Forwards Safety Evaluation & Science Applications Intl Corp Technical Evaluation Rept Supporting Util 830627,840626 & 0814 Requests for Relief from Second 10-yr Inservice Testing Requirements Conditional of Relief Request Status
ML20141F177
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/11/1986
From: Varga S
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20141F182 List:
References
NUDOCS 8602250451
Download: ML20141F177 (4)


Text

m I

February 11, 1986 i

l

[DISTRIBUTIONDocket File 3 ORB #1 Rdg l Docket Nos. 50-295 LPDR PDR l and 50-304 Gray File H. Thompson OELD R. Eckenrode J. Stang E. Jordan B. Grimes J. Partlow J. Norris C. Parrish Mr. D. L. Farrar ACRS 10 H. Denton Director of Nuclear Licensing j Comonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 - RELIEFS FROM THE

! SECOND TEN-YEAR INSERVICE TESTING REQUIREMENTS 10 CFR 50.55a(g) requires ASME Code Class 1, 2, and 3 components (including supports) of a boiling or pressurized water-cooled nuclear power facility to meet the requirements set forth in Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, of the ASME Boiler and Each facility is required to have an inspection Pressure Vessel Code.

program plan which is updated every ten years to meet the requirements of the latest approved edition and addenda of Section XI. This program plan is submitted to the NRC for review of the licensee's compliance with the Regulation which entails verifying that the program plan is based on the correct Code edition and addenda, verifying that the correct systems, sampling plans, and nondestructive examination methods have been incorporated, and evaluating the efficacy of proposed alternative examinations and tests to be performed in lieu of the requirements.

By letters dated June 27, 1983, June 26, 1984, and August 14, 1984, Comonwealth Edison Company (CECO) submitted to the NRC the Inservice Inspection (ISI) Plan and additional information for the second ten-year interval (December 31, 1983 to December 31, 1993 for Unit I and

' September 19, 1984 to September 19, 1994 for Unit 2) for Zion Nuclear Power Station, Units 1 and 2. The submittal included requests for relief from certain hydrostatic testing requirements of the ASME Boiler and Pressure Vessel Code.

The plan was reviewed and evaluated with technical assistance from Science Applications International Corporation (SAIC). The details of that review are contained in the Technical Evaluation Report (TER), which is enclosed as an attachment to our Safety Evaluation (SE). We have reviewed CECO ,

submittal and the TER prepared by SAIC on requests for relief from those examination requirements determined to be impractical to perform at Zion Units 1 and 2. Our review has determined that some of the code l

8602250451 860211 PDR ADOCK 05000295 G PDR I

i.

Mr. D. L. Farrar February 11,.1986 requirements for the sp . fied systems are impractical and the granting of the relief is authorized by law and will not endanger life or property or the coninon defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. Detailed technical assessment is contained in the enclosed Safety Evaluation. Based on our conclusion, pursuant to 10 CFR 50.55a(g)(6)(1), we grant the relief for those requirements which we have detennined to be impractical to

perform and deny relief in cases where the necessary finding could not be made. In each case the grcnting is conditioned on performance of both the proposed alternate examination and the provision listed in the column

" Relief Request Status".

/s/JNorris for SVarga Steven A. Varga, Director PWR Project Directorate #3 Division of PWR Licensing-A

Enclosure:

As stated cc w/ enclosure:

See next page P

  • SEEPREVIOUS@ITEFORCpN RR (
  • lll \

ORBf1:DL* -

D  :(:DL*

CParrish JNorr 11/05/85 \12' k

85

  • 1 12

' eN S 85 ,

(

  • I

-11/^@^5Iwpf,4

!1/w 7 h (

7 Mr. D. L. Farrar ,

requirements for the specified systems are impractical and the granting of the relief is authorized by law and will not endanger life or property or the comon defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. Detailed technical assessment is contained in the enclosed Safety Evaluation. Based o our conclusion, pursuant to 10 CFR 50.55a(g)(6)(1), we grant the relie for those requirements which we have determined to be impractical .to f perfonn and deny relief in cases where the necessary finding c Id not be

! made.

Harold R. Denton, D ector Office of Nuclear eactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page e

L h, Q()# f>

A Vh gqT D

OELD j f 11/ /85 l ORB #1:DW ORB'1 L RB#1:DL A R- D: L NRR CParris W , ws arga Gla s HTh n DE t 114/85 J(No 1

.1G85 /

NRR[

HD. on

/

I i

\ ,

I Mr. D. L. Farrar Comonwealth Edison Company Zion Station cc:

Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinoi: Departmerit of Nuclear Safety Dr. Cecil Lue-Hing 10L Outer Park Drive, 5th Floor Director of Research and Development Springfield, Illinois 62704 Metropolita'n Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza .^

. 51st Floor Chicago, Illinois 60602 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety

~

ATTN: Manager, Nucle.ar Facility Safety - -

1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Comission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 I

__ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _