Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147B542 + (18:43:27, 11 December 2024)
- ML20147B540 + (18:43:28, 11 December 2024)
- ML20147B538 + (18:43:29, 11 December 2024)
- ML20147B533 + (18:43:30, 11 December 2024)
- ML20147B534 + (18:43:30, 11 December 2024)
- ML20147B531 + (18:43:31, 11 December 2024)
- ML20147B528 + (18:43:32, 11 December 2024)
- ML20147B530 + (18:43:32, 11 December 2024)
- ML20147B524 + (18:43:33, 11 December 2024)
- NRC-87-0232, Responds to NRC Re Violations Noted in Insp Rept 50-341/87-44.Corrective Actions:Procedures 44.020.235 & 44.020.236 Revised to Verify Continuity of Parallel Contact to Overlap Between Relays E51-K58,E51-K59 & E51-K60,E51-K61 + (18:43:34, 11 December 2024)
- ML20147B523 + (18:43:34, 11 December 2024)
- ML20147B518 + (18:43:35, 11 December 2024)
- ML20147B516 + (18:43:37, 11 December 2024)
- ML20147B517 + (18:43:37, 11 December 2024)
- ML20147B513 + (18:43:38, 11 December 2024)
- ML20147B508 + (18:43:39, 11 December 2024)
- ML20147B510 + (18:43:39, 11 December 2024)
- 05000269/LER-1987-011-04, :on 871202,cable Room Sprinkler Sys Could Not Provide Design Flow.Caused by Design Deficiency.Fire Watches Established Until Sys Operable,Restoring Sys to Operable Condition by Increasing Supply Line Diameter + (18:43:41, 11 December 2024)
- ML20147B505 + (18:43:42, 11 December 2024)
- PNO-III-97-006, on 970129,inspector Learned That 12 Muzzle Reference Sensors Were Missing from Shipment of Refurbished Devices & Licensee Did Not Make Rept to Nrc.Licensee Search & Investigation for Sensors Continuing + (18:43:43, 11 December 2024)
- ML20147B500 + (18:43:43, 11 December 2024)
- ML20147B495 + (18:43:44, 11 December 2024)
- ML20147B494 + (18:43:45, 11 December 2024)
- ML20147B491 + (18:43:46, 11 December 2024)
- ML20147B489 + (18:43:47, 11 December 2024)
- 05000498/LER-1987-021, :on 871130,unanticipated Bus Trip & Diesel Generator Start Occurred.Cause Could Not Be Conclusively Determined.Technicians Received Training on Deenergizing ESF Sequencer by Opening Main Circuit Breaker + (18:43:48, 11 December 2024)
- ML20147B485 + (18:43:49, 11 December 2024)
- ML20147B483 + (18:43:50, 11 December 2024)
- ML20147B479 + (18:43:51, 11 December 2024)
- ML20147B480 + (18:43:51, 11 December 2024)
- ML20147B476 + (18:43:52, 11 December 2024)
- ML20147B472 + (18:43:53, 11 December 2024)
- ML20147B468 + (18:43:53, 11 December 2024)
- ML20147B467 + (18:43:54, 11 December 2024)
- ML20147B462 + (18:43:55, 11 December 2024)
- ML20147B464 + (18:43:55, 11 December 2024)
- ML20147B461 + (18:43:56, 11 December 2024)
- ML20147B460 + (18:43:56, 11 December 2024)
- ST-HL-AE-5555, Provides Draft Amended & Restated Participation Agreement, Draft Operating Agreement & Markup of Pages Reflecting Minor Editorial Changes + (18:43:58, 11 December 2024)
- ML20147B455 + (18:43:59, 11 December 2024)
- ML20147B456 + (18:43:59, 11 December 2024)
- ML20147B454 + (18:44:00, 11 December 2024)
- ST-HL-AE-2515, Responds to Notice of Violation & Proposed Imposition of Civil penalty-Enforcement Action EA-87-240.Corrective Actions:High Head Safety Injection Cold Leg Valves Opened & Plant Surveillance Procedures Revised to Correct Setpoint + (18:44:03, 11 December 2024)
- ML20147B451 + (18:44:04, 11 December 2024)
- ML20147B450 + (18:44:05, 11 December 2024)
- ML20147B447 + (18:44:05, 11 December 2024)
- ML20147B446 + (18:44:06, 11 December 2024)
- ML20147B445 + (18:44:07, 11 December 2024)
- ML20147B444 + (18:44:07, 11 December 2024)
- ML20147B443 + (18:44:08, 11 December 2024)
- ML20147B442 + (18:44:08, 11 December 2024)