Text
7
'
,
,,
.
s
JAN 2 91988
In Reply Refer To:
Dockets: ' 50-313/85-27
50-368/85-28
Arkansas Power & Light Company
ATTN:
John M. Grif fin,
Senior Vice President -
Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
C. C. Harbuck of this office during the period December 1-31, 1985,-of
activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas
Nuclear One, Units 1 and 2, and to the discussion of our findings with
Mr. J. M. Levine, and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, followup on previously identified items, followup on
licensee event reports, followup on Three Mile Island Action Plan requirements,
IE Circular review, procurement program implementation, containment purge, and
control room ventilation.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The findings are documented in
the enclosed inspection report.
'
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
A written response is not
required for the violation involving a broken chain on a locked valve, since
adequate corrective action was taken and confirmed during this inspection
period.
i
During this inspection, it was found that certain of your activities appeared
to deviate from commitments made to the NRC.
This item and references to the
i
commitments are identified in the enclosed Notice of Deviation.
You are
RIV:SRIh
RI
['
DMHunn@icutt
RPB/B
RPB
/
WDJohnson/ g
CCHarbtck
JEGag i rdo
g /p /86
)/p/86
)/p/86
/ /27 83
hb0
bbh
{
G
-
-.
.
.
=
.
-. .-
.
-.
..
>
. .,
- ,
'
t
c
Arkansas Power & Light Company
-2-
<
3
1
' requested to respond to this deviation in writing.
Your response should be
based on the~ specifics contained in the Notice of Deviation enclosed with this
,
. 1etter.
.
>
t
The responses directed by this letter and the accompanying Notices are not
-
'
' subject to the, clearance procedures ~of'the Office of Management and Budget as
.
. required by.the Paperwork Reduction Act of 1980, PL 96-511.
Le e
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
.
.
Sincerely,
,
S.
Origina! SignST By
J. E. Gagliardo
!
J. E. Gagliardo, Chief
Reactor Projects Branch
i
.
Enclosures:
1.
Appendix A - Notice of Violation
l
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
l
50-313/85-27
'
50-368/85-28
cc w/ enclosures:
J. M. Levine, General Manager
Arkansas Nuclear One
P.-0. Box 608
Russellvilie, Arkansas 72801
Arkansas Radiation Control Program Director
bcc to'0MB (IE01)
bec distrib. by RIV:
- RPB
- Resident Inspector
R. D. !iartin, RA
- EP&RPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV File
E. H. Johnson, DRS&P
- RSB
- MIS SYSTEM
- RSTS Operator
- 0RSP
- w/766
l
!
l
t
I
i
I
I
!
i
L ._