J. Pietrofitta, General Manager, Power Production Engineering,
Atlantic Electric
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
bec w/encls:
d'
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
R. Gallo, Section Chief, DRP
f
W
ms
n
is
St
o
ec i
0FFICIAL RECORD COPY
CIR PB 85-30/27 - 0002.0.0
11/29/80
,.
1
.
l
.
_