Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140E320 + (21:43:18, 11 December 2024)
- IR 05000498/1985026 + (21:43:21, 11 December 2024)
- ML20140E317 + (21:43:21, 11 December 2024)
- ML20140E314 + (21:43:22, 11 December 2024)
- ML20140E316 + (21:43:22, 11 December 2024)
- 05000315/LER-1984-031-01, :on 841209,axial Flux Difference Monitor Alarm Restored to Operable Status W/O Monitoring Indicator Once Per Hour.Requalification Training Program Revised + (21:43:24, 11 December 2024)
- ML20140E312 + (21:43:25, 11 December 2024)
- ML20140E311 + (21:43:26, 11 December 2024)
- 05000352/LER-1984-027, :on 841207,svc Water Sys Effluent Line Gross Radioactivity Sample Not Obtained within 8 H Period.Caused by Personnel Error.Supervisor Counseled + (21:43:27, 11 December 2024)
- ML20140E308 + (21:43:28, 11 December 2024)
- ML20140E307 + (21:43:29, 11 December 2024)
- ML20140E306 + (21:43:30, 11 December 2024)
- ML20140E305 + (21:43:30, 11 December 2024)
- ML20140E304 + (21:43:31, 11 December 2024)
- 05000281/LER-1984-017-02, :on 841207,drawing Error,Discovered During Tagging Record Review,Indicated That Auxiliary Feedwater Crosstie Capability Unavailable During 840929-1115.Drawing Change Request Initiated + (21:43:32, 11 December 2024)
- ML20140E300 + (21:43:33, 11 December 2024)
- ML20140E299 + (21:43:34, 11 December 2024)
- ML20140E298 + (21:43:35, 11 December 2024)
- 05000413/LER-1984-028-02, :on 841205,breaker 1ETA-3 Tripped Open Initiating ESF Actuation & Causing Bus 1ETA to Load Shed, Breaker 1EATA-18 to Close & All Blackout Load Groups to Energize.Cause Unknown + (21:43:36, 11 December 2024)
- ML20140E296 + (21:43:37, 11 December 2024)
- ML20140E295 + (21:43:38, 11 December 2024)
- 05000293/LER-1984-016, :on 841207,power Lost to 120-volt Ac Safeguards Bus (Y4) B.Caused by non-licensed Cognitive Personnel Error. Power Loss Resulted in Group 6 Containment Isolation. Personnel Counseled + (21:43:40, 11 December 2024)
- ML20140E293 + (21:43:41, 11 December 2024)
- ML20140E292 + (21:43:42, 11 December 2024)
- ML20140E289 + (21:43:43, 11 December 2024)
- ML20140E288 + (21:43:44, 11 December 2024)
- ML20140E286 + (21:43:45, 11 December 2024)
- ML20140E287 + (21:43:45, 11 December 2024)
- ML20140E285 + (21:43:46, 11 December 2024)
- 05000285/LER-1984-023, :on 841118,19 & 24,radiation Monitor RM-060 Ventilation Isolation Signal Actuated.Caused by Leak of Gas to Auxiliary Bldg.Leak Located & Stopped.Monitor Recalibr & Spray Valve Repaired + (21:43:48, 11 December 2024)
- ML20140E279 + (21:43:49, 11 December 2024)
- ML20140E280 + (21:43:49, 11 December 2024)
- ML20140E277 + (21:43:50, 11 December 2024)
- 05000361/LER-1984-072, :on 841130,radiation Monitors 2/3 RI-7825 & 2/3 RI-7824 Found in Alarm Defeat.Cause Unknown.Monitors Immediately Placed in Normal Mode + (21:43:52, 11 December 2024)
- 05000346/LER-1997-010, :on 970504,Main Transformer Deluge Sys Automatically Actuated Due to Degraded Temp Sensor in Transformer Fire Detection Sys.Replaced Damaged Main Transformer & Sensors That Actuate Deluge Sys + (21:43:53, 11 December 2024)
- ML20140E270 + (21:43:55, 11 December 2024)
- ML20140E269 + (21:43:55, 11 December 2024)
- ML20140E265 + (21:43:56, 11 December 2024)
- ML20140E264 + (21:43:57, 11 December 2024)
- ML20140E263 + (21:43:57, 11 December 2024)
- IR 05000423/1985070 + (21:43:58, 11 December 2024)
- ML20140E261 + (21:43:58, 11 December 2024)
- ML20140E260 + (21:43:59, 11 December 2024)
- 05000269/LER-1984-007-04, :on 841203,reactor Tripped from 57% Full Power. Caused by Low Oil Pressure from shaft-driven Oil Pump W/Main Feedwater Pump 1B Turbine Auxiliary Oil Pump (Mfwptaop) Switched Off & 1A Mfwptaop Out of Svc + (21:44:04, 11 December 2024)
- NLS8500349, Responds to NRC Re Violations Noted in Insp Rept 50-298/85-30.Corrective Actions:Site Tour Surveillances Conducted by QA Staff Since 850701 Reviewed & Discrepancies Noted in Future Surveillances Will Be Reported + (21:44:05, 11 December 2024)
- ML20140E256 + (21:44:06, 11 December 2024)
- ML20140E252 + (21:44:07, 11 December 2024)
- ML20140E253 + (21:44:07, 11 December 2024)
- 3F0697-23, Confirms That FPC Has Implemented Administrative Controls, Revised PORV Setpoint & Revises Commitment to Submit TS Change Request for LTOP Features at Plant + (21:44:08, 11 December 2024)
- ML20140E249 + (21:44:08, 11 December 2024)
- ML20140E247 + (21:44:09, 11 December 2024)