Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141F274 + (20:18:24, 11 December 2024)
- ML20141F273 + (20:18:24, 11 December 2024)
- ML20141F272 + (20:18:25, 11 December 2024)
- NSD-NRC-97-5208, Forwards Rev 2 of W Response to RAI 410.263 on Feedwater Sys Design & Testing in Response to NRC Ltr Water Hammer Test for AP600 Condensate & Feedwater Sys, Dtd 970603. Response Includes SSAR Markup of Test Abstract 14.2.9.1.7 + (20:18:26, 11 December 2024)
- ML20141F271 + (20:18:26, 11 December 2024)
- ML20141F266 + (20:18:30, 11 December 2024)
- ML20141F263 + (20:18:31, 11 December 2024)
- ML20141F262 + (20:18:31, 11 December 2024)
- ML20141F261 + (20:18:32, 11 December 2024)
- ML20141F260 + (20:18:32, 11 December 2024)
- ML20141F259 + (20:18:33, 11 December 2024)
- ML20141F257 + (20:18:34, 11 December 2024)
- 05000263/LER-1985-018, :on 851015,reactor Bldg Ventilation Isolation & Standby Gas Treatment Sys Initiation Occurred.Caused by Upscale Trip from Monitor When Trip Check Push Button Released.Upscale Trip Reset + (20:18:36, 11 December 2024)
- NSD-NRC-97-5205, Provides Explanation as to Why It Would Be Inappropriate to Include Subsystem in TS & Provide Short Term Availability Controls for Hydrogen Igniters as Alternative + (20:18:37, 11 December 2024)
- ML20141F252 + (20:18:38, 11 December 2024)
- ML20141F250 + (20:18:39, 11 December 2024)
- NSD-NRC-97-5199, Responds to NRC Comment Re AP600 TS Steam Generator Tube Surveillance Program.Markup of TS 5.5.5 Encl,For NRC Review. Open Item Tracking Sys Item 5526 Completed + (20:18:40, 11 December 2024)
- ML20141F240 + (20:18:40, 11 December 2024)
- B16538, Forwards NRC Forms 398 & 396 for Listed Candidates Re License Applications for Exams Scheduled for Week of 970707. & List of Regulatory Commitments.W/O Forms 398 & 396 + (20:18:42, 11 December 2024)
- ML20141F239 + (20:18:42, 11 December 2024)
- ML20141F237 + (20:18:43, 11 December 2024)
- ML20141F236 + (20:18:44, 11 December 2024)
- ML20141F235 + (20:18:44, 11 December 2024)
- ML20141F234 + (20:18:46, 11 December 2024)
- ML20141F233 + (20:18:46, 11 December 2024)
- ML20141F232 + (20:18:47, 11 December 2024)
- ML20141F231 + (20:18:48, 11 December 2024)
- ML20141F226 + (20:18:50, 11 December 2024)
- 3F0597-01, FPC Crystal River,Unit 3 Annual Radiological Environ Operating Rept,1996 + (20:18:51, 11 December 2024)
- 05000454/LER-1997-011-04, :on 970527,missing Support on Oil Cooler Caused SI Pump to Be Inoperable Due to Work Process Deficiency.Post Maint Verifications Will Be Added to Model Work Request to Provide Clear Insp + (20:18:53, 11 December 2024)
- ML20141F223 + (20:18:54, 11 December 2024)
- ML20141F222 + (20:18:54, 11 December 2024)
- ML20141F218 + (20:18:55, 11 December 2024)
- ML20141F217 + (20:18:56, 11 December 2024)
- ML20141F215 + (20:18:56, 11 December 2024)
- ML20141F214 + (20:18:57, 11 December 2024)
- ML20141F207 + (20:18:58, 11 December 2024)
- VPN-050-97, Forwards Rev 3 to Tnp Decommissioning Plan. Rev Reflects Radwaste Processing in Condensate Demineralizer Bldg, Approved License Amend 196,various Decommissioning Activities & Some Editorial Changes + (20:18:59, 11 December 2024)
- ML20141F204 + (20:19:00, 11 December 2024)
- ML20141F200 + (20:19:37, 11 December 2024)
- ML20141F196 + (20:19:38, 11 December 2024)
- U-602766, Submits Status of Investigation Into Inappropriate Use of Solder Flux as Related to MCR Neon Light Socket Failures at Plant.Addl Checks Will Be Performed to Confirm Scope of Affected Work Documents + (20:19:38, 11 December 2024)
- ML20141F190 + (20:19:39, 11 December 2024)
- ML20141F192 + (20:19:39, 11 December 2024)
- ML20141F178 + (20:19:44, 11 December 2024)
- ML20141F177 + (20:19:45, 11 December 2024)
- 05000286/LER-1985-010-01, :on 851129,unit Tripped Due to Inadvertent Main Boiler Feedpump Shutdown & Low Water Level in Steam Generator 34.Caused by Painter Inadvertently Actuating Trip Lever.Painters Reinstructed + (20:19:47, 11 December 2024)
- ML20141F174 + (20:19:48, 11 December 2024)
- ML20141F173 + (20:19:50, 11 December 2024)
- ML20141F166 + (20:19:51, 11 December 2024)
- RC-97-0101, Monthly Operating Rept for Apr 1997 for VC Summer Nuclear Station Unit 1 + (20:19:52, 11 December 2024)